Project Tiltle: PROPOSED DETACHED HOUSE DEVELOPMENT AT 1C MAYFIELD

AVENUE, SINGAPORE

Design: Concrete In-fill Steel CHS


Date: 12/6/2022
CALCULATION SHEET CODE REFERECE:

Input:
Soil Layer A:
Soil Density, γA = 19.3 kN/m³
Soil Thickness, DA = 4.0 m
Void Ratio, e0 = 0.78
Compression Index, Cc = 0.25

Soil Layer B:
Soil Density, γB = 19.5 kN/m³
Soil Thickness, DB = 3.0 m
Void Ratio, e0 = 0.78
Compression Index, Cc = 0.25

Soil Layer C:
Soil Density, γC = 19.5 kN/m³
Soil Thickness, DC = 2.0 m
Void Ratio, e0 = 0.76
Compression Index, Cc = 0.25

Ground Water Level, GWL = 0.0 m (From Ground Level)

Applied Vertical Pressure, σ1 = 110 kN/m²


Vertical Pressure Location = 4.3 m (From Ground Level)
Foundation Length, L = 7 m (Long Side)
Foundation Breath, B = 4.9 m (Short Side)

1
Project Tiltle: PROPOSED DETACHED HOUSE DEVELOPMENT AT 1C MAYFIELD
AVENUE, SINGAPORE

Design: Concrete In-fill Steel CHS


Date: 12/6/2022
CALCULATION SHEET CODE REFERECE:

Stress Vs Depth
0.00
-1.00 0.00 50.00 100.00 150.00 200.00 250.00

-2.00
-3.00
-4.00
Depth, m

-5.00
-6.00
-7.00
-8.00
-9.00
-10.00
Stress, kPa

Total Stress Pore Pressure


Effective Stress Final Effective Stress
Final Total Stress

Total Settlement Vs Final Stress


180.00

160.00

140.00

120.00
Final Stress

100.00

80.00

60.00

40.00

20.00

0.00
-50 0 50 100 150 200 250
Total Settlement, Sc

Final Settlement

Total Consolidated Settlement, Sc = 214 mm


FAIL!

2
Project Tiltle: PROPOSED DETACHED HOUSE DEVELOPMENT AT 1C MAYFIELD
AVENUE, SINGAPORE

Design: Concrete In-fill Steel CHS


Date: 12/6/2022
CALCULATION SHEET CODE REFERECE:

Estimate OCR and Pre-consolidation Pressure.

Sample Depth = 4.5 m


Plasticity Index, Ip = 48 %
Overburden Stress = 86.85 kPa
Measured Su = 92 kPa
Su / σ'v = 1.06
OCR = 3
Pre-Consolidation Pressure, p'c = 260.6 kPa

3
Project Tiltle: PROPOSED DETACHED HOUSE DEVELOPMENT AT 1C MAYFIELD
AVENUE, SINGAPORE

Design: Concrete In-fill Steel CHS


Date: 12/6/2022
CALCULATION SHEET CODE REFERECE: