You are on page 1of 2

GEOTECH SERVICES Page 1 of 2

Soil & Materials Testing Laboratory TC No. GSL2018-1902463


X-18, MIDC, Hingna Industrial Estate, Nagpur 440016 Report No. CO-25022019-2
07104 – 232671, 234512, 236571, 236576 Date 13.02.2019
Mail: info@geotechservices.in, www.geotechservices.in reports@geotechservices.in
I N TE RI M RE PO R T

CUSTOMER SSE/W/C/TMR Nagpur. ADDRESS Nagpur.


XEN/C/G/BTL-DKS/QC/MIX
LETTER REF. AGENCY Rakesh Kumar Jain-MH
DESIGN-02 Dt -02.02.2019
Execution of work for design of bridge
and buildings, earth work in formation,
construction of Major and minor
bridges service buildings supply of
machine crushed stone ballast,
transportation of railway materials, P- Birla A1 OPC 43 grade
MATERIAL
PROJECT way work general electrical works for cement, 20mm,10mm CA
IDENTIFICATION
buildings and stations and other allied ,and Natural Sand.
works between Darekasa station to
Bortalao stations in connection with
third BG railway line between
Rajnandgaon- Kalumna Station of
Nagpur of SEC Railway.
DATE OF RECEIPT 25.02.2019 SAMPLED BY Customer / Agency
SAMPLE
TEST
CONDITION WHEN Sealed Mix Design M30
PERFORMED
RECEIVED
METHOD OF
DATE OF TEST From 25.02.2019 onwards IS:10262-2009
TEST

The trials for the mix for concrete grade M30 is undertaken and 28 days results are
awaited. Based on early age strength, for site trials, following mixes are suggested.
Detailed report follows

Properties For M30


Mix Proportion (By Weight) 1 : 1.69 :2.76
Water Cement Ratio 0.38
Cement Content 440 kg / cu.m
Natural Sand Content 743 kg / cu.m
Coarse Aggregates 20 mm 910 Kg / cu.m
Coarse Aggregates 10 mm 303 Kg / cu.m
Water Content (W.rt.WC Ratio) 167.2 Lit / cu.m
Water Absorption of CA @ 0.4 % 4.8 Lit / cu.m

Water Absorption of FA @ 1.2 % 8.9 Lit / cu.m


Total Water Content 180.9 Lit / cu.m
7 days strength 30.4 Mpa
Note: The cement content recommended is based on early age strength. After confirmation of 28 days
strength, cement content may reduce.
Page 2 of 2
TC No. GSL2018-1902463
Report No. CO-25022019-2
Date 13.02.2019

 The above water content is recommended considering dry aggregates; as such


correction for absorption is made. In order to maintain workability, proportionate
adjustment as above (water absorption), in the quantity of water shall be made, if
the aggregates are wet.

 The grading of the aggregates shall be checked regularly & should match the
grading of aggregate received in the laboratory as this may have an effect on the
strength & other characteristic of the concrete. If required necessary
adjustments/corrections in the proportion of fine aggregate shall be done.

For GEOTECH SERVICES,

Pooja Sharma
Sr.Manager

 The above results are related only to the sample tested in this laboratory.
 No report shall be reproduced, except in full, without written approval of this laboratory.