LATE TASKS

Tasks that are late as compared to the status date. A task is late if its finish date has passed or it is not progressing as planned.

Name Start Finish % Complete Remaining Work Resource Names

Installation of Fan Coil Unit Thu 11/17/22 Mon 50% 8 hrs Mr. Babar (Assistant
Accessories 12/26/22 Electrical
Engineer),hand
tool,Mr.Mehmood(h
elper),Mr
Ahmad(helper),MR
Misbah(electrician)

Installation and Testing of Tue 7/4/23 Tue 7/11/23 90% 28.8 hrs Mr Rashid(pipe
Fiber Glass Insulated Hood fabricator),Mr
Status: Complete Status: Late for Kitchen Tahir(pipe fitter),Mr
Taqi(pipe
Status: Future Task fabricator),MR
Zafar(pipe
fabricator),Mr.Ibrahi
m(helper),Mr.Mehm
ood(helper)

Installation and Testing of Wed 7/12/23 Tue 7/25/23 85% 84 hrs alnor digital velocity
Air Curtains meter-high & low
static velocity
measring set,Mr
Tahir(pipe fitter),Mr
Taqi(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr.Ibrahi
m(helper),Mr.ishfaq
(pipe
fitter),Mr.Mehmood
(helper)

Placement of Ventilation Wed 7/26/23 Thu 8/3/23 73% 38.88 hrs Mr.Imran(electrician
Fans ),Mr.Mehmood(help
er),Mr
Ahmad(helper)

Installation of Ventilation Fri 8/4/23 Thu 8/10/23 90% 24 hrs MR


Fans Misbah(electrician),
Mr.Mehmood(helpe
r),Mr
Ahmad(helper),Mr.a
khtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.ishfa
q(pipe fitter)

Testing of Ventilation Fans Fri 8/11/23 Wed 8/16/23 70% 7.2 hrs Mr.ashraf(HVAC
engineer)

Installation of Aluminium Thu 8/17/23 Fri 8/25/23 85% 58.8 hrs Mr.Imran(electrician
Fabricated Powder Coated ),Mr.Rana(helper),M
Drills r.Ibrahim(helper),M
r.akhtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.Wase
em(pipe
fitter),Mr.Waqar(pip
e fitter)

Installation of Supply Air Mon 8/28/23 Wed 8/30/23 50% 96 hrs MR


and Return Air Diffuser Misbah(electrician),
Mr.Mehmood(helpe
r),Mr.Rana(helper),
Mr Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(pip
e fitter),Mr.
Sikander (Welder)

Installation of Volume Thu 8/31/23 Wed 9/13/23 45% 268 hrs MR


Control Damper Sheet Misbah(electrician),
Mr.Mehmood(helpe
r),Mr
Ahmad(helper),MR
Zafar(pipe
fabricator),Mr.akhta
r(pipe
fabricator),Mr.ishfa
q(pipe
fitter),Mr.Waseem(
pipe fitter),Sheet
Cutter,Mr. Sikander
(Welder)

Installation of Motorized Wed 8/30/23 Mon 9/11/23 40% 115.2 hrs Mr


Damper Sheet Ahmad(helper),Mr.R
ana(helper),Mr.akht
ar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr.ishfa
q(pipe
fitter),Mr.Waseem(
pipe fitter),Mr
Azhar(plumber),Mr.
Sikander (Welder)

Installation of Fire Damper Tue 9/12/23 Tue 10/10/23 25% 960 hrs MR
with linkage and Fuse Misbah(electrician),
Mr.Mehmood(helpe
r),Mr
Ahmad(helper),Mr.a
khtar(pipe
fabricator),Mr
Taqi(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(pip
e fitter),Mr.
Sikander (Welder)

Installation of Back Draft Mon 9/11/23 Mon 9/25/23 0% 480 hrs Mr.Bilal(labor),Mr
Damper Sheet Ahmar(labor),Sheet
Cutter,Mr. Sikander
(Welder),Gas
Welding Set,Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe fitter)

Painting and Identification Tue 9/26/23 Tue 11/14/23 0% 960 hrs Mr.Mehmood(helpe
Work on Chilled Water r),Mr
Pipes and Exhaust Duct Ahmad(helper),Mr.
Ishaq( Painter),Mr
Rashid(pipe
fabricator),MR
Zafar(pipe
fabricator),Mr
Tahir(pipe
fitter),Mr.ishfaq(pip
e fitter),pipe vice
set,pipe wrench sets
,Mr
Nabeel(plumber),Mr
. Sikander (Welder)

Testing of Water Side of Wed 9/27/23 Tue 10/31/23 0% 600 hrs Mr.Mehmood(helpe
the System r),Mr.Mohsin(QA &
QC),Mr.akhtar(pipe
fabricator),Mr.ishfa
q(pipe fitter),Mr
Azhar(plumber)

Testing of Air Side of the Wed 9/27/23 Tue 10/17/23 0% 360 hrs Mr.Sajid(HVAC
System Technician),hood
alnor velocity
meter,Mr.ashraf(HV
AC engineer)