Annex 1 Schematic Diagram of - Subproject
Annex 1 Schematic Diagram of - Subproject
ANNEX 1
Schematic Diagram of
_________________________________Subproject
SPRING BOX
11 (elev = 750 m) (PUROK /SITIO_______)
710 m.
j
F6
i 10 (elev = 730 m)
100 m. HH = 12
RESERVOIR
(elev = 735 m) 9
735 60 m.
h
6 (elev = 733 m)
733
f
320 m. 240 m.
e
(elev = 709 m) 7 (elev = 710 m)
HH = 6 8 HH = 6 d
F5 g 200 m. F4 (elev = 720 m) 4 20 m. 5 F3
F3
720 (elev = 719 m)
HH = 10
(PUROK/SITIO__________)
c 1,200 m.
10 m.
(elev = 704 m) 2 b 3 F2
704 (elev = 703.5 m)
Preparation of schematic diagram as basis for pipeline design: HH = 6
Steps:
1. Locate tapstand and name it F1…n starting from farthest
to the reservoir and or water source.
2. Determine the number of nodes and name it in numbers a 500 m.
starting from farthest to the reservoir and or water source.
3. Determine the number of sections and name it in letters
starting from farthest to the reservoir and or water source. (PUROK/SITIO_____)
4. Indicate the number of HH per tapstand, the elevation of
the nodes, the length of the sections from survey results. HH = 10
5. Design for the pipe diameter of the sections (see pipeline analysis) 1 (elev = 700 m)
and indicate final pipe sizes in the schematic diagram. 700
F1
KALAHI-CIDSS
Planning and Design WS
Schematic Diagram/Project Area Map
ANNEX 1
Prepare a map showing the area to be served and the location of the source(s) of water. It should be drawn to a
convenient scale or with measurements of distance between important structures along roads and pathways.
Include elevation. Indicate houses, schools, churches, markets, existing water systems, public faucets, reservoir
and other important land features.
Legend
House
School
Church
Public faucet
Existing pipeline
Proposed pipeline
R Reservoir
Gate valve
Check Valve
Reducer
Clinic
Contours
º123 Elevations
S Spring Box
KALAHI-CIDSS