Professional Documents
Culture Documents
standard
construction
drawings
2013 BUIL
REGULATI DING
COMPLIAONNS
T
d1B
aerated PART fill
Version 1.2
March 2014
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
1 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
Welcome to
Sustainable Building Solutions (SBS) is a specialist division of the Travis Perkins Group established in
2010 to provide help, support and expert technical assistance to the construction industry.
SBS offers an integrated approach to providing solutions for your energy efficient building and renewable
energy projects. we provide the products, technical advice, specifications, services and training to enable
you to complete any sustainability project.
• Solutions – we offer New-build and Retrofit energy efficient and compliant solutions, with a fabric
first approach, supported through client and industry research.
• Services & Training – we provide many services to help you deliver your project. For details
please see pages 35 - 37.
• Products – we provide a broad range of products, from Building Fabric to Water Management,
and from Eco Materials to Renewable Energy Technologies.
• Technical Expertise – the SBS team has the support of an Advisory Board which includes BRE
and LABC.
For assistance on Sustainable Building Solutions and the products we offer, please contact :
Email: helpline@tpsbs.co.uk
www.tpsbs.co.uk
Travis Perkins plc is a leading company in the builders merchant and home improvement markets and is
a main supplier to the building and construction market, one of the largest industries in the UK.
The group operates 17 businesses from more than 1,900 sites across the UK, which offer a wide range
of products and services.
2 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
contents
2. Welcome to SBS
5. Our Approach
3
standard construction drawings D1B - aerated PART fill
To help the construction industry reduce these costs we have produced a series of future proof standard
construction details to help housebuilders maximise the contribution of the fabric of a building in SAP.
Each of the construction details uses standard construction techniques and materials, which are
assembled in carefully planned detail to minimise the thermal conductivity.
SBS 33.2
Aerated Block
Availability
The entire series of details is available to purchase in DWG format for £50 (Price includes VAT and valid
until 31st December 2014. Check website for current price).
To purchase
Call 0800 688 8388. Email your interest to helpline@tpsbs.co.uk and we will call back within 48 hours.
4 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
Our approach
The approach we took to create the Standard Construction Details:
• Standard brick and block construction for the first details with a maximum 100mm cavity
• Carefully analysed commercial case for all components, delivering the optimum balance of cost
versus contribution to SAP
• Developed the details and sections in 80 cross sections from foundation to just above the eaves
• With the help of the BRE selected 88 junctions to detail and model to show the biggest gain
against the Accredited values in Appendix R within SAP 2009/2012
• Reduced our thermal bridging for the property and applied these in two test houses: a two-
RWP RWP
Landing
bedroom mid and end terrace of 80m2, and a three-bedroom detached property of 113m2
Master E.E.L
Bedrm 3
Bedroom E.E.L
SD
A/C
• Tested and passed all details within SAP, across all building orientations around the compass,
from North to South
Bedrm 2
E.E.L
Bath rm.
En-suit
All the following psi-values have been calculated by a suitably competent thermal bridging modeller
RWP RWP
using the conventions as set out in “BR 497 - Conventions for calculating linear thermal transmittance
and temperature factors”, and in accordance with “IP1/06 - Assessing the effects of thermal bridging at
junctions and around openings”, by the BRE.
762/ 267
762/ 267
12 21 21
11 11 11
762/ 267
762 /267
762 /267
10 01 01
9 9 9
8 8 8
7 7 7
6 6 6
5 5 5
4 4 4
Bedroom 1 3 3
Bedroom 1 3
Bedroom 1
2 2 2
1 1 1
RWP RWP
Landing
Master E.E.L
Bedrm 3
Bedroom E.E.L
SD
A/C
Bedrm 2
E.E.L
Bath rm.
En-suit
RWP RWP
5
762 /267
762/ 267
762/ 267
standard construction drawings D1B - aerated PART fill
6 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
7
standard construction drawings D1B - aerated PART fill
3.0
OPTION 1 + + +
Standard Flue Gas Heat Recovery Air Permeability Mechanical
Construction Details combi boiler 231875 3.0m³(m²/y) @ 50Pa Ventilation 903712
3.0
OPTION 2 + + +
Standard 89% efficient boiler Air Permeability Water Recovery
Construction Details 289741 3.0m³(m²/y) @ 50Pa Heater 418063
5.0
OPTION 3 + + +
Standard 89% efficient boiler Air Permeability Solar Thermal
Construction Details 289741 5.0m³(m²/y) @ 50Pa 118974
5.0
OPTION 4 + + +
Standard 89% efficient boiler Air Permeability Photovoltaic Panel
Construction Details 289741 5.0m³(m²/y) @ 50Pa 889334
5.0
OPTION 5 + +
Standard Air Permeability Air Source Heat
Construction Details 5.0m³(m²/y) @ 50Pa Pump 132218
+ +
6.0
OPTION 6 +
Standard Air Permeability Valliant Ground Door u-value
Construction Details 6.0m³(m²/y) @ 50Pa Source Heat Pump 1.1W/m²K
8 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
The Standard Construction Details can only be submitted with the new ψ – values if the build is exactly
as shown as using the products specified.
Any deviation makes the figures void, including using products that have a better U-Value.
Notes:
ψ (W/mK) = Linear Thermal Transmittance
Programme used = PHYSIBEL TRISCO 12.0 software as used by the BRE and following the conventions in BR497.
9
standard construction drawings D1B - aerated PART fill
10 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
11
standard construction drawings D1B - aerated PART fill
12 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 33.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
I Beam Intermediate Floor
Timber Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
13
standard construction drawings D1B - aerated PART fill
SBS 34.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
I Beam Intermediate Floor
Timber Eaves Detail
Habitable Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
14 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 35.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
I Beam Intermediate Floor
Brick Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
15
standard construction drawings D1B - aerated PART fill
SBS 37.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
I Beam Intermediate Floor
Gable End
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
16 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 38.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
I Beam Intermediate Floor
Gable Detail
Cold Roof
Party Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
17
standard construction drawings D1B - aerated PART fill
SBS 39.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
Timber Intermediate Floor
Timber Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
18 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 40.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
Timber Intermediate Floor
Timber Eaves Detail
Habitable Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
19
standard construction drawings D1B - aerated PART fill
SBS 41.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
Timber Intermediate Floor
Brick Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
20 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 43.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
Timber Intermediate Floor
Gable End
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
21
standard construction drawings D1B - aerated PART fill
SBS 44.2
Aerated Block
Partial Fill Cavity
Suspended Ground Floor
Timber Intermediate Floor
Gable Detail
Cold Roof
Party Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
22 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 45.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
I Beam Intermediate Floor
Timber Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
23
standard construction drawings D1B - aerated PART fill
SBS 46.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
I Beam Intermediate Floor
Timber Eaves Detail
Habitable Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
24 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 47.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
I Beam Intermediate Floor
Brick Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
25
standard construction drawings D1B - aerated PART fill
SBS 49.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
I Beam Intermediate Floor
Gable End
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
26 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 50.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
I Beam Intermediate Floor
Gable Detail
Cold Roof
Party Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
27
standard construction drawings D1B - aerated PART fill
SBS 51.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
Timber Intermediate Floor
Timber Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
28 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 52.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
Timber Intermediate Floor
Timber Eaves Detail
Habitable Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
29
standard construction drawings D1B - aerated PART fill
SBS 53.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
Timber Intermediate Floor
Brick Eaves Detail
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
30 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
SBS 55.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
Timber Intermediate Floor
Gable End
Cold Roof
External Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
31
standard construction drawings D1B - aerated PART fill
SBS 56.2
Aerated Block
Partial Fill Cavity
Solid Concrete Ground Floor
Timber Intermediate Floor
Gable Detail
Cold Roof
Party Wall
All Details must be read in conjunction with notes on page 33 © Travis Perkins plc 2011
32 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
33
standard construction drawings D1B - aerated PART fill
Air Tightness
These products help to reduce the air leakage throughout a dwelling.
Tapes
Tescon Profil
Tescon Profil is a single sided adhesive tape for junctions at windows, doors and
for corner bonding.
Contega PV
Contega PV is a high quality tape, used for connections to un-plastered masonry
Sealants
Orcon F
The Orcon F joint adhesive is for joining junctions to building components
Internal Membranes
Intello
The Intello is a high performance vapour membrane which provides a degree
of protection from structural damage, even under extreme weather conditions.
External Membranes
Solitex UD
The Solitex UD is an external membrane cover fleece which acts as a roof lining
membrane and provides insulation.
Solitex Plus
The Solitex Plus improves the overall strength of the membrane and guarantees the resistance from nails
or feet, when used as a roof lining membrane or sarking membrane.
34 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
COURSES
Below are some of the training courses we provide:
• Renewables
Solar PV
Heat Pumps
Solar Hot Water
Biomass
Mechanical Ventilation with Heat Recovery
Under-floor Heating
• Build
Electrical & Wiring
Water Regulations
Plumbing
• Water Management
Grey Water Reuse & Rainwater Harvesting
ELC
PROVIDER NO.
2662
35
standard construction drawings D1B - aerated PART fill
SBS SERVICES
BUILDING CONTROL
All New Build projects require certification under
Building Regulations by a BCB/Licensed Inspector
• Building Regulations set standards for design
and construction which apply to many
alterations to existing buildings
• SBS works in partnership with licensed
inspectors to provide complete solutions to
your build
Services detailed below can be ordered individually or expanded to a full consultancy service:
36 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
Services include:
• Sustainable Drainage Design
• Ground Source Heat Pumps Surveying
• Geotechnical & environmental assessment
• Renewable assessment & investigation
• Waste Material management plan
37
standard construction drawings D1B - aerated PART fill
estimating service
more building, less number-crunching
Contact us:
01604 592507
Email:
estimating@travisperkins.co.uk
38 www.tpsbs.co.uk
standard construction drawings D1B - aerated PART fill
39
contact information
Sustainable Helpline:
0800 688 8388
Email:
helpline@tpsbs.co.uk
www.tpsbs.co.uk
Registered Office: Lodge Way House, Lodge Way, Northampton. NN5 7UG
Registered in England 824821
The information contained in this publication is believed to be correct and complete at the time of printing. Due to
limitations in the printing process images may not be representative of their true colours and colour variations may
occur due to the natural origin of the products. Stock may vary from branch to branch and is subject to availability.
All photographs are as a guide only and do not necessarily represent the products available. Travis Perkins plc
reserves the right to change product details without prior notice. Errors & omissions excluded. All products sold
subject to Travis Perkins Terms & Conditions of Sale. Travis Perkins plc is the owner of the registered trademark
Travis Perkins. JB77341.02 01/14