You are on page 1of 6

SOP (Standard

Operating Procedure)

SOP-SDC I-PJT
Piping & Support Installation
- Contents - work

□ WORK FLOW
□ STEP PLAN
□ Safety checklist
□ Emergency contact network

Numb Reason for revision Departing


er
DATE department Drafter

2019.09.12 First enacted Facilities


0 Team

SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)

□ Piping installation work

Process Erection Partners

START
N/A H

Establishment of construction
plan and safety management plan R H

N Before work TBM


O R H

Check the preparationsY before work


e R H
s

SOP Sleeve work


공사현황 W H
판 비치
T/L 운전원 및
Piping work
신호수 배치
R H

화기허가서
Piping Installation
승인여부 확인
W H

용접작업時 화기감시자,
소화기,소화수 배치
Water pressure measurement
W H

Completed piping installation


N W H
O
Y site
Arrange work end and
arrangemente N/A H
s
H : Stop (HOLD POINT) - The corresponding inspection point object directly measures / tests the test.
( Post-process can not start)
W : Witness (WITNESS POINT) - Inspection / test measurement in the presence of applicable
inspection points.
R : Review history (RECORD REVIEW) - The inspection point target is reviewed by inspection / test
report.

SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)

□ SOP - STEP PLAN


Piping Installation
sequence of Photo Risk factor Management measures Risk
the work
 The risk of accident  Simulation through
①TBM demonstration during
during work due to the training and input of
practice, worker '
Check the professional interpreter to
 Risk of accidents due help workers understand ★
preparation to inadequate health
s before  Korean managers check
check and protection worker health status and
work equipment protection area
 ' Both hands and bare
 Wrist twist in insert hands when using rotary
② Sleeve hole drill
work  Check the safety net ★★
 Risk of scrap falling
before work and conduct
during operation
work

 Risk of contact with rotating


 Use high-speed cutter
such as anti-contact
blades during high speed cutter cover
③ Piping ★★
work operation  Check ball tool before
operation, use ground
 Unauthorized use of wire and earth leakage
breaker
power tool electric

 Crash, stenosis risk due


to blind spot generation
when moving equipment
 Falling material on fork  Work by the operator
when moving forklift Ensure safety through
 HOLD POINT daily inspections,
④ Material - Check ground and place induction staff,
handling outrigger foot status set work radius
Carrying - Inspection by wire rope ★★
and loading  Material binding
and dumping ground (binding with banding
or rope) in compliance
disposal standard with loading load
- Confirmation of
suitability of line
hanging condition

 Fire caused by oxygen


welder during welding  Firearm supervisor
work
 Falling in the sleeve resident in firearm work
⑤ Piping  HOLD POINT (Fire extinguisher /
Installatio - Confirmation of firearm Anti-foil) ★★★
n monitor placement  Welder and Hazardous
- Fire extinguisher beach Materials Handler
check  Work for two people in
the amount of material
- Check 30 minutes after
welding

 Organize and arrange the  Arranging


surplus
and removing
materials and
⑥Organized site ★
tools

SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)

배 관 설 치 작 업
Sub-Con Location Task Man Power Working Time

삼호건영 H/5~6

Education of Task Sequence and Safety Hazard

Date : 2019. . Instructor : (sign)

Today’s Critical Control Point

Result
Good : A, Normal : B
Item Check Point Bad : C , Not
Applicable :N/A

AM PM

1. 작업 전 TBM 실시 여부

2. 개인 보호구 착용 상태

3. SOP 및 공사현황판, 승인서, 허가서 배치 여부

4. 위험물 작업 MSDS 비치 상태
General
Safety Issue 5. 공도구 사전 점검 확인 여부

6. 고소작업시 협력업체 관리자 상주

7. 자재보관 구획설정 상태

8. 작업 후 주변 정리정돈 상태

1. Table Lift 를 이용한 고소작업시 하부 신호수 배치 여부

Work 2. BT 비계 고정,수평 확인 및 이동시 작업자 탑승금지 확인

Safety Issue 3. 선행공종 인수인계사항 확인 및 완료 여부


(Hold Point) 4. 불티,비산방지포 및 소화기 비치 확인

5. 화기감시자 배치 확인(용접 후 30 분 이상 잔불 확인)

Daily Hazard
Find &
Remove

Time Check Agent Name Sign


Confirmation
& AM : C&T
Check
PM : C&T

SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)

Emergency Contacts
SUB-CON: SAMHO C&E INDIA

Contact Target Name Contact No.

Medical center 74288-11679


SAMSUNG

C&T
CONTROL ROOM 85270-39774

Main S.B.KIM 74285-48101


SAMSUNG

C&T
Sub U.J.CHOI 84480-59277

Main I.G KIM 98182-09299

SAFETY
Sub PRADIP 95997-30919

Main Kim Kyoung Bum 98184-34517

SUB-CON
Sub B.Ramamoorthy 96263-22255

SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)

냉난방기 설치작업
작업위치
작업내용 투입인원
라인명)

작업절차 및 위험포인트 교육결과

2012 년 월 일 교육강사 :

중점관리 항목

점 검 사 항

작업 전 TBM 실시 여부

개인 보호구 착용 상태

및 공사현황판, 승인서, 허가서 배치 여부

위험물 작업 MSDS 비치 상태

공도구 사전 점검 확인 여부

고소작업시 협력업체 관리자 상주

자재보관 구획설정 상태

작업 후 주변 정리정돈 상태

고소작업시 안전고리 사용철저

화기 작업전 소화기 비치상태, 체결상태 확인

불티비산 방지포 보양후 화기작업

주변 인화성 물질 제거 후 작업

그라인더 사용시 안전 보호구 착용

검측 DATA
점검 시간 점검 주체 점검자 성명

DA-PI-07-02 냉난방기 설치작업

별첨. 기타 육안검사 CHECK 항목


사진 1. 사진

SIEL/SDC-P(N)