EESB INTERNAL

TRAINING
TYPE OF CRANE
Mobile crane
Crawler crane
Tower crane
Roug terrain crane
ACCIDENT RELATED TO CRANE

- OVER REACH - LIFTING EQUIPMENT FAIL


- FOUNDATION FAIL - SWING OUTSIDE AREA

- OVERHEAD POWER SOURCE


- POOR EVALUATION CONTROL
- THE LINE OF FIRE - THE LINE OF FIRE
- SUSPENDED LOAD - INSIDE BARRICADE AREA
RESPONSIBILITY OF PIC

• To inspect crane on site based :


- Legal documentations
- Lifting equipments
- Load equipments
- Barricade and signage
- S.O.P
DOCUMENTS RELATED TO CRANE DURING INSPECTION
* PMA – PERAKUAN * CRANE OPERATOR * ONSITE CRANE
MESIN ANGKAT CERTIFICATE - LOAD CHART
DOCUMENTS RELATED TO CRANE DURING INSPECTION
* MEINHARDT CHECKLIST * LIFTING GEAR CERTIFICATE:
FOR : - SLING
* LIFTING PLAN Lifting & hoisting work - WIRE ROPE
CRANE COMPONENT
CARRIER
• 1.1 2-axle under carriage
• 1.2 Wheel
• 1.3 Diesel engine
• 1.4 Crane travelling cabin
• 1.5 Outrigger beam
• 1.6 Outrigger plate

• SUPERSTRUCTURE
• 2.1 Control system
• 2.2 Crane operating cabin
• 2.3 Counterweight
• 2.4 Luffing cylinder
• 2.5 Hoist

• 3 Boom
• 4 Main block
SUPERSTRUCTURE

Safety Latch
- Spring must
dfunctional
- SWL stamp

Anti-two Block System


- Act as stopper
- Prevent from load hit boom

Wire Drum
Main Block - No bird cage
- SWL stamp - Grease Boom Angle
- In place
CARRIER Functional load
indicator
- Auto cut off

Crane outrigger Foundation (base plate) Light indicator


- Must fully extent (Maximum) - Metal plate - Green functional
- Hangging (no load on tyre) - Close wooden block -Orange (by pass)
LIFTING EQUIPMENT
WIRE ROPE
SHACKLES &
SLING BELT
Normal wear

Absive wear

Mechanical
damaged
Rotational
damaged

Heat damaged

Bending fatique
GUIDELINES
Barricade & signage

Signalman
CANOPY FORECOURT
C-STORE Traffic flow

Metal hoarding

TANK PIT
PARKING AREA

UNDERGROUND
CANOPY FORECOURT TANK 2
UNDERGROUND
TANK 1
LIFTING ACTIVITIES

Lifting Signage Lifting Steel Rebar Lifting Canopy Roof

Lifting Cabin Lifting Roof Structure Lifting Sheet Pile


EVALUATION ON SITE
WORK CONDITION
LAST MINUTE RISK
ASSESSMENT - LMRA
EVALUATION
Imagine the work step before start work progress :
Observe :
Location of MOBILE CRANE.
 Shape of lifting load.
Examples : Locate above tank sump.
 Lifting load point need.
Action taken : Wet & place fire blanket on tank sump
 Potential of load slip.
Location of LORRY TANK.  Potential of equipment
Observe nearest obstacle affected zone 1 (in swing fail.
area).  Impact radius if fail.
Examples : Slinging wire rope near vent pipe (<2M)  Overhead & ground
obstacles.
- hot work
 Disturbance
Action taken : Wet the area & equipment. standby fire
communications.
watcher.
LIFTING WORK

To complete documentation To brief lifting hazard (TBT) To conduct crane inspection


- WCF/JHA/PTW - Signalman in place (traffic) - Based on MHT checklist guidelines
- Lifting plan/Machinery inspection checklist - 12LSR violation (suspended load) - Along with crane operator
- PMA/Load chart/Cert operator -Swing area (intervene) -Advice operator on SHELL requirements To barricade the crane & swing area
- Prefer hard barricade along swing area in
case of drop load.
-Place lifting signage to others public

To coordinate signalman
To secure load at designated place - To locate at wide visual position To secure load before remove the cushion
To control load -Enough to warn others party (public)
- Continuous communication - Tie on hook first before removed cushion
- Continuous communication
- Barricade & signage - To avoid load slip
- One person at every tag line
- To place tag line
Q & A SESSION

THANK YOU !!!