Professional Documents
Culture Documents
BACHELOR OF TECHNOLOGY
in
ELECTRONICS & COMMUNICATION ENGINEERING
Submitted by
Autonomous
DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
CERTIFICATE
This is to certify that the Main Project entitled “Portable Mobile Charger ” is a bonafide
work carried out by K. krishna Kanth (19H71A0415), in partial fulfillment for the award of degree of
(Dr. K. S. RAO)
Principal
ACKNOWLEDGEMENT
We would like to take this opportunity to express my deep gratitude to the members who assisted
us directly and indirectly for the completion of this project work.
We would like to thank Mr. B.R.K.SINGH, Associate Professor, the project supervisor for his
esteemed guidance and support, especially the valuable ideas and thoughts provided during this project work.
He is expertise in the area of Embedded Systems, this makes us very useful in solving the problems
encountered during the project work.
We would like to express my immense pleasure in expressing immeasurable sense of gratitude to,
Ch. PULLA RAO Head of the Department in Electronics and Communication Engineering for his
valuable suggestions in the completion of the project.
We wholeheartedly acknowledge Dr. K. S. RAO, Principal, and Prof. D. PANDURANGA RAO,
CEO for giving an opportunity to make this project a successful one.
We also extend my thanks to all the faculty members of the Electronics and Communication
Engineering Department for their valuable contributions in this project.
We would like to extend our warm appreciation to all my friends for sharing their knowledge and
valuable contributions in this project.
Finally we express our deep sense of gratitude to our parents for their continuous support throughout
my academic career and their encouragement in completion of this project work successfully.
Regards
In the report we are going to introduce you with unique type of cell phone charger which is Portable/Emergency Mobile Charger. Why going for a
costly power bank to charge Mobile Phone? Just use a 9v battery and a few components to make a Portable Mobile Charger. The Mobile phone battery
is high efficient long lasting Lithium ion battery that has thousands of charge/discharge cycles.
Equipments :
IC 7805
LED
9 Volt Battery
Battery Cap
PCB
Connecting Wires
.
Description of Mini Project
Cell phone have become a necessity for many people throughout the world. The ability to keep in touch with family, business associates, and access to
email are only a few of the reasons for the increasing importance of cell phones. Today's technically advanced cell phones are capable of not only receiv -
ing and placing phone calls, but storing data, even can be used for taking pictures.
These has only power source is rechargeable batteries. Today's smart phone can with stood maximum one day of charging.
When we are on log rout or out of station we couldn't find any proper way for charging cell phone we need power backup to operate our devices. So that
need lead us to make such a circuit that store charge and at the time of need we can utilizes that for charging our devices.
1. IC 7805
IC 7805 in used to regulate voltage.
IC 7805 is a 5v voltage regulator that restricts
the voltage output to 5v and draw 5v
regulated power supply .
It comes with provision to add heartsick .
The maximum value of voltage regulator 35v.
Itregulate a study output 5v if the input
voltage is in range of 7 v to 35v.
2.USB female pin:
3. Resistor.
5. BATTAERY.
6. Battery Cap:
Circuit Diagram :
Advantages:
Use it when no electricity is available . This is the one
of the most important advantage of portable mobile
charger.
That when you don't have electricity at your place or
any where at that time we can also charge our electronic
device through portable USB charger.
It is easily connect to a USB port.
Disadvantages:
Battery gets drained Some people have the tendency
to charge their phones even if the don't need charging.
Using the phone while it is attached to the charger is
difficult.
Application:
It is a Simple circuit .
It can also prevent from corrosion.
Results:
The testing results of this project by implementing the circuit diagram shown in fig -1 is discussed below: