Site visit Report (T1 Submission)
On
1
College of Engineering Pune
(An autonomous institute of Gov. of Maharashtra)
Wellesley Rd, Shivajinagar, Pune
Maharashtra-411005
Certificate
Date:
Place:
Faculty Incharge
Dr. N.A Hedaoo
2
MIS - 122120005
(YEAR 2021-22)
SITE VISIT
Introduction
The aim to go on construction site visit was to make us
aware of practical and field aspects of construction techniques.
The site named as “Kekarav Project” situated at Bavdhan
hills taken as a site for visit with the reason of having ongoing
work of pavement and retaining wall construction for land
development. The attempt was made to correlate theoretical
aspects of construction techniques and detailing of various
construction elements with the practical concept that is usually
applied on the field.
3
Second site visit on “Chandani Chowk Junction
Development Project” taken as a site for visit with the reason
of having ongoing work of retaining wall construction for
extension of width of highway.
4
Fig.2 Model of Kekarav Project
5
Fig.3 Kekarav Project
7
Fig.5 PQC Road
The steps in the construction of cement concrete roads are the
following:
1. Preparation of subgrade/sub-base
2. Placing of formwork.
3. Batching of materials
4. Proportioning of the mix
5. Preparation of the mix
6. Transporting and laying the mix
7. Compaction
8. Joints
9. Screeding and finishing the surface
10. Curing
11. Opening of traffic
8
Highlights of Chandani Chowk Junction Development Project:
9
growing area of Bhugaon & Bhukum. This western gateway also
leads to Hinjewadi, the IT economic centre, and thus you can
imagine the state of traffic at this junction at peak hours. As if this
was not enough, the Chandni Chowk junction is located exactly at
the crest of hills, and slopes down in three directions – towards
Kothurd, towards Bhugaon and towards Pashan.
10
Fig.8 Construction of Graviloft retaining wall @ Kekarav Project
Benefits:
• Backed by vigorous physical laws and time tested experiments
• 20% to 35% savings in cost
• Safety standards not-compromised
• No new materials recommended
• Reduced foundation width and lessened excavation
• Light structure and uniform pressure distribution
• No skilled labour required
• Time saving due to speedy construction
• No special shuttering required
• Minimum supervision required