PROJECT OVERVIEW % COMPLETE

Status for all top-level tasks. To see the status for subtasks, click on the chart and update the
outline level in the Field List.

100%
SAT 1/1/22 - MON 9/22/25 90%
80%
% COMPLETE
70%

40%
60%
50%
40%
40%
30%
20%
MILESTONES DUE 10%
Milestones that are coming soon.
0%
Name Finish Project Duration

<HVAC Completion Party> Tue 11/14/23


LATE TASKS
<Completion of Plumbing Fixtures> Wed 5/22/24 Tasks that are past due.
<Completion of Water Supply system in all Wed 9/4/24
Name Start Finish Duration % Complete Resource
Aspects>
Names
<Completion of Drainage System> Wed 11/20/24
Installation of Fan Thu 11/17/22 Mon 12/26/22 2 days 50% Mr. Babar
<Completion of Sewer and Manholes> Mon 1/27/25 Coil Unit Accessories (Assistant
Electrical
<Celebration of successful completion of Wed 2/19/25 Engineer)
Plumbing works> d
tool,Mr.M
Testing of Fire Hydrant System Thu 5/29/25
ood(helpe
<Grand Celebration of Project Completion> Mon 9/22/25 r
Ahmad(h
),MR
Misbah(e
cian)

Installation and Tue 7/4/23 Tue 7/11/23 6 days 90% Mr


Testing of Fiber Rashid(pi
Glass Insulated Hood fabricator
for Kitchen Tahir(pipe
fitter),Mr
Taqi(pipe
fabricator
Zafar(pipe
fabricator
Ibrahim(h
),Mr.Meh
d(helper)

Installation and Wed 7/12/23 Tue 7/25/23 10 days 85% alnor digi
Testing of Air velocity
Curtains meter-hig
low static
velocity
measring
set,Mr
Tahir(pipe
fitter),Mr
Taqi(pipe
fabricator
Zafar(pipe
fabricator
Ibrahim(h
),Mr.ishfa
e
fitter),Mr
mood(hel

Placement of Wed 7/26/23 Thu 8/3/23 6 days 73% Mr.Imran


Ventilation Fans trician),M
hmood(h
),Mr
Ahmad(h
)

Installation of Fri 8/4/23 Thu 8/10/23 5 days 90% MR


Ventilation Fans Misbah(e
cian),Mr.M
mood(hel
Mr
Ahmad(h
),Mr.akht
pe
fabricator
Taqi(pipe
fabricator
ishfaq(pip
fitter)

Testing of Fri 8/11/23 Wed 8/16/23 3 days 70% Mr.ashraf


Ventilation Fans C enginee

Installation of Thu 8/17/23 Fri 8/25/23 7 days 85% Mr.Imran


Aluminium trician),M
Fabricated Powder na(helper
Coated Drills Ibrahim(h
),Mr.akht
pe
fabricator
Taqi(pipe
fabricator
Waseem(
fitter),Mr
ar(pipe fit

Installation of Supply Mon 8/28/23 Wed 8/30/23 3 days 50% MR


Air and Return Air Misbah(e
Diffuser cian),Mr.M
mood(hel
Mr.Rana(
r),Mr
Rashid(pi
fabricator
Zafar(pipe
fabricator
Tahir(pipe
fitter),Mr
q(pipe
fitter),Mr
Sikander
(Welder)

Installation of Thu 8/31/23 Wed 9/13/23 10 days 45% MR


Volume Control Misbah(e
Damper Sheet cian),Mr.M
mood(hel
Mr
Ahmad(h
),MR
Zafar(pipe
fabricator
akhtar(pip
fabricator
ishfaq(pip
fitter),Mr
eem(pipe
fitter),She
Cutter,Mr
Sikander
(Welder)

Installation of Wed 8/30/23 Mon 9/11/23 8 days 40% Mr


Motorized Damper Ahmad(h
Sheet ),Mr.Rana
per),Mr.a
(pipe
fabricator
Taqi(pipe
fabricator
ishfaq(pip
fitter),Mr
eem(pipe
fitter),Mr
Azhar(plu
),Mr. Sika
(Welder)
Installation of Fire Tue 9/12/23 Tue 10/10/23 20 days 25% MR
Damper with linkage Misbah(e
and Fuse cian),Mr.M
mood(hel
Mr
Ahmad(h
),Mr.akht
pe
fabricator
Taqi(pipe
fabricator
Tahir(pipe
fitter),Mr
q(pipe
fitter),Mr
Sikander
(Welder)

Installation of Back Mon 9/11/23 Mon 9/25/23 10 days 0% Mr.Bilal(la


Draft Damper Sheet ,Mr
Ahmar(la
Sheet
Cutter,Mr
Sikander
(Welder),
Welding
Set,Mr
Rashid(pi
fabricator
Zafar(pipe
fabricator
Tahir(pipe
fitter)

Painting and Tue 9/26/23 Tue 11/14/23 25 days 0% Mr.Mehm


Identification Work helper),M
on Chilled Water Ahmad(h
Pipes and Exhaust ),Mr. Isha
Duct Painter),M
Rashid(pi
fabricator
Zafar(pipe
fabricator
Tahir(pipe
fitter),Mr
q(pipe
fitter),pip
vice set,p
wrench se
,Mr
Nabeel(pl
er),Mr.
Sikander
(Welder)
Testing of Water Wed 9/27/23 Tue 10/31/23 25 days 0% Mr.Mehm
Side of the System helper),M
hsin(QA &
QC),Mr.ak
(pipe
fabricator
ishfaq(pip
fitter),Mr
Azhar(plu
)

Testing of Air Side of Wed 9/27/23 Tue 10/17/23 15 days 0% Mr.Sajid(H


the System Technicia
od alnor
velocity
meter,Mr
af(HVAC
engineer)
e

ar
t
l
),han

Mehm
er),M

helper

electri

ipe
r),Mr
e
r
e
r),MR
e
r),Mr.
helper
hmoo
)

ital

gh &
c

e
r
e
r),MR
e
r),Mr.
helper
aq(pip

r.Meh
elper)

n(elec
Mr.Me
helper

helper

electri
Meh
elper),

helper
tar(pi

r),Mr
e
r),Mr.
pe

f(HVA
er)

n(elec
Mr.Ra
r),Mr.
helper
tar(pi

r),Mr
e
r),Mr.
(pipe
r.Waq
tter)

electri
Meh
elper),
(helpe

ipe
r),MR
e
r),Mr
e
r.ishfa

r.

electri
Meh
elper),

helper

e
r),Mr.
pe
r),Mr.
pe
r.Was
e
eet
r.

helper
a(hel
akhtar

r),Mr
e
r),Mr.
pe
r.Was
e
r
umber
ander
electri
Meh
elper),

helper
tar(pi

r),Mr
e
r),Mr
e
r.ishfa

r.

labor)

abor),

r.

,Gas

ipe
r),MR
e
r),Mr
e

mood(
Mr
helper
aq(
Mr
ipe
r),MR
e
r),Mr
e
r.ishfa

pe
pipe
ets

plumb
mood(
Mr.Mo
&
akhtar

r),Mr.
pe
r
umber

(HVAC
an),ho

r.ashr