You are on page 1of 1

CIVIL DAILY REPORT

YESTERDAY DATE: TODAY DATE:

STAFF: (9/11) REMARKS: STAFF: (9/11) REMARKS:

I. DCC MAINTENANCE: I. DCC MAINTENANCE:


● SPOTTER : 1 MANPOWER ● SPOTTER : 1 MANPOWER
● SURVEY CONDO II : 3 MANPOWER ● SURVEY CONDO II : 3 MANPOWER
● MAIN ROAD : 7 MANPOWER ● LAGOON & SWIMMING POOL: 7 MANPOWER

[REMARKS] [REMARKS]

YESTERDAY WORKING DETAILS TODAY EXPECT WORKING DETAILS


WORKING TIME
DCC EQUIP. PREVIOUS TO DATE REMARKS DCC EQUIP. NAME WORKING STANDBY: REPAIR REMARKS
AM PM TOTAL
B/H D140 B/H D140
B/D D8R1 B/D D8R1
B/D D8R2 B/D D8R2
D/T 1 D/T 1
D/T 2 D/T 2
D/T 3 D/T 3
WATER TRUCK
TOTAL

WORKING TIME
DCC WORKERS PREVIOUS TO DATE REMARKS DCC WORKERS LOCATION WORKERS NO. REMARKS
AM PM TOTAL
CEREMONY CEREMONY
MAINTENANCE MAINTENANCE
TRAPULIN TRAPULIN
HOTEL HOTEL
LAGOON LAGOON
5 HECTARES 5 HECTARES
CONDO II CONDO II
MAINOFFICE
TOTAL TOTAL

WORKING TIME
RENTAL TO MIRAE PREVIOUS TO DATE REMARKS RENTAL TO MIRAE LOCATION OPERATOR EQUIP. REPAIR REMARKS
AM PM TOTAL
B/H B/H CEREMONY
VOLVO EW- VOLVO EW-
B/H B/H CEREMONY
145B 145B
P/L P/L CEREMONY
C/P C/P CEREMONY
TOTAL TOTAL CEREMONY

WORKING TIME DIESEL


DCC RENTAL PREVIOUS TO DATE DIESEL TO MIRAE LOCATION PREVIOUS TODAY TOTAL REMARKS
AM PM TOTAL PREV. TODAY TOTAL
BH DX 140 DUMPTRUCK4 CLARK 2
D8R2 BH(CATERPILLAR) CLARK 2
DUMPTRUCK2 DUMPTRUCK1 CLARK 2
DUMPTRUCK1 DUMPTRUCK2 CLARK 2
D8R1 DUMPTRUCK3 CLARK 2
BH(CATERPILLAR2) CLARK 2
BH(CATERPILLAR3) CLARK 2
BH(CATERPILLAR4) CLARK 2
BH(CATERPILLAR5) CLARK 2

MATERIAL LIST
PROCESS ITEM UNIT DESIGN PREVIOUS RECEIVE TOTAL REMARKS PROCESS ITEM UNIT DESIGN PREVIOUS RECEIVE TOTAL REMARKS
Con'c m3 CHB Pcs
Con'c m3 Gravel m3
Wire Mesh m2 Sand m3
CEREMONY ROAD Ceremony board
BaseCourse m3
Rebar Tons
Cement bag

Ms. Charina____
Prepared by:

Mr. Yongho Yu
Confirm by:

You might also like