Fully Comprehensive
The Service Provider shall bear the full cost of all repairs, breakdowns and failures except if it is attributable
to an original defect issue, warranty issue, or third-party liability. However, the liaison and coordination to
resolve shall be the responsibility of the Service Provider.
Planned Preventative Maintenance (PPM)
The Service Provider shall undertake regular maintenance in accordance with the minimum maintenance
tasks. This represents a preventative maintenance regime that is intended to minimize breakdowns and
failures through the regular and systematic servicing. The contractor shall strive to carry out all aspects of the
scope of work in most cost-effective manner. Priority shall be on all out efforts to repair a piece of equipment
rather than replacing it with a new one. (PPM yearly plan with schedule and check list to be prepared and
produced)
a) All specialist contractor PPM and equipment PPM shall be provided with maintenance service cost
all-inclusive except spare materials as per the maintenance frequency mentioned in QNT/HQ -
Master Asset list
b) Any missed PPM with the verification of QM representatives/engineers, related PPM invoices will
not be paid
c) Missed PPM shall be scored zero accordingly in the SLA/KPI monthly
Page 19 of 69
d) Maintenance Schedule (PPM frequency) is the minimum but service provider is responsible to exceed
the minimum whenever the client requires in order for the asset to perform on optimum level.
e) The Service Provider is responsible to ensure that his planned preventative and servicing regime
meets and / or exceeds any pre-condition of the warranty agreement provided by the
manufacturer/supplier for those assets that are still under warranty.
Servicing
The Service Provider shall undertake periodic checks and service to ensure the asset is operating to its optimal
performance.
Reactive Maintenance
The Service Provider shall respond to a breakdown / failure and provide reactive attention in order to return
the asset to full operational status. The time limits for the response / rectification shall be as defined in
Appendix E Performance Monitoring Regime (PMR).
Labour Cost
All mentioned type of maintenance services in this comprehensive contract is all-inclusive of labour cost
Page 20 of 69
a) The scope of work shall include all associated Electrical, Mechanical, plumbing, HVAC system and
Safety Systems including sensing, monitoring and shut-down systems.
b) Periodic monitoring of the air quality & cleaning and deodorizing of the A/C ducts or deployment of
any other methods or means to improve the quality of air shall also be the part of contractor’s
responsibilities.
c) Yearly testing for the water quality in chilled water systems. Flushing and subsequent chemical
treatment in case chilled water parameters are not according to the stipulated values.
d) The contractor shall maintain the fire safety systems at all the facilities in good functional condition
as intended and shall carry out any software update, reprogramming or any other software related
issues of the existing system.
e) Emergency trouble shooting and preventive maintenance during “after office” hours, weekends and
official holidays.
f) The contractor shall also be responsible to carry out any planned/unplanned shut-down related to all
above mentioned activities in this section of the scope of work. Such shut down work shall be
performed in a planned manner ensuring that the other activities/operations happening in a site,
which are not affected by the shut-down, are least effected.
g) Maintenance/repairs of the Lifting & material handling Equipment. Provision of competent third-party
certification agency for the testing & certification of related equipment on as and when required basis.
h) Maintenance and repairs of various air curtains and exhaust fans
i) Related support and assistance to the Events Management Team as required shall be part of the
Service Provider scope.
j) Cleaning and Sanitizing of Water Tanks
k) Monthly & Yearly servicing, maintenance, and repairs of various Elevators.
l) Servicing, maintenance, and repairs of various types of doors including automatic sliding glass doors,
all automatic and powered doors including roller shutter doors
m) Supply & changing of various light bulbs and associated accessories viz., Chokes, Ballasts etc., after
fitting out
n) Documentation like: Submission of daily reports, checklist, material issuance, store & material
inventories and monitoring, and other reports related to the scope as QM required.
o) Adequate Records/ Logbooks pertaining to above activities shall also be maintained.
GENERAL SERVICES
1. The service provider shall submit and provide daily manpower rates. This shall apply/reflected in
the monthly invoices of the service provider
2. Daily attendance will be checked through a biometrics system and daily report should be submitted
3. Absenteeism on any staff shall be penalized with deduction using daily wages rates.
4. Minimum of at least 50% of the total manpower proposal must be available on the 1 st week of the
mobilization and 100% manpower fully mobilize as per agreed contractual.
5. All Specialist PPM shall start from day 1 of the contract. FM contractor shall provide required
services, otherwise, missed PPM services and its invoices will not be paid
Page 21 of 69
8. Spares & Consumables
The contractor/services provider shall provide a list of spares it will provide with the Tender return, the list of
spares shall be agreed with the Client prior to commence the works.
The FM Service Provider is also responsible for the management, inventory, and storage of all the spares,
consumables, and materials during contract period including all handed over by the pre-contractor.
Warranty
All warranties and upcoming warranties of the site assets (including MEPF, Sanitaryware’s, Irrigation,
Fountains,, kitchen equipment, Doors, Shutters, glazing architectural, civil and landscaping etc.) shall be
managed by the Service Provider. Service Provider shall be capable for managing & pursuing the warranty
claims vis-à-vis QM’s equipment at various facilities.
9. Lifting Equipment
All lifting equipment’s that will be used by the Facilities Management team in the operation of their work
shall be provided, maintained, tested, certified, and operated by the Service Provider under this contract in
accordance with the required legislation and guidance.
10. Compliance to Regulations and Standards
All of the above mentioned functions shall be carried out in a safe manner in accordance with QM Standards
(HSE Manual, FMD OPG, Emergency plan, etc.… ),and other standards included in this document , in addition
to Qatar Civil Defense guidelines & prevailing International Safety Standards (QCS latest version, OSHA &
NFPA).
2. Should the Client decide that the level of manpower is inadequate to fulfill the requirements of this
Contract once the Contract has been placed then the Service Provider will increase the number of
operatives to the level required by the Client at no extra charge to the Client.