0% found this document useful (0 votes)
251 views2 pages

Ballast / De-Ballasting Operation: Pump - in

The document outlines the procedures for ballast and de-ballasting operations, including pump-in and pump-out instructions for two ballast pumps. It details the steps for gravity in and out operations, as well as ballast tank stripping and cargo hold bilge eduction processes. Each operation specifies the valves to be opened or closed and the pumps to be started for effective management of ballast water.

Uploaded by

Manish Pankaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
251 views2 pages

Ballast / De-Ballasting Operation: Pump - in

The document outlines the procedures for ballast and de-ballasting operations, including pump-in and pump-out instructions for two ballast pumps. It details the steps for gravity in and out operations, as well as ballast tank stripping and cargo hold bilge eduction processes. Each operation specifies the valves to be opened or closed and the pumps to be started for effective management of ballast water.

Uploaded by

Manish Pankaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

BALLAST / DE- BALLASTING OPERATION

PUMP – IN

FOR #1 BALLAST PUMP - OPEN

SEA CHEST - B1 - #18 - #10*(NORMALLY OPEN) – AFT (ONLY FOR AFT PEAK TANK) & START THE PUMP

FOR #2 BALLAST PUMP - OPEN

SEA CHEST - B2 - #20- #10 – AFT (ONLY FOR AFT PEAK TANK) & START THE PUMP

PUMP – OUT

FOR #1 BALLAST PUMP - OPEN

#10 - #12 - #28- OVBD VALVE– AFT (ONLY FOR AFT PEAK TANK) & START THE PUMP

FOR #2 BALLAST PUMP - OPEN

#10 - #16 - #118- OVBD VALVE– AFT (ONLY FOR AFT PEAK TANK) & START THE PUMP

GRAVITY – IN

SEA CHEST - B1 - #12 - #10 – AFT (ONLY FOR AFT PEAK TANK)

SEA CHEST - B2 - #16 - #10 – AFT (ONLY FOR AFT PEAK TANK)

GRAVITY – OUT

#10 - #18 - #28- OVBD VALVE – AFT (ONLY FOR AFT PEAK TANK)

#10 - #20 - #118- OVBD VALVE – AFT (ONLY FOR AFT PEAK TANK)

BALLAST TANK STRIPPING

1. OPEN VALVE #2
2. CLOSE FIRE & GS DISCHARGE VALVE TO FIRE LINE
3. OPEN VALVE #10- #14 - #24- OVERBOARD
4. START FIRE & GS PUMP
5. OPEN MAIN BALLAST VALVE AND PORT& STBD VALVE
6. OPEN AFT VALVE ONLY FOR AFT PEAK TANK

CARGO HOLD BILGE EDUCTION

1. OPEN VALVE #2(SUCTION VALVE FOR FIRE & GS)


2. CLOSE FIRE & GS DISCHARGE VALVE TO FIRE LINE
3. OPEN VALVE #14 - #24 – OVERBOARD
4. START FIRE & GS PUMP
5. OPEN CARGO HOLD BILGE MAIN

You might also like