DOSEN:
Dr. Ir. BUDI WITJAKSANA, S.T., M.T., IPU., ASEAN ENG
100%
TUE 10/03/20 - SAT 12/12/20 90%
80%
% COMPLETE
70%
0%
60%
50%
40%
30%
20%
MILESTONES DUE 10%
Milestones that are coming soon. 0%
0%
Name Finish Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan (Tahun
LATE TASKS
Tasks that are past due.
Galian tanah poer & Tue 24/03/20 Thu 14/05/20 41 days 0% Pekerja[3];Ma
sloof ndor;sewaexc
a[1 ls]
Drain PVC dia. 2" Sat 02/05/20 Sat 02/05/20 1 day 0% Pekerja;Mand
(termasuk ijuk) or;Pipa PVC
AW dia- 2
"[129
m1];perlengka
pan pipa[4]
Beton lantai kerja t.5 Thu 04/06/20 Sat 20/06/20 15 days 0% Pekerja[2];Tuk
cm (plat lantai dasar) ang batu kayu
besi[3];Kepala
Tukang
batu;Mandor;
Portland
Cement (PC)
@ 40
kg[151,61
zak];Pasir
Pasang/cor[20
,68 m3];Batu
Pecah
Mesin/Stensla
h 2/3[41,35
m3]
Showing 100 of 316 rows. Project can only show 100 rows. Try using a filter to get better results
CASH FLOW Actual Cost Baseline Cost Remaining Cost Cost Variance
Rp 0 Rp Rp Rp 0
Rp 2.500.000.000
6.028.845.04 6.028.845.04
Rp 7.000.000.000
Rp 2.000.000.000 9 9 Rp 6.000.000.000
Rp 5.000.000.000
Rp 1.500.000.000 The chart shows the project's cumulative cost and the cost per quater.
Rp 4.000.000.000
To see the costs for a different time period, select the Edit option
from the Field List.
Rp 3.000.000.000
Rp 1.000.000.000
The table below shows cost information for all top-level tasks.
Rp 2.000.000.000 To see cost stats for all tasks, set the Outline Level in the Field List.
Rp 500.000.000
Rp 1.000.000.000
Rp 0 Rp 0
1 2 3 4
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
1% Rp 7.000.000.000
Rp 6.000.000.000
1%
CUMULATIVE COST
COST
% COMPLETE
Rp 5.000.000.000
1% Rp 4.000.000.000
Rp 6.028.845.049 0% Rp 3.000.000.000
Rp 2.000.000.000
0%
Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
0%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp 0 Rp Rp Rp Rp 0 Rp 1.000.000.000
Rehabilitasi Fasilitas 6.028.845.049 6.028.845.0 6.028.845.04 Rp 0
Gedung Pendidikan 49 9 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
10% Rp 7.000.000.000
Rp 6.000.000.000
8%
CUMULATIVE COST
COST
% COMPLETE
Rp 5.000.000.000
6% Rp 4.000.000.000
Rp 6.060.237.607 4% Rp 3.000.000.000
Rp 2.000.000.000
2%
Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
9%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 6.100.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.900.000.000
Rp 5.800.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 5.700.000.000
Cost Cost Rp 5.600.000.000
Rp 5.500.000.000
Pembangunan / Rp Rp Rp Rp Rp 31.392.558 Rp 5.400.000.000
Rehabilitasi Fasilitas 457.023.57 5.603.214.029 6.028.845.0 6.060.237.60 Rp 5.300.000.000
Gedung Pendidikan 9 49 7 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
30% Rp 7.000.000.000
25% Rp 6.000.000.000
CUMULATIVE COST
COST
% COMPLETE
20% Rp 5.000.000.000
Rp 4.000.000.000
Rp 6.089.313.511
15%
Rp 3.000.000.000
10% Rp 2.000.000.000
5% Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
24%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp Rp Rp Rp 60.468.462 Rp 1.000.000.000
Rehabilitasi Fasilitas 1.749.177. 4.340.135.949 6.028.845.0 6.089.313.51 Rp 0
Gedung Pendidikan 562 49 1 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
35% Rp 7.000.000.000
30% Rp 6.000.000.000
CUMULATIVE COST
COST
% COMPLETE
25% Rp 5.000.000.000
20% Rp 4.000.000.000
Rp 6.114.428.710
15% Rp 3.000.000.000
10% Rp 2.000.000.000
5% Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
32%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp Rp Rp Rp 85.583.661 Rp 1.000.000.000
Rehabilitasi Fasilitas 2.578.199. 3.536.229.703 6.028.845.0 6.114.428.71 Rp 0
Gedung Pendidikan 008 49 0 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
40% Rp 7.000.000.000
35% Rp 6.000.000.000
CUMULATIVE COST
COST 30%
% COMPLETE
Rp 5.000.000.000
25% Rp 4.000.000.000
Rp 6.122.591.453
20%
15% Rp 3.000.000.000
10% Rp 2.000.000.000
5% Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
37%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp Rp Rp Rp 93.746.404 Rp 1.000.000.000
Rehabilitasi Fasilitas 3.140.362. 2.982.229.121 6.028.845.0 6.122.591.45 Rp 0
Gedung Pendidikan 332 49 3 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
50% Rp 7.000.000.000
Rp 6.000.000.000
40%
CUMULATIVE COST
COST
% COMPLETE
Rp 5.000.000.000
30% Rp 4.000.000.000
% COMPLETE
44%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp Rp Rp Rp 93.746.404 Rp 1.000.000.000
Rehabilitasi Fasilitas 3.562.909. 2.559.682.306 6.028.845.0 6.122.591.45 Rp 0
Gedung Pendidikan 147 49 3 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
70% Rp 7.000.000.000
60% Rp 6.000.000.000
CUMULATIVE COST
COST
% COMPLETE
50% Rp 5.000.000.000
40% Rp 4.000.000.000
Rp 6.122.591.453
30% Rp 3.000.000.000
20% Rp 2.000.000.000
10% Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
65%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp Rp Rp Rp 93.746.404 Rp 1.000.000.000
Rehabilitasi Fasilitas 4.123.418. 1.999.173.039 6.028.845.0 6.122.591.45 Rp 0
Gedung Pendidikan 414 49 3 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
100% Rp 7.000.000.000
Rp 6.000.000.000
80%
CUMULATIVE COST
COST
% COMPLETE
Rp 5.000.000.000
60% Rp 4.000.000.000
% COMPLETE
87%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp Rp Rp Rp 93.746.404 Rp 1.000.000.000
Rehabilitasi Fasilitas 5.251.973. 870.618.172 6.028.845.0 6.122.591.45 Rp 0
Gedung Pendidikan 281 49 3 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun
COST OVERVIEW Progress made versus the cost spent over time. If % Complete line below the cumulative cost
line,your project may be over budget.
120% Rp 7.000.000.000
100% Rp 6.000.000.000
CUMULATIVE COST
COST
% COMPLETE
80% Rp 5.000.000.000
Rp 4.000.000.000
Rp 6.122.591.453
60%
Rp 3.000.000.000
40% Rp 2.000.000.000
20% Rp 1.000.000.000
0% Rp 0
REMAINING COST
% COMPLETE
99%
COST STATUS
Cost status for all top-level tasks. Is your baseline zero?
Try setting as baseline
Chart Title
Rp 7.000.000.000
COST STATUS Rp 6.000.000.000
Cost status for top level tasks. Rp 5.000.000.000
Rp 4.000.000.000
Name Actual Cost Remaining Baseline Cost Cost Variance Rp 3.000.000.000
Cost Cost
Rp 2.000.000.000
Pembangunan / Rp Rp 0 Rp Rp Rp 93.746.404 Rp 1.000.000.000
Rehabilitasi Fasilitas 6.122.591. 6.028.845.0 6.122.591.45 Rp 0
Gedung Pendidikan 453 49 3 Pembangunan / Rehabilitasi Fasilitas Gedung Pendidikan
(Tahun (Tahun