Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````` `````````````````````````````````````

FAT REPORT
SMART
OH-LBS/LINE-SECTIONALIZER
Rated Voltage: __________ KV
Unit SN:
Date of Testing:
Testing for: Mass Production FAT ( ) / Prequalification FAT ( )
Manufacturer:

SEC (Saudi Electricity Company)

Location:

Smart Grid Dept. HQ: TSD HQ :

Signature: Signature:

Scada RTU : Protection Dept. HQ :

Signature: Signature:

Manufacturer:

Name: Name:

Signature: Signature:

1
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

FAT Qualification Test Report Smart OH-LBS/LINE Sectionalizer


PO No. FG No. Date
S.SECT SL
Type Smart OH-LBS/LINE Sectionalizer
No.

No Visual Inspection Status Remarks

1 Ensure NO physical damage/defects in Smart box components


Yes N/A

2 Overall Smart box appearance


Yes N/A

3 Check correctness of name plates, labels of Smart box components


Yes N/A

4 Check proper earthing of Smart box components and door


Yes N/A
Check correctness of Smart box components accommodation as
5
per the drawing Yes N/A

6 Check quality of painting finish


Yes N/A

7 Check type of Router (T, U, H) T U H

1. Insulation Resistance Test


1.1 For Main Circuits:

Applied Voltage: 5000V DC for 1 min. Acceptance Limit: >2GΩ


Testing conditions: All switching devices are Close (LBS and CB) and Earth switch is OFF & Main body is grounded (GND).

Main Circuit
R-GND Y-GND B-GND Accepted
Before HI-POT After HI-POT Before HI-POT After HI-POT Before HI-POT After HI-POT

1.2 For the CPT:

Testing conditions: Secondary wiring OPEN & Main body for the CPT is grounded (GND).

CPT (Power Voltage Transformer)


Primary-GND @ 5.0KV for 1 min. Secondary-GND @ 1.0KV for 1 min. Accepted
Before HI-POT After HI-POT Before HI-POT After HI-POT

2
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

2. Dielectric( HI-POT)Test:

2.1 For the Main Circuit:

Rated Voltage: KV
Applied Voltage: 38 KV for Rated Voltage 17.5 KV
Applied Voltage: 70 KV for Rated Voltage 36 KV
Testing conditions: All switching devices are Close (LBS and CB) and Earth switch is OFF & Main body is grounded (GND).

N
SwitchingDevice ANY BREAKDOWN
No. Tested Phase Other Phases
Status (LBS & CB) ACCEPTED
1 Closed R Y&B short with
GND (body)
2 Closed Y R&B short with
GND (body)
3 Closed B Y&R short with
GND (body)

**Test accepted if NO occurrence of flashovers ore breakdown.

2.2 For the CPT:

Rated Voltage: KV Applied Voltage: KV (Manufacture recommended) Duration: 60 secs.

Applied HI-POT
voltage value ANY BREAKDOWN ACCEPTED

**Test accepted if NO occurrence of flashovers ore breakdown.

3
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

3. Fault Indicator function test (FI)

S.N. Test Name Checked Passed


1 Instantaneous FI set time
2 Permanent FI set time
3 FI Reset

3.1 Inrush Restraint

S.N. Test Name Checked Passed


1 Inrush Restraint Time

3.2 Phase Open

S.N. Test Name Checked Passed


1 Phase Open Voltage

4
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬

AUTOMATION
Product Item: RTU (……………………) Serial No. :

1. Local Electrical Mode

Command: Open/Close Local indication

OH-LBS/Sectionalizer ( Open )

OH-LBS/Sectionalizer ( Close )

2. Digital Output (Remote Command test)

COMMAND (DO)
Local (Laptop) Remote (DCC)
OH-LBS/Sectionalizer ( Open )
OH-LBS/Sectionalizer ( Close )

3. Digital Input TEST

Result
Status Input (DI) (OK-Fail)
Local Indication Remote (DCC)
OH-LBS/Sectionalizer
Open status
Close status
Remote status
Local status
OH-LBS mode status
Line-Sectionalizer mode status
Common (Indication / Alarms)
LOCK/UNLOCK Common
Battery low Alarm
Gas Low ( if the Sectionalizer is SF6) Alarm
AC Power Fail Alarm
Door open Alarm
RTU Self Diagnostic (RTU Alarm) Alarm
DC Power Fail Alarm
Motor/Actuator(Open/Close) Circuit Fail Alarm
Phase loss (miss-phase) Alarm
Over Current (load) Alarm
Unbalance (load) Alarm
Undervoltage Alarm
Fault indication Alarm
Dismatch phases Between Phases: (R-S-T) (U-V-W)
Negative Seq Voltage Protection Alarm

5
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬ HQ. : Smart Grid Dept.
‫ إدارة الشبكات الذكيّة‬: ‫المركز الرئيس‬

4. Analog Measurement TEST

Reading
(AI) Analog input Result
Local Remote DCC SEC(Specs) (OK, fail)
Current A ±3%
Current B ±3%
Current C ±3%
Neutral Current ±3%
Voltage A ±3%
Voltage B ±3%
Voltage C ±3%
Voltage ( N ) ±3%
Voltage ( U-V ) ±3%
Voltage ( V-W ) ±3%
Voltage ( U-W ) ±3%
Voltage ( N ) ±3%
Counter (setting number) 1-2-3

± 3 % is the maximum error for the entire Measurement circuit including


(sensor - data cable - Analog module -RTU etc.…)
The sensor (CT & VT) accuracy is ± 1
The counter setting can be 1, 2 or 3

5. Analog Calculation TEST

CALCULATED ANALOG VALUES

Reading
Measurement Calculated
Remote Result
Local Formula (OK, Fail)
DCC
OH-LBS/Sectionalizer
The following
Active Power (W) is Total of
three phase:
Reactive Power (KVar)
P: Active Power
Q: Reactive Power
Cos(ρ): power factor
Power Factor P=V*I* Cos(ρ)
Cos(ρ)=P/S

6
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬ HQ. : Smart Grid Dept.
‫ إدارة الشبكات الذكيّة‬: ‫المركز الرئيس‬

6. OH-LBS/ Line Sectionalizer Modes

• The sectionalizer counts each over current interruption of the back-up re-closing device and will open
after a preset number of counts have been registered, within a pre -determined time span. The
sectionalizer shall only lockout during the open interval of the re-closing back-up device.

• Total number of counts to opening, adjustable to 1, 2 or 3. Each instantaneous (fast) and delayed
interruption of back-up device will be counted individually.

• Minimum actuating-current settings: phase fault sensing; adjustable form 16 to 640 Amps.

• Earth fault sensing: adjustable from 3.5 to 320 Amps.

• Reset / Memory time: adjustable up to 420 second.

Auto-Recloser Sequence

Current

Load

Time

Line-Sectionalizer Sequence

Count 1 Count 2 Count 3

_ The setting shal be 1-2 or 3


_ The line sectionalizer shall open with the setting value reached and the presence of EFI
_ To count : the three voltages shall be equal zero in the same time ( auto-recloser is open)

7
Classified as Confidential Internal by SEC - )‫الشركة السعودية للكهرباء مصنف مقيد (داخلي‬ HQ. : Smart Grid Dept.
‫ إدارة الشبكات الذكيّة‬: ‫المركز الرئيس‬

Testing Equipment List

Equipment Type S/N Calibration Date Manufacturer Model Number

Insulation Resistance IR Test

Dielectric Test HI-POTon the Main


Circuit
Measurement of the Resistance of
the Main Circuit
CPT Ratio Test

Secondary Injection Testing Kit