Drafting

number Date Reason for revision drafter


department

Ceiling sound absorption board installation SOP


Ceiling TAX installation

- Contents –
- Table of Contents -

□(WORK FLOW)

□(STEP PLAN)

□(SAFETY CHECK SHEET)

□(TRAING COMPLETION CONFIRMATION)

□비상연락망(EMERGENCY NETWORK)
□천장 TAX 설치 FLOW (Ceiling TAX installationFLOW)
(PROCESS) Client
SUB-CON Construction

(Start work)

TBM 및 SOP
(TBM and SOP training) H H W

(Checking work area and setting up compartments)


H H H

Level
(Check ceiling level) H H H

Setting
(Equipment usedsetting) H W W

NO
(Field and Equipment Inspection) H H W

YES

Insert
(Insert installation) H W W

(Hanger Bolt
installation) H W W

(Reinforcement of each pipe frame)


H W W

T-BAR
(Molding, hangers and T-BAR installation) H W W

(Inspection) NO

YES H H W

Sound-absorbing plate
installation (TAX H W W
installation)

On-site arrangement and


completion of work (Arrange the H W W
site and endwork)
□천장 TAX 설치 STEP-PLAN
Sequence of the work Danger Point Safety management measures Risk
1. Safety inquiry and TMB 1.TBM practice - Whether there is a risk of - Confirmation of preliminary review of work
On-site check 2. On-site risk factor identification scaffolding and subsidence section/material loading section -
and training -Risks that may occur during work TBM, SOP Work plan education through -
Whether

Setting up the working compartment
(collision/straightening/injury, etc.) - Material and personnel movement plan
establishment
2.Insert install 1. Before slab casting 1. Before slab casting 1.Before slab casting
- Insert installation location on -Wound by sharp side after -Work performed by skilled workers
the deck perforating the deck -Check the risk area of falling during the work area
Food - Insert -Falling risk when moving on rebar 2. After slab casting
installation after drilling 2. After slab casting -Thoroughly fasten safety hooks and tie tool tools
2. After slab casting - -Danger of falling and falling due to -Wear safety glasses and dust mask
★★
Anchor after slab perforation work at altitude -Approved before using T/L, BT scaffolding, and cow
Daldae bolt through bolt -Dust is generated when drilling the horse
insertion lower part of the slab Arrangement of number of signals when using -T/L
Make connection possible.
3. Daldae bolt installatio 1. Assembling bolts according to - Danger of falling and falling due to - Tighten safety hooks, tie tool tools together
ceiling level work at high altitude -Approved before using T/L, BT scaffolding, and cow
-Not approved before using T/L, BT horse
scaffolding, and cow horse Arrangement of number of signals when using -T/L
★★
-When using T/L, work after securing more than 60CM
of the over-rising prevention rod

4.Install each pipe frame 1. Install each pipe frame - Fire when cutting angle pipe - 2 fire extinguishers, scattering fire,
according to the ceiling level -Collision with nearby workers when -Arrangement of fire watchers
installing each pipe -Prohibit interference with other workers through prior
-Danger of falling and falling due to notice before working at high places
work at altitude -Thoroughly fasten safety hooks and tie tool tools
★★
-Approved before using T/L, BT scaffolding, and cow
horse
Arrangement of number of signals when using -T/L

5. Molding installation 1. Ink line work on the ceiling - Danger of falling and falling due to - Prevent interference with other workers through
finishing line work at high altitude prior notice prior to work at height
2. Installation of finishing -Thoroughly fasten safety hooks and tie tool tools
materials and curtain boxes on -Approved before using T/L, BT scaffolding, and cow
the ink line horse
★★
Arrangement of number of signals when using -T/L
-When using T/L, work after securing more than 60CM
of the over-rising prevention rod

1.After installing the carrying on - Danger of falling and falling due to - Prevent interference with other workers
the installed hanger, horizontally work at high altitude through prior notice prior to work at height
6. Hanger and
adjust it with a nut. -Thoroughly fasten safety hooks and tie tool
T-bar installation
2. Floating a thread on the tools
construction centerline -Approved before using T/L, BT scaffolding,
Main T-bar installation and cow horse
★★
3. Cross between the main T-BAR Arrangement of number of signals when using
T-bar installation -T/L
-When using T/L, work after securing more
than 60CM of the over-rise prevention bar

1. Panel installation on a fixed T- - Danger of falling and falling due to - Tighten safety hooks, tie tool tools together
7. Ceiling panel bar work at high altitude -Approved before using T/L, BT scaffolding,
installation 2. Mounting in consideration of and cow horse
post process Arrangement of number of signals when using
-T/L
★★
-When using T/L, over-rise prevention bar
60CM
Work after securing abnormality

8.현장 정리정돈 1.폐기물 반출, 정리정돈 - 자재 반출 시 동선 미확보 - 중량물 운반 시 2 인 1 조 운반


□ Ceiling TAX installationSTEP-PLAN

Work order risk point safety management measures Risk


1.Onsite verification 1.TBM Conducted - scaffold trip and subsidence risk - Confirm pre-review of work area / material load section
2. Onsite risk identification and - Possible risks when working - Work plan training through TBM, SOP
TBM conducted
training (crash/collaborate/damage, etc.) - Work compartment settings
- Planning of material and personnel movement plan ★

2.Insert Installation 1.Before Slab Installation 1. Before Slab Installation 1.Before Slavic Assault
- Installation of deck top - Wound by sharp face after deck - Work done by skilled workers
insertLocation penetration - Checking the conductive hazard section during the work
 - Insert the insert after drilling - Conduction risk when moving on area
the hole reinforcing bars 2.After Slavic ostracism
2. After slab installation
- Anchor after slab piercing
2. After slab installation
- Risk of fall or fall caused by a complaint
- Tightening safety hooks and fastening tools
- Wear safety glasses and dustproof masks
★★
  Hanger bolt through bolt - Dust generation at the bottom of the - Approved before using T/L, scaffolding, and work bulletins
insertEnable connection. slab - Place the number of signals when using T/L

3. Hanger Bolt 1.Assemble bolts to ceiling level - Risk of falls and falls due to complaint - Tightening safety hooks and fastening tools
work - Approved before using T/L, scaffolding and work tread
Installation
- Non-approved before using T/L, plate
scaffolding, and work bulletins - Place the number of signals when using T/L
- When using T/L, secure 60CM or more of the over-rise bars
★★
before working.

4. angle pipe frame 1.Install a square pipe frame to fit - Fire when cutting a square pipe - Two fire extinguishers, a fire-flakes scattering, and firewater
the ceiling LEVEL - Conflicts with nearby workers when preparation thoroughly,
installation
installing a square pipe - Arrangement of firearms monitors
- Risk of drop and falls due to complaint - Do not interfere with other workers through advance notice
before working in high places.
work
- Tightening safety hooks and fastening tools ★★
- Approved before using T/L, scaffolding, and working wave
- Place the number of signals when using T/L

5.Mouldinginstallation 1. Work to feed ceiling finish line - Risk of drop and falls due to complaint - Two fire extinguishers, a fire-flakes scattering, and firewater
2.Install finishing materials and work preparation thoroughly,
curtain boxes on drinking lines - Arrangement of firearms monitors
- Do not interfere with other workers through advance notice
before working in high places.
- Tightening safety hooks and fastening tools
★★
- Approved before using T/L, scaffolding, and working wave
- Place the number of signals when using T/L

6.Hanger and 1.Install the carring on the - Risk of drop and falls due to complaint - Two fire extinguishers, a fire-flakes scattering, and firewater
installed hanger and adjust it work preparation thoroughly,
Installing T-BAR
horizontally with the nut. - Arrangement of firearms monitors
2. Install MainT-BAR by floating - Do not interfere with other workers through advance notice
thread on the centerline of
construction
before working in high places.
- Tightening safety hooks and fastening tools
★★
3.Install a Cross T-BAR between - Approved before using T/L, scaffolding, and working wave
main T-BARs - Place the number of signals when using T/L

7.Install PANEL 1.Install a Panel on a Fixed - Risk of drop and falls due to complaint - Tightening safety hooks and fastening tools
T-BAR work - Approved before using T/L, scaffolding, and work bulletins
2.Accounting for future processes - Place the number of signals when using T/L
- 60CM of overrise bars when using T/L
Work After Clearance
★★

8.Site cleanup 1.discharge of waste; clean up - Not secure copper wire when - Carrying heavy goods by two people
transporting materials - Exports material to designated passage and place
- Risk of stenosis when transporting - Completely set up compartment for waste outside material
heavy goods