Network Scenarios

Step 1

1
2
3

1
1.1
1.2
1.3
1.4
1.5
1.6
1.7

2
2.1
2.2
2.3
2.4
2.5
2.6

Unrestricted
1
2
3

1
1.1
1.2
1.3
1.4
1.5
1.7
1.8
1.9
2
2.1
2.2

2
2.1
2.2
2.3
2.4
2.5
2.6

Unrestricted
work Scenarios

Network Status1
Network Status2
Network Status3

Below Test steps shall be applicable for network status 1 or network status 2

Prerequisties Steps
All load are connected as per load shedding list table
Load shedding is enabled
Set 8380 KW of OP limit in HMI for each GTG(GTG1 and GTG2)
Set Active power of each GTG GTG1/GTG2 to 7454 KW of OP limit in HMI
Check Total Spinning reserve = (8380*2)-(14908) which is 16760 - 14908 = 1852 KW

Test Scenario Fast load shed: GTG Trip or GTG breaker Trip
Trip GTG1
Spinning reserve with losss of one GTG = 8380-14908 = -6528 KW
Verify if load shed equal 6528 KW as spinning reserve is negative
Verify the timestamp of sample load in the load shedding list to check if load shed executed within XX ms
Record the time difference between GTG trip and Load shed command
Reset the trip which bring back Generator online
Repeat steps for Next GTG

Test Scenario Fast load shed: Underfrequency Load shed


Simulate Frequency such that it falls below the Underfrequency setpoint 1
Check if the loads are shed at the MW setpoint set in HMI for first stage Underfrequency
Verify the timestamp of sample load in the load shedding list to check if load shed executed within XX ms
Record the time difference between GTG trip and Load shed command
Repeat steps 2.1 to 2.4 for Underfrequency setpoint 2
Reset the trip which bring back Generator online

Below Test steps shall be applicable for network status 3

Prerequisties Steps
All load are connected as per load shedding list table
Load shedding is enabled

Unrestricted
Set 8380 KW of OP limit in HMI for each GTG(GTG1 and GTG2)
Set Active power of each GTG GTG1/GTG2 to 7454 KW of OP limit in HMI
Check Total Spinning reserve = (8648*3)-(19866) which is 25944 - 9866 = 6078 KW

Test Scenario Fast load shed: GTG Trip or GTG breaker Trip
Trip GTG1
Spinning reserve with losss of one GTG = 17296-19866 = -2570 KW
Verify if load shed equal 2570 KW as Spinning reserve is negative
Verify the timestamp of sample load in the load shedding list to check if load shed executed within XX ms
Record the time difference between GTG trip and Load shed command
Trip GTG2
Spinning reserve with losss of two GTG = 8648 - 17296 = -8648 KW
Verify if load shed equal 8648 KW as Spinning reserve is negative
Verify the timestamp of sample load in the load shedding list to check if load shed executed within XX ms
Record the time difference between GTG trip and Load shed command
Reset the trip which bring back Generator online

Test Scenario Fast load shed: Underfrequency Load shed


Simulate Frequency such that it falls below the Underfrequency setpoint 1
Check if the loads are shed at the MW setpoint set in HMI for first stage Underfrequency
Verify the timestamp of sample load in the load shedding list to check if load shed executed within XX ms
Record the time difference between GTG trip and Load shed command
Repeat steps 2.1 to 2.4 for Underfrequency setpoint 2
Reset the trip which bring back Generator online

Unrestricted
GTG1 GTG2 GTG3 BUSTIE AC BUSTIE CB
Closed Closed Closed
Closed Closed Closed
Closed Closed Closed Closed Closed

Unrestricted
Fast Load shed

Trip GTG1
Step 1

Step 2
Step 3
step 4
step 5
step 6

Trip GTG1
Step 1

Step 2
Step 3
step 4
step 5
step 6

Trip GTG2
Step 1

Step 2
Step 3
step 4
step 5
step 6
step 7
step 8
step 9
step 10

Bustie scenraio
Step 1

Step 2
Step 3

step 4
step 5

Step 1

Step 2

Step 3

step 4
step 5
When OP limits is not set

GTG1
Closed
Set turbine capabiltiy to 9.342 mw
Turn off OP limit in HMI for each GTG(GTG1 and GTG2)
Set Active power of each GTG GTG1/GTG2 to 7454 KW in HMI
Check Total Spinning reserve = (9342*2)-(14908) which is 18684 - 14908 = 3776 KW
Trip GTG1 /GTG2 only 1 GTG should trip
Verify if load shed equal or more 5566 KW as spinning reserve is negative

GTG2
Closed
Set turbine capabiltiy to 9.342 mw
Turn off OP limit in HMI for each GTG(GTG1 and GTG2)
Set Active power of each GTG GTG1/GTG2 to 7454 KW in HMI
Check Total Spinning reserve = (9342*2)-(14908) which is 18684 - 14908 = 3776 KW
Trip GTG2 /GTG3 any GTG only 1 GTG should trip
Verify if load shed equal 5566 KW as spinning reserve is negative

GTG1
Closed
Set turbine capabiltiy to 9.342 mw
Turn off OP limit in HMI for each GTG(GTG1 and GTG2 and GTG3)
Set Active power of each GTG GTG1/GTG2/GTG3 to 6622 KW in HMI
Check Total Spinning reserve = (9342*3)-(19866) which is 28026 - 19866 = 8160 KW
Trip anyone GTG
Spinning reserve with losss of one GTG = 18684-19866 = -1182 KW
check the sum of the load shed as per the proiprity is equal to or greater 1182 kw
Trip anyone GTG from reamining GTG
Spinning reserve with losss of two GTG = 9342 - 17296 = -7954 KW
check the sum of the load shed as per the proiprity is eqaul to or greater 7954kw

GTG1
Closed

set OP lim such that sum of the active power of load under GTG1 is > Oplim -GTG1
set Op lim such that sum of active power of the load under GTG2 is < Oplim(GTG2)
Trip Bustie AC
Check if load tripped under GTG1 as precaculated difference between Active power of GTG1 and Oplim of
GTG1 is negative.

GTG1
Opened

set OP lim such that sum of the active power of load under GTG3 is > Oplim -GTG3

set Op lim such that sum of active power of the load under GTG2 is < Oplim(GTG2)
Trip Bustie BC
Check if load tripped under GTG3 as precaculated difference between Active power of GTG3 and Oplim of
GTG3is negative.
GTG2 BUSTIE AC
Closed Closed

GTG3 BUSTIE CB
Closed Closed

GTG2 GTG3
Closed Closed

load shed will be 1182 or more as per the load active powers

GTG2 GTG3
Closed Open

Note when Bustie is tripped then Spinning reserve


=Total Active power of GTG1 - OPLIm of GTG1 will be
negative Tubriner cap 1
Note when Bustie is tripped then Spinning reserve
=Total Active power of GTG2 - OPLIm of GTG2 will be
zero or >0 11.47

Loads on connected to GTG1 1 shall be tripped as per the spinning rerver value in stp2

GTG2 GTG3
Closed Closed

Note when Bustie is tripped then Spinning reserve


=Total Active power of GTG3 - OPLIm of GTG3 will be
negative Tubriner cap 1

Note when Bustie is tripped then Spinning reserve


=Total Active power of GTG2 - OPLIm of GTG2 will be
zero or >0 11.47

Loads on connected to GTG3 shall be tripped as per the spinning rerver value in stp2
BUSTIE AC BUSTIE CB
Closed Closed

BUSTIE AC BUSTIE CB
Closed Open

Active 12.47 mw
9.47

pinning rerver value in stp2

BUSTIE AC BUSTIE CB
Opened Closed

Active 12.47 mw

9.47

nning rerver value in stp2


Trip 1 GTG
Step 1

Step 2
Step 3
step 4
step 5
step 6

Trip 1 GTG
Step 1

Step 2
Step 3
step 4
step 5
step 6

Trip 2 GTG's
Step 1
produced power 9342 kW
Step 2
Step 3
step 4
step 5
step 6
step 7
step 8
step 9
step 10

Bustie scenario

Step 1
Step 2

Step 3

step 4
step 5

Step 1

Step 2

Step 3

step 4
step 5

2
2.1
2.2
2.3
2.4
2.5
2.6
Fast Load shed
Total 2 GTG Running

GTG1
Closed
Set turbine capabiltiy to 9342
Set 8380 KW of OP limit in HMI for each GTG(GTG1 and GTG3)
Set Active power of each GTG GTG1/GTG3 to 7454 KW in HMI
Check Total Spinning reserve = (8380*2)-(14908) which is 16760 - 14908 = 1852 KW
Trip GTG1 /GTG3 only 1 GTG should trip
Verify if load shed equal 6528 KW as spinning reserve is negative due to 1 GTG trip

Total 2 GTG Running

GTG2
Closed
Set 8380 KW of OP limit in HMI for each GTG(GTG2 and GTG3)
Set Active power of each GTG GTG3/GTG2 to 7454 KW in HMI
Check Total Spinning reserve = (8380*2)-(14908) which is 16760 - 14908 = 1852 KW
Trip GTG2 /GTG3 any GTG only 1 GTG should trip
Verify if load shed equal 6528 KW as spinning reserve is negative

Total 3 GTG Running

GTG1
Closed
Set 8648 KW of OP limit in HMI for each GTG(GTG1 and GTG2 and GTG3)
Set Active power of each GTG GTG1/GTG2/GTG3 to 6622 KW in HMI
Check Total Spinning reserve = (8648*3)-(19866) which is 25944 - 19866 =6078 KW
Trip anyone GTG
Spinning reserve with losss of one GTG = 17296-19866 = -2570 KW
check the sum of the load shed as per the proiprity is eqaula to or gretaer 2570 kw
Trip anyone GTG from remaining GTG's
Spinning reserve with losss of two GTG = 8648 - 17296 = -8648 KW
check the sum of the load shed as per the proiprity is eqaul to or greater 8648 kw

Bustie scenario
Set turbine capabiltiy to 9342
GTG1
Closed
Set OP lim such that sum of the active power of load under GTG1 is > Oplim -GTG1

set Op lim such that sum of active power of the load under GTG2 is < Oplim(GTG2)
Trip Bustie AC
Check if load tripped under GTG1 as precaculated difference between Active power of
GTG1 and Oplim of GTG1 is negative.

GTG1
Opened

set OP lim such that sum of the active power of load under GTG3 is > Oplim -GTG3

set Op lim such that sum of active power of the load under GTG2 is < Oplim(GTG2)
Trip Bustie BC
Check if load tripped under GTG3 as precaculated difference between Active power of
GTG3 and Oplim of GTG3is negative.

Test Scenario : Underfrequency Load shed


Simulate Frequency such that it falls below the Underfrequency setpoint 1
Check if the loads are shed at the MW setpoint set in HMI for first stage Underfrequency
Verify the timestamp of sample load in the load shedding list to check if load shed executed within XX ms
Record the time difference between GTG trip and Load shed command
Repeat steps 2.1 to 2.4 for Underfrequency setpoint 2
Reset the trip which bring back Generator online
GTG3 BUSTIE AC BUSTIE CB
Closed Closed Open

22.94
21
Spinning Reserve left is 1.852 MW 1.94
9.53

GTG3 BUSTIE CB BUSTIE AC


Closed Closed Opened

Spinning Reserve left is 1.852 MW

GTG3 GTG2 BUSTIE AC BUSTIE CB


Closed Closed Closed Closed

load equally distributed between 2 GTG's before trip


available spinning reserve 6078 kW

load shed will 2570 or more

load shed will 8648 or more

GTG3 GTG2 BUSTIE AC BUSTIE CB


Closed Open Closed Open
Note when Bustie is tripped then Spinning reserve =Total
Active power of GTG1 - OPLIm of GTG1 will be negative Op lim 9 MW Active 10 MW

Note when Bustie is tripped then Spinning reserve =Total


Active power of GTG2 - OPLIm of GTG2 will be zero or >0 Op lim 10 MW Op lim 8MW

Loads connected to GTG1 1 shall be tripped as per the


spinning rerver value in stp2

GTG3 GTG2 BUSTIE AC BUSTIE CB


Closed Closed Opened Closed

Note when Bustie is tripped then Spinning reserve =Total


Active power of GTG3 - OPLIm of GTG3 will be negative Op lim 9 MW Active 10 MW

Note when Bustie is tripped then Spinning reserve =Total


Active power of GTG2 - OPLIm of GTG2 will be zero or >0 Op lim 10 MW Op lim 8MW

Loads on connected to GTG3 shall be tripped as per the


spinning rerver value in stp2

ed executed within XX ms
Step-1

Step-2

Step-3

Step-4

Step-5

Step-6

Step-7

Step-8

Step-9

Step-10

Step-11

Step-12

Step-13

Step-14
Step-15
Step-16
65-GT9154 - Close
Close the knife edge of the Terminal block in the 6501-01 panel 1R03 - 03 and simulate the front Disconnector (BUS - A) close
Disconnector (BUS - B) open status from the respective RTU PLC or LSC PLC and verify the status of the breakers in the SCADA
Active power and spinning reserve value will be simulate from the LSC PLC as per the requirement.

65-GT9155 - Close
Close the knife edge of the Terminal block in the 6501-01 panel 1R03 - 07 and simulate the front Disconnector (BUS - A) close
Disconnector (BUS - B) open status from the respective RTU PLC or LSC PLC and verify the status of the breakers in the SCADA
Active power and spinning reserve value will be simulate from the LSC PLC as per the requirement.

Intertie - 65801Q07_65102A04
65801Q07 - Close the knife edge of the terminal block in the 6501-01 panel 1R05 - 07 and simulate the front Disconnector (BU
Disconnector (BUS - B) open status from the respective RTU PLC or LSC PLC and verify the status of the breakers in the SCADA
65102A07 - Close the knife edge of the terminal block at at 6501-01 panel 1R07 - 03 and simulate the front Disconnector (BUS
Disconnector (BUS - B) open status from the respective RTU PLC or LSC PLC and verify the status of the breakers in the SCADA

Intertie - 65102A06_65241A02
65102A06 - Close the knife edge of the terminal block in the 6501-01 panel 1R08 - 11 and simulate the front Disconnector (BU
Disconnector (BUS - B) open status from the respective RTU PLC or LSC PLC and verify the status of the breakers in the SCADA
65241A02 - Close the knife edge of the terminal block in the 6504-01 panel 1R01 - 03 and simulate the front Disconnector (BU
Disconnector (BUS - B) open status from the respective RTU PLC or LSC PLC and verify the status of the breakers in the SCADA
Load 65241A09,B08,B10
simulate the Close status and active power value for the above Load from the RTU 6504 PLC or LSC PLC and verify the status in
Load 65261A12,A13
simulate the Close status and active power value for the above Load from the RTU 6504 PLC or LSC PLC and verify the status in

Load 61231A08,A09
simulate the Close status and active power value for the above Load from the RTU 6504 PLC or LSC PLC and verify the status i

Verify active power and the shedding sequence in the Shedding list screen. Move the one or two load to the top position of th
required) to check the shedding sequence.
Verify the loads are shed enable and not inhibited by the operator
Reduce the spinning reserve for the island to negative value (e.g. - 2.00) by simulating from the LSC PLC and verify the loads ar
equivalent of the negative spinning value with some time delay.
Shed error will be trigger if the load is not opened within a specified time. And the next available load in the priority will be she
of the remaining negative spinning value
Normalize the spinning reserve for the GTG and reset the Shed error from the load list screen.
Fast Shedding Down:
For GTG trip, Close the knife edge of the terminal block in the LSC 6502-01 panel 1R02-03. And verify the alarm in the SCADA
Verify the loads are shedding down equivalent to the Tripped GTG active power without any delay.
Shed error will be trigger if the load is not opened within a specified time and the next available load in the island start sheddi
Normalize the GTG trip fault and reset all the load alarms