Status for all top-level tasks. To see the status for subtasks, click on the chart and update the
outline level in the Field List.
100%
SAT 1/1/22 - MON 9/22/25 90%
80%
% COMPLETE
70%
40%
60%
50%
40%
40%
30%
20%
MILESTONES DUE 10%
Milestones that are coming soon.
0%
Name Finish Project Duration
Installation and Wed 7/12/23 Tue 7/25/23 10 days 85% alnor digi
Testing of Air velocity
Curtains meter-hig
low static
velocity
measring
set,Mr
Tahir(pipe
fitter),Mr
Taqi(pipe
fabricator
Zafar(pipe
fabricator
Ibrahim(h
),Mr.ishfa
e
fitter),Mr
mood(hel
ar
t
l
),han
Mehm
er),M
helper
electri
ipe
r),Mr
e
r
e
r),MR
e
r),Mr.
helper
hmoo
)
ital
gh &
c
e
r
e
r),MR
e
r),Mr.
helper
aq(pip
r.Meh
elper)
n(elec
Mr.Me
helper
helper
electri
Meh
elper),
helper
tar(pi
r),Mr
e
r),Mr.
pe
f(HVA
er)
n(elec
Mr.Ra
r),Mr.
helper
tar(pi
r),Mr
e
r),Mr.
(pipe
r.Waq
tter)
electri
Meh
elper),
(helpe
ipe
r),MR
e
r),Mr
e
r.ishfa
r.
electri
Meh
elper),
helper
e
r),Mr.
pe
r),Mr.
pe
r.Was
e
eet
r.
helper
a(hel
akhtar
r),Mr
e
r),Mr.
pe
r.Was
e
r
umber
ander
electri
Meh
elper),
helper
tar(pi
r),Mr
e
r),Mr
e
r.ishfa
r.
labor)
abor),
r.
,Gas
ipe
r),MR
e
r),Mr
e
mood(
Mr
helper
aq(
Mr
ipe
r),MR
e
r),Mr
e
r.ishfa
pe
pipe
ets
plumb
mood(
Mr.Mo
&
akhtar
r),Mr.
pe
r
umber
(HVAC
an),ho
r.ashr