Professional Documents
Culture Documents
Operating Procedure)
SOP-SDC I-PJT
Piping & Support Installation
- Contents - work
□ WORK FLOW
□ STEP PLAN
□ Safety checklist
□ Emergency contact network
SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)
START
N/A H
Establishment of construction
plan and safety management plan R H
화기허가서
Piping Installation
승인여부 확인
W H
용접작업時 화기감시자,
소화기,소화수 배치
Water pressure measurement
W H
SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)
SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)
배 관 설 치 작 업
Sub-Con Location Task Man Power Working Time
삼호건영 H/5~6
Result
Good : A, Normal : B
Item Check Point Bad : C , Not
Applicable :N/A
AM PM
1. 작업 전 TBM 실시 여부
2. 개인 보호구 착용 상태
4. 위험물 작업 MSDS 비치 상태
General
Safety Issue 5. 공도구 사전 점검 확인 여부
7. 자재보관 구획설정 상태
8. 작업 후 주변 정리정돈 상태
Daily Hazard
Find &
Remove
SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)
Emergency Contacts
SUB-CON: SAMHO C&E INDIA
C&T
CONTROL ROOM 85270-39774
C&T
Sub U.J.CHOI 84480-59277
SAFETY
Sub PRADIP 95997-30919
SUB-CON
Sub B.Ramamoorthy 96263-22255
SIEL/SDC-P(N)
SOP (Standard
Operating Procedure)
냉난방기 설치작업
작업위치
작업내용 투입인원
라인명)
2012 년 월 일 교육강사 :
중점관리 항목
점 검 사 항
작업 전 TBM 실시 여부
개인 보호구 착용 상태
위험물 작업 MSDS 비치 상태
공도구 사전 점검 확인 여부
자재보관 구획설정 상태
작업 후 주변 정리정돈 상태
주변 인화성 물질 제거 후 작업
검측 DATA
점검 시간 점검 주체 점검자 성명
SIEL/SDC-P(N)