You are on page 1of 2

Table-1:

SL Cable Description Route Length


1 HV Cables
3Cx400sq.mm Al Armoured XLPE
1273m
1.1 FRLSZH cable
(From MRS to DD3D) (53m is considered inside MRS )
3Cx400sq.mm Al Armoured XLPE
1073m
1.2 FRLSZH cable
(From MRS to DD3B) (53m is considered inside MRS)
LV Cable:
3.5Cx240sq.mm Al Armoured XLPE
2 950m
FRLSZH cable
(From MRS to DD3A)
3 C&N Cables
3.1 From MRS to DD3B -
3.2 From MRS to DD3D -
Please note below points:
Route length measured from MRS to DD3D leg HV joining pit (located in L&T project area) is estimated to be 750
& run length considered (53mtr) inside MRS.
HV cable length measured from MRS to DD3B leg HV joining pit (located in CSL project area) is 435m (approx.).
Cable OEM confirmed the possibility to supply HV drum for 750mtr cable length.
The length calculated is based on the route given in layout drawing submitted by CSL ( NDD Duct Revised as on 1

Cable manufactures conveyed the difficulty in supplying cable drum for cable quantity beyond 750m (confirmation
to ensure that route length of HV cables – especially leg connecting MRS to DD3D shall not exceed 750m (max). I
and HDD vendor recommendation, If the cable length exceeds 750mtr, HV joining pit location to be moved towa
Total Length in meter Length of cable in HDD Method

1273*1.05(margin)
546 meter x 2runs (till point B)
1336m x 2runs

1073*2*1.05(margin)
870 meter x 2runs
1126m x 2runs
950*1.05(margin)

997m x 2runs 546 meter x 2runs

- 1025 meter
- 665 meter

in L&T project area) is estimated to be 750m (approx.) from the drawing

ed in CSL project area) is 435m (approx.).


ble length.
mitted by CSL ( NDD Duct Revised as on 11.04.2022)

cable quantity beyond 750m (confirmation awaited). Hence, request CSL


S to DD3D shall not exceed 750m (max). In later stage after civil design
HV joining pit location to be moved towards CSL boundary.

You might also like