THE MONT CENIS BASE TUNNEL
The tunnel will be used by freight trains and freight shuttles running at 100
km/h and by high speed passenger trains operating at 220 km/h.
THE MONT CENIS BASE TUNNEL
THE
PROJECT
SAFETY AREA
km 32+315
km 47+998
km 11+600
km 20+859
km 63+805
km 61+203
km 3+704
km 0+000
A B C
INTERCONNECTION
TUNNEL INTERCONNECTION
TUNNEL
THE MONT CENIS BASE TUNNEL
THE
General Features PROJECT
4.24
• Vehicles:
• HS passengers trains
• Regional trains
• Railway highway vehicles
•Modalohr (inter-modal) railway highway
vehicles
• freight trains
5.44
4.80
• Operating speed of 220 km/h
• Axial load 25 tons/axle
• Electric drive system about 2x25 kV
• Signaling and control system is the ERTMS/ETCS
SECURITY FEATURES
• Two single-track tunnels
• Passenger shelter space amounts to 120 m2
• Connection branch every 333 m
THE MONT CENIS BASE TUNNEL
THE
Structure PROJECT
BUS
SUS
MVB FR IT
SMP
PRA
CLA MAD
THE MONT CENIS BASE TUNNEL
The Base Tunnel: THE
PROJECT
Structure
BUS
SUS
MVB FR IT
SMP
PRA
CLA MAD
THE MONT CENIS BASE TUNNEL
THE
Structure PROJECT
5 VENTILATION PLANTS
5 SAFETY SITES
(3 + 2 OUTSIDE)
SJM
BUS
SUS
MVB FR IT
SMP
PRA
CLA MAD
THE MONT CENIS BASE TUNNEL
THE
The state of work PROJECT
Saint-Jean-de-Maurienne
Access adit La Praz
(2480 m)
From 2005 to 2009 Susa-Bussoleno
THE MONT CENIS BASE TUNNEL
THE
Construction Lots PROJECT
SMLP
VBM
SJ Maurienne
Maddalena
LP
Susa
SJ Maurienne
9 8 7 6 5 4 3 2 1
Bussoleno
3,9 2,3 13,9 km 9,7 km 17,7 km 1,1 3,3 9,1 km 2,8 1,9
km
11 10
12
THE MONT CENIS BASE TUNNEL
The construction THE
PROJECT
costs and financing
2016
END OF STUDIES
2017
PRELIMINARY WORKS
2018
MAIN WORKS
= base tunnel
THE MONT CENIS BASE TUNNEL
THE
Planning PROJECT
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
CIVIL WORKS
INSTALLATIONS
OPERATIONAL
TESTING
In December 2015, TELT requested entry into the Global TELT CONCRETE INITIATIVES:
Compact and was admitted as a Public Organisation by
committing to respect: Suppliers selection criteria
• HUMAN RIGHTS
Special control measures
• LABOUR
• ENVIRONMENT ANTI-MAFIA Contracts
• ANTI-CORRUPTION
Regulation
BENCHMARKING:
THE GOTTHARD
NEXT: CALLS FOR TUNNEL
TENDERS
TELT: WHO WE
HISTORY
ARE
EUROPEAN TUNNEL GENERAL OVERVIEW
BENCH
MARKING
History of tunnels in the Alps
20th Century
2 front lines
4,5 years
4 m/d
Loetschberg – 35 km
O
O
Brenner – 55 km
Mont Cenis– 57,5 km
All the main railway tunnels which cross the Alps, as the Mont
Cenis ARE REPLACED NOW BY A MODERN INFRASTRUCTURE,
REALIZED AT A LOWER HEIGHT (Loetschberg, Gothard, Ceneri,
Gothard – 57 km Koralm, Brenner, Semmering).
EUROPEAN TUNNEL GENERAL OVERVIEW
The costs of BENCH
BENCHMARKING:
MARKING
the other base tunnels in Europe
3 FUNDERS:
GOTTHARD BASE TUNNEL
BENCH
Focus BENCHMARKING:
MARKING
GOTTHARD
MONT CENIS
GOTTHARD BASE TUNNEL
Comparison with BENCH
MARKING
Mont Cenis Base Tunnel
GOTTHARD Base tunnel 57 km long MONT CENIS Base tunnel 57,5 km long
ACHIEVEMENTS
• Freight Trains up to 2000 tons • Freight Trains up to 2000 tons with
trains up to 750 meters long
• Passenger Trains up to 250 km/h • Passenger Trains 220 km/h
• More than 200 Trains/ Day • More than 200 Trains/ Day
COSTS
• 903 M€ • 863 M€
METHOD OF EXCAVATION
• 4 TBM and traditional • 7 TBM and traditional
IMPLEMENTATION PERIOD (not including the phase of studies)
From 1999-2016 From 2016-2029
GOTTHARD BASE TUNNEL
Comparison with BENCH
MARKING
Mont Cenis Base Tunnel
GOTTHARD Base tunnel 57 km long MONT CENIS Base tunnel 57,5 km long
• To Accelerate and develop the transport capacity in four of the most important
economic regions in Europe.
• To protect the environment of the Alps by the modal shift from road to rail
DIFFERENT FINANCING SOURCES
Private and Public: Only Public
• The Heavy Goods Vehicle Charge • 40 % Europe
(HGVC, 60 per cent of the funding) • 60% Italy and France (Italy 57,9%
• Mineral oil tax (10 per cent) France 42,1%)
• VAT (30 per cent)