Minutes Of Meeting

Monthly Contractor Drilling HSE Meeting No.011/2014


st
Date/Time : 21 October 2014, 2.00pm – Venue : 3rd floor meeting room
4.00pm
Prepared by: Haris Aryanto Reviewed by: Heru Hermawan

Target
No Item Action Party
Date

1.0 Opening Remark Info

Mr. Norazan welcomed all members


He shared lifeboat fatality from other rig in Malaysia
operation. He reminded Contractor’s team to have
supervisor in every task. He also highlight
administration issue, regarding contractor shall provide
high impact safety gloves to their crew.
Refer to new revision of PPE guideline that utilized All Nov 14
cotton gloves/polkadot is not allowed in PETRONAS
operation

Mr.Heru reminded to Contractor, that Lamongan


Supply Base/LSB is first filter for materials and
equipments prior send to Rig. He encourages LSB team
to do this function accordingly. There for he requested
contractor shall follow PETRONAS requirement ie: valid
certificate in place, put manifest and weight indicator.

2.0 Safety Moment


- Mr. Lance shared regarding rig floor rules, Info
Visitor shall report to tool pusher when will go
to in the rig floor
- Mr. Iskandar shared utilized of safety belt

3.0 HSE performance 2014 presentation


3.1 INO HSE presented FY 2014 YTD performance of INO
drilling as of September 2014 (attached) Info

4.0 Lesson Learned


There was no presentation on lesson learned

5.0 HSE Improvement Sharing


5.1 ISOS shared a presentation regarding study case of LTI All
at Topaz (attached)
Minutes Of Meeting
5.2 INO HSE shared a presentation of new near miss report
form
(Attached)

6.0 Group discussion


6.1 Group 1 All
Topic : How to improve Safety leadership
Way Forward:
- Promote safety leadership by visiting the rig
schedule monthly visit/meeting with the
contractor
- Empowering people by enforce other to speak
up, group discussion (social media)
- Open culture
- Clear expectations
- Leading by example
- Accountability
- Evaluation of implementation
- Reward program/recognition

Group 2
Topic : How to improve for managing sub contractor
Way Forward:
- From annual change to conduct random site
audit
- From 1 department evaluation to multiple
department evaluation
- Create more competition within sub contractor
- Logistic : Constant monitoring, install
GPS/tracking system, early call out
- Reward /incentives

Group 3
Topic : How to improve effectiveness to control the risk
Way Forward:
- Preventive Maintenance System/PMS
- SMART action item
- Periodic review to confirm the implementation-
include 3rd party visit/audit
- Accountable of assign person
- Sharing the lesson learnt via LPT
- Refresh training
- MOC
- Risk verification-continue monitoring
- Management visibility & follow up
- Recognition
Minutes Of Meeting
- Risk registered maintained and up to date
- Hazard hunt

7.0 AOB
7.1 Mr. Alfian encouraged to Contractor’s top management
for participating in Management HSE Visit (MHSEV) to Contractor End Nov
rig. However they should obtain Offshore Safety 2014
Passport (OSP).

8.0 Closing Remark


Next
8.1 Mr. Heru expect that recommendation result/way All Monthly
forward on group discussion could be implemented at Meeting
worksite/rig and measurable