Weekly
Engine
1 Check water level in radiator and top up as required
Water Pump
Check seals at each end of the impeller shaft and make sure that water is
1 dripping. With the pump running at tick over speed the drip rate should be 10
to 120 80 drips per minute. Adjust the stuffing box gland if necessary
2 Top up Grease in the nipples on the bearings at each end of the impeller shaft
Control console
1 Check the conductivity meter alarm by pressing the alarm button
2 Check the conductivity meter set positions by selecting a set position on the
meter and confirm the monitor reading
3 Remove rear panel and check for any general water leakage from hose
connections. Tighten if necessary
4 Check the cable between the conductivity meter and the monitor and ensure
that the connection is secure
www.translink-international.com
TECH
Monthly
Engine
1 Check Gearbox oil and top up as necessary
Water Pump
1 Check gearbox oil level and top up as necessary
With about 300mm of water in the tank, open drain tap and check that the
1 alarm sounds at the Hi level mark, but the engine continues to run. The
engine should shut down at the low level mark
2 Check the wash gun for mechanical damage, and correct function.
3 Check tank drain tap operates and that is not blocked with any debris/ plastic
4 Check tank for any mechanical damage due to any road accidents
Check conductivity probe, by connecting the probe from the portable meter
5 to the back of the fixed meter and cross check to ensure readings are within
10% of each other
www.translink-international.com
TECH
500 Hours (or 3 months)
Engine
1 Air cleaner restriction check
7 Change oil
8 Change filter
Water Pump
1 Check pump block temperature (should be warm to the hand when the pump
has been running)
6 Remove & check wash gun nozzle for any debris from inside of hose
line/sealing tape
www.translink-international.com
TECH
9 Trailer - Check tyre pressure
www.translink-international.com
TECH
Water Pump
1 Change gearbox oil
3 Check drip rate and if excessive replace Grafoil rings in stuffing block
www.translink-international.com
TECH
Water Pump
1 Check for any leakage
www.translink-international.com