CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)

HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH ERECTION OF STEEL STRUCTURE REV. NO. 0

LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017

PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 1 of 2
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

1. Mobilization of Mobile R Existing steel Knocking / Admin PTW to be obtained (if 3 4 12 PE,
Crane structure Electrocution required) (M) SS
Identified excess route &
Conduct toolbox to operator.
Valid PMA & Competency
Certificate
Safety clearance to be
adhered at all time.
Culvert, cable Knocking / Admin Provide steel plate across soft 3 4 12 PE,
trenches, soft Electrocution ground and cable trenches. (M) SS
road & power line Adhere to speed limit, height &
Provide route plan
Safety clearance to be
adhered at all time.
2. Setting up of Mobile R Soft ground Crane topple Admin Timber padding with proper 3 4 12 PE,
Crane down / alignment, Outriggers to be (M) SS
PPE
Knocking / fully extended. Wear glove,
Electrocution Safety Helmet & Safety Boots.

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH ERECTION OF STEEL STRUCTURE REV. NO. 0

LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017

PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 2 of 2
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

3. Lifting of Steel R Steel structure Falling object Admin Use tagline on equipment to 3 3 9 SS,
Structure (Lifting materials) control motion/moving. Cordon (M) GW
PPE
off work area and display
warning signage. Ensure
proper communication. Use
experienced signalman to
control lifting. Wear Safety
Helmet, Safety Boots.
Parts of steel Falling object Admin Loose parts / material must be 3 3 9 SS,
structure removed. Equipment/Materials (M) GW
Wire rope should be secured properly
and balanced.
(Lifting material)
Ensure the lifting gears are
inspected prior to use.Cordon
off work area and display
warning signage
Steel structure Hit by object Admin Use experienced signalman 3 3 9 SS,
for rigging work. Wear hand (M) GW
PPE
glove. Ensure proper
communication between
LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH ERECTION OF STEEL STRUCTURE REV. NO. 0

LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017

PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 3 of 2
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

operator & riggers.


4. Installation of Steel R Steel structure Hit by object Admin Cordon off work area and 2 3 6 SS,
Structure display warning signage. Wear (M) GW
PPE
safety helmet.

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.