This document provides a bill of quantities (BOQ) for construction of a retaining wall for a property called Mustang. It includes 8 items with descriptions, units, rates, quantities, and costs for earthwork excavation, filling, concrete work, stone masonry, gravel packing, piping, and stone pointing. The total cost for the retaining wall project is estimated at 7,952,650.51 Indian rupees.
This document provides a bill of quantities (BOQ) for construction of a retaining wall for a property called Mustang. It includes 8 items with descriptions, units, rates, quantities, and costs for earthwork excavation, filling, concrete work, stone masonry, gravel packing, piping, and stone pointing. The total cost for the retaining wall project is estimated at 7,952,650.51 Indian rupees.
This document provides a bill of quantities (BOQ) for construction of a retaining wall for a property called Mustang. It includes 8 items with descriptions, units, rates, quantities, and costs for earthwork excavation, filling, concrete work, stone masonry, gravel packing, piping, and stone pointing. The total cost for the retaining wall project is estimated at 7,952,650.51 Indian rupees.
S.N. Description of works Unit Rate Quantity Amount Remarks
Site Clearance including cutting Shrubs 2 1 m 25.13 226.00 5,679.38 removing trees etc all complete Earthwork excavation in foundation in soft and 2 hard soils including disposal upto 10m lead and m3 900.22 389.36 350,509.66 1.5m lift
Providing and filling earth material laying in 15
3 cm layer, spray water with compaction all m3 548.26 129.79 71,158.67 complete as per instruction of the site incharge
75mm thick PCC work in 1:3:6 including lead
4 m3 16,310.91 7.99 130,324.17 upto 30m Stone Masonry work in 1:6 C/S mortar all 5 m3 13,161.84 415.17 5,464,401.11 complete Gravel Packing Works including breaking, 6 carying and laying of gravel/stone inorder to m3 7,196.21 204.46 1,471,337.10 prevent seepage of soil 100 mm Dia. High Density Pipes covered by 7 Rm 136.73 297.90 40,731.87 Geotextile 20mm Thick Stone pointing work with 1:2 C/S 8 m2 439.76 510.60 224,541.46 all complete Subtotal 7,758,683.42 2.5% 193,967.09 Contigency Grand Total 7,952,650.51