KTR WEEKLY ACTIVITY REPORT for PAUT on 3Gi

Reported Weld
DATE DAY TEAM Planned / Exectued Activities Completed NOTES Accept/Reject
Team 1 AM Report template for 18x58mm SSA Validation (Start) 100% 01. No Site Delays today N/A
RA/Kairat PM Report template for 18x58mm SSA Validation 100% N/A
08-Feb Mon
Team 2 AM Scan Before PWHT of 047-2900-LLL-ISO-000-000-00065-03 (P-003) 100% N/A
SB/Timur PM MUT Follow UP scan of Defect 00005-21-FW-04 (D1.1) 100% N/A

Team 1 AM Analysis & Report of 00065-03|CW-M253A-M252A-015-01 (P-003) N/A 01. Delay after Calibrations. Lifting operations & scaffolding barriers blocking area. After negotioting Accept
RA PM Analysis & Report of 00005-21-FW-04 (D1.1) N/A access and hauling equipment up the scaffold team discovered there was no heating. Weather was -9 Reject
09-Feb Tues degC Team 2 Carried on with part of the validation preperation of the 18"x 58mm SSA Project Block.
Team 2 AM Scan After PWHT of 00005-14 FW-01 (C1.5) DELAYED 0% N/A
SKB PM Validation preperation of Sequence 1 SSA Scan Plan 00083 N/A N/A

Team 1 AM Report template for 18x58mm SSA Validation 01. Report Template for SSA 18x58mm template complete until Validation data is available. N/A
100% 62 Pages of report. Analysis and screen shots will be included after Validation.
RA PM Report template for 18x58mm SSA Validation - (Completeed) N/A
10-Feb Wed
Team 2 AM Scan After PWHT of 00005-14 FW-01 TOFD (C1.5) 100% N/A
SKB PM Scan After PWHT of 00005-14 FW-01 PAUT (C1.5) 100% N/A

Team 1 AM Analysis & Report of 00005-14 FW-01 (C1.5) 100% 01. No Site Delays today Accept
RA PM Validation Report Template for LTCS 3"x16mm Validation 100% 02. 3"x 16mm Validation report has been complete until witnessed validation data is collected N/A
11-Feb Thu
Team 2 AM Scan After PWHT of CW-M252B-M253B-901-01 (P-018) TOFD 100% N/A
SKB PM Scan After PWHT of CW-M252B-M253B-901-01 (P-018) PAUT 100% N/A

AM Analysis & Report of CW-M252B-M253B-901-01 (P-018) 100% 01. No Site Delays today Accept
Team 1
02. 12"x 17.4mm Validation report has been complete until witnessed validation data is collected
RA
PM Validation Report Template for LTCS 12"x17.48mm Validation 100% 03. Delay as Scheduled weld not prepared by VLS Construction. AUT Team continued with Validation N/A
12-Feb Fri prepweration
Team 2
AM Delay - No Field weld ready for inspection. 100% N/A

SKB
PM Validation preperation for Single Bevel LTCS 100% N/A

Team 1 AM Validation Report Template for LTCS 8"x18.26mm Validation 100% 01. No Site Delays today N/A
RA PM Validation Report Template for LTCS 8"x18.26mm Validation 100% 02. 12"x 17.4mm Validation report has been complete until witnessed validation data is collected N/A
13-Feb SAT 03. Mark up repair prior to repair works.
Team 2 AM Mark UP Repair/Re-Scan of 00055-02/CW-M253A-M253B-003-01 PAUT (P-058) 100% N/A
SKB PM Mark UP Repair of 00055-02/CW-M253A-M253B-003-01 MUT (P-058) 100% N/A

Team 1 AM Validation Report Template for LTCS 8"x18.26mm Validation Delayed 01. Delay of Validation report template as no Project Qualification Block is on record. N/A
RA PM Mark UP Repair REPORT of 00055-02/CW-M253A-M253B-003-01 PAUT (P-058) 100% N/A
14-Feb SUN 100%
Team 2 AM Scan After PWHT of 047-2900-LLL-ISO-000-000-00065-03 (P-003) Pending
SKB PM Scan After PWHT of 047-2900-LLL-ISO-000-000-00065-03 (P-003) 100% Pending

Additional Requests for 2 teams Permanent Requests


1 Extention of Calibration Workshop 1 Punch Marks as agreed at 200mm from weld center line in 4 cardinal positions

2 Regular Water Deliveries. Coffee Lady is getting Angry at the local guys for taking 2 Monitor running of heater in Calibration workshop.
water
3 3

4
Week 6 Results
Week 6 Completed Welds
Material & Construction Before / After NDT Request Planned Scanning
Day Date Zone Iso No. Weld No. Analysis Result
Size ID. PWHT No. PWHT Completed

1 Monday 08/02/2021 49A F22 16x52 047-2900-LLL-ISO-000-000-00005-21 FW-04 D1.1 Before UT.116 100% Reject

2 Monday 08/02/2021 Module F22 16x52 047-2900-LLL-ISO-000-000-00065-03 CW-M253A-M252A-015-01 P-003 Before UT.117 100% Accept

2 Tuesday 09/02/2021 N/A

3 Wednesday 10/02/2021 Module F22 16x52 047-2900-LLL-ISO-000-000-00005-14 FW-01 C1.5 After UT.115.Post 100% Accept

4 Thursday 11/02/2021 Module F22 18x58 047-2900-LLL-ISO-000-000-00055-03 CW-M252B-M253B-901-01 P-018 After UT.99.Post 100% Accept

5 Friday 12/02/2021 N/A

Repair Marked and


Repair
6 Saturday 13/02/2021 Module F22 18x58 047-2900-LLL-ISO-000-000-00055-02 CW-M253A-M253B-003-01 P-058 UT.91 100% ready for Repair
KTR-FGP-0156
works

7 Sunday 14/02/2021 Module F22 16x52 047-2900-LLL-ISO-000-000-00065-03 CW-M253A-M252A-015-01 P-003 After UT.117.Post Pending
Summary of Welds pending Examination
Active Production Scope Waiting For Inspection (NDT Request Issued) Febuary 2021

Backlog of Validated Inspections


49A LTCS 24 x 31 058-2600-LLL-ISO--000-000-00003-17 (24") CW-R361A-R603A-273-01 After UT.22.Post

58 LTCS 24 x 31 058-2600-LLL-ISO-000-000-00004-20 (24") CW-R601A-R602A-202-01 After UT.66.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-02 (24") CW-R361A-R362A-202-01 After UT.82.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-22 (24") CW-R366A-R251A-202-01 After UT.30.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-07 (24") CW-R362A-R363A-202-01 After UT.006.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-08 (24") CW-R363A-R364A-202-01 After UT.068.Post

49A LTCS 24 x 31 058-2600-LLL-ISO-000-000-00003-13 (24") CW-R364A-R365A-202-01 After UT.023.Post


After Repair &
49A LTCS 12x53 045-2900-LLL-ISO-000-000-00013-26 (12") CW-R363A-R364A-201-01 UT.21.R1.Post
PWHT
Repair Schedule
Repair
13/02/2021 Module F22 18x58 047-2900-LLL-ISO-000-000-00055-02 CW-M253A-M253B-003-01 P-058 UT.91 Marked UP
KTR-FGP-0156
Repair
49A F22 16x52 047-2900-LLL-ISO-000-000-00005-08 FW-03 UT.096.R1
KTR-FGP-0162
Repair
Module F22 20x51.5 047-2900-LLL-ISO-000-000-00093-10 CW-M255A-M256A-003-01 P-020 UT.114.R1
KTR-FGP-0203
Repair
49A F22 16x52 047-2900-LLL-ISO-000-000-00005-21 FW-04 D1.1 UT.116
KTR-FGP-0214

Non Validated Backlog


Area Size& Material Line Joint Number Priority FAB Date
45 LTCS 3"x16mm 045-2900/ 00013-42 CW-R601A-R602A-201-01 1 27/09/2019
45 LTCS 3"x16mm 045-2900/ 00013-44 CW-R602A-R603A-201-01 1 05/10/2019
47A F22 18"x58mm SSA 047-2900 /00055-01 CW-M253A-M253B-003-02 2 27/11/2020
58 LTCS 12"x17.48 058-2200 / 00015-03 CW-R602A-M615A-249-01 3 27/01/2020
58 LTCS 12"x17.48 058-2200/ 00016-01 CW-R602A-M615A-260-01 3 04/02/2020
58 LTCS 8"x12.7 058-2200/ 00017-01 CW-R602A-M615A-262-01 4 18/02/2020
58 LTCS 8x12.7 058-9200 / 00250-01 CW-R602A-M615A-259-01 4 30/01/2020
58 LTCS 8"x18.26 058-2200/ 00018-01 CW-R602A-M615A-263-01 5 05/02/2020