You are on page 1of 1

SITE INVETIGATION FOR HYDRO ENERGY POWER PLANT

No Item Unit

A FIELD SURVEY & DATA COLLECTING

A.I TOPOGRAPHY & BATHYMETRY SURVEY


1 Mobilization and Demobilization lump sum
Topography Survey + LIDAR (Light Distance And Ranging) (main structures area - Drone equipped with laser sensor (Lidar)
2 Ha
& access road) - Waterpass, Total Station, Tripod, GPS, etc.
3 Benchmarking 6 points - Reinforce Concrete with marker unit
4 River cross section survey at the dam site & tailrace outlet - Boat, rope, measuring instrument,etc. lump sum

A.II HYDROLOGY SURVEY


1 Water level Measurement - Staff gauge, waterpass, time meter, etc
- Mobilization and Demobilization lump sum
- Water Level survey 15 days lump sum
- Peilscale lump sum
2 Water Quality Test and Sediment Analysis - Boat, staff gauge, etc.
- Boat rent days
- Sewa water sampling (3 depth) lump sum
- Bed load sediment sampling lump sum
- Laboratory Test of Water Quality lump sum
- Laboratory Test of Bed Load & Suspended Load Sediment lump sum
3 Groundwater sampling - Boat, staff gauge, etc.
- Groundwater samping lump sum
- Laboratory Test of Groundwater Quality for Power Plant lump sum
4 Water Current and Discharge Measurement - Current meter, staff gauge, etc. lump sum

A.III GEOTECHNICAL SURVEY


1 Mobilization and Demobilization
2 Onland Investigation (Soil Investigation) - Boring machine, gps, corebox, etc
- Left Side of Dam (1 point) m
- Right Side of Dam (1 point) m
- Centre of Dam (1 point) m
- Sandtrap (1 point) m
- Headpond (1 point) m
- Penstock (2 points) @ 15 m m
- Powerhouse (2 points) @ 20 m m
- Waterway (open channel) (2 points) @ 40 m m
- Waterway (tunnell) (4 points) @ 60 m m
- Quarry (2 points) @ 15 m m
Undisturbed Sample Interval 5 m and Transported to [Filled with city name] sample
SPT interval 2 m Unit
Core box each 5 m unit
3 Laboratory
Laboratory Test of Soil Sample; include characteristic test, strength tes,
consolidation test, grain analysis test, density and moisture content and direct sample
shear.

A.IV GEOLOGY SURVEY

1 Geology Survey (mapping at main structures including dam, intake, waterway, - GPS, measuring tools, camera, theodolite, lump sum
penstock, & powerhouse) waterpass, lasermeter, levelling staff, etc.
2 Seismic Exploration - Seismometer, geophone, etc lump sum

3 Construction material survey (to investigate physical & technical property and lump sum
availability for concrete & rock fill material)
A.V GEOELECTRIC SURVEY
1 Mobilization and Demobilization lump sum
2 Geoelectric survey - Current transmitter, resistivity meter, electrode, etc. Unit

A.VI SECONDARY DATA COLLECTION

1 Climate Data (Monthly Rainfall for min. 10 years, Air Temperature, humidity) lump sum
2 Monthly Wind Data lump sum
3 Maps & Related Charts lump sum
4 Hidrology Data lump sum
5 Seismic Data lump sum

B ANALYSIS & MODELING

B.I HYDROLOGY ANALYSIS lump sum

B.II GEOTECHNICAL PARAMETER ANALYSIS lump sum


1 Seismic & liquefaction analysis lump sum
2 Foundation & settlement analysis lump sum

You might also like