This document outlines a 21 day project to rectify and realign the stack transition inlet duct. The project involves installing scaffolding and temporary supports, cutting the duct, cleaning and preparing surfaces, installing a template, fitting up and welding the duct, cleaning, removing the template and temporary supports, and conducting inspections. The project is scheduled to start on March 18th and be completed by April 7th.
Original Description:
Original Title
Rectification to Realign Stack Transition Inlet Duct 16032020.rev2(1)
This document outlines a 21 day project to rectify and realign the stack transition inlet duct. The project involves installing scaffolding and temporary supports, cutting the duct, cleaning and preparing surfaces, installing a template, fitting up and welding the duct, cleaning, removing the template and temporary supports, and conducting inspections. The project is scheduled to start on March 18th and be completed by April 7th.
This document outlines a 21 day project to rectify and realign the stack transition inlet duct. The project involves installing scaffolding and temporary supports, cutting the duct, cleaning and preparing surfaces, installing a template, fitting up and welding the duct, cleaning, removing the template and temporary supports, and conducting inspections. The project is scheduled to start on March 18th and be completed by April 7th.
Rectification to Realign Stack Transition Inlet Duct
ID Task Task Name Duration Start Finish Predecessors April 2020
Mode 10 13 16 19 22 25 28 31 03 06 09 1 Rectification to Realign Stack Transition Inlet 21 days Wed 18/03/20 Tue 07/04/20 Duct 2 Install scaffolding 3 days Wed 18/03/20 Fri 20/03/20 3 Install temporary support 2 days Thu 19/03/20 Fri 20/03/20 2SS+1 day 4 cutting 2 days Sat 21/03/20 Sun 22/03/20 3SS+2 days 5 cleaning 1 day Mon 23/03/20 Mon 23/03/20 4 6 surface preparation for fit up 2 days Tue 24/03/20 Wed 25/03/20 5 7 Template preparation 3 days Thu 19/03/20 Sat 21/03/20 3SS 8 Material (addition plate and consumption 7 days Thu 19/03/20 Wed 25/03/20 7SS accessories) 9 Install template 1 day Thu 26/03/20 Thu 26/03/20 6;7 10 fit up 2 days Fri 27/03/20 Sat 28/03/20 9;8 11 survey 1 day Sun 29/03/20 Sun 29/03/20 10 12 full weld (2 Shift) 6 days Mon 30/03/20 Sat 04/04/20 11 13 cleaning - stand clean oil 3 days Fri 03/04/20 Sun 05/04/20 12FF+1 day 14 removal of template 1 day Mon 06/04/20 Mon 06/04/20 13 15 remove temporary support 1 day Mon 06/04/20 Mon 06/04/20 14SS 16 Inspection 1 day Tue 07/04/20 Tue 07/04/20 15