Tanggal : 02 September 2016
Tempat : Batching Plant Triyagan Harmet Perkasa
antara
PT dengan PT. Triyagan Harmet Perkasa
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
(W.Budianto)
Kepala Plant
CONCRETE MIX DESIGN COMPUTATION
6,0 SUMMARY
Grade Slump W/C Cement Fly Ash Sand C.Agg
( cm ) Merapi 20 Mm :
40 Mm :
K.250 NFA 10±2 Cm 0.582192 292 0 973.5217 Kg/m³ =
PUTATION
K.250 NFA
10±2 Cm
Ref :
,19 Desember 2020
Kg/cm2
Portland Cement - Gresik
Kg/m3 = 0.092698 m3
Kg/m3 = 0 m3
Kg/m3 = 0.17 m3
Kg/m4 = 0.02 m3
Vol.total Agg = 0.717302 m3
Kg/m3 = 0.973522 m3
Kg/m3 = 0 m3
Kg/m3 = 0.929623 m3
Kg/m3 = 557.7737 m3
Kg/m3 = 371.8491 m3
Lt/m3 = m3
Lt/m3 = m3
Lt/m3 = m3
Kg/M3 M3
IR.Hardiansyah
Manager Area
SC - JO MES - TSW JO PT. INDOMIX PERKASA
KODE :
MIX PROPOTION DATA SHEET
DATE :
Project Name :
PROJECT : DATE
LOCATION : S/A 0.47
GRADE : K.300 Kg/cm2 W/C 0.46961326
SLUMP AWAL : 10 ± 2 cm SUHU
SLUMP LOSS : cm BATCH 0.095 Liter
SLUMP LOSS
AFTER ( minutes ) 30' 60' 90' 120'
SLUMP ( cm )
CODE DATE OF AGE WEIGHT LOAD STRENGTH
REMARKS
B.UJI TESTING ( Days ) ( Kg ) ( Ton ) Kg/cm3 Est 28
Trial Mix MC %
Pasir =
Split 1-2 =
Split 2-3 =
Workability :
( ) ( ) ( M.IQBAL.A.W )
SC - JO MES - TSW JO PT.KODE
INDOMIX PERKASA
:
MIX PROPOTION DATA SHEET
DATE : 24 Januari 2020
Project Name :
MC %
Pasir =
Split =
Workability :
( ) ( ) ( )