67m3
EXCAVATION
12.40 Item E 324
2.55
1.58 Excavation for foundation mat.
other than top soil rock or artificial
49.96 mat. maximum depth 1 - 2m.
m
12.4
1.58m
2.5
5m
Toe
2/ 5.25 Item E321
0.20
0.25 m
5.25
0.53
0.25m
0.2
m
0.25m
0.2
m
Apron
Item E321
2/ 3.9 2.55m
1.35
1.58 16.64
1.35m
67.12
0.25m
5.25m
MEASUREMENT SHEET
PROJECT: 2/ 900MM DIAMETER PIPE CULVERT
PLACE CONCRETE
6m3
Toe
Item F522
2/ 5.25 Ditto Drawing
0.2
0.25
0.53
Apron
Item F623
2/ 3.9 Ditto Drawing
1.35
0.23
2.42
Wingwall
2/2/ 2.19 Item F642
0.20 Ditto Drawing
1.28
2.24
Headwall
2/ 2.55 Item F642
0.2
0.60 Ditto Drawing
0.61
5.80
CONCRETE SURROUND
Item L544
12.40
12.40 12m
MEASUREMENT SHEET
PROJECT: 2/900MM DIAMETER PIPE CULVERT
Provide Formwork
Rough Finish
40m2
Item G115
2/ 12.40
1.35m
1.35
33.48
12.40m
Item G115
2/ 2.55
1.35
1.35m
6.89
40.37
2.55m
MEASUREMENT SHEET
PROJECT: SINGLE 900MM DIAMETER PIPE CULVERT
EARTHWORKS
Excavation
36m3
Base
Item E324
10.90
1.40 0m
10.9
1.43
21.82 1.43m
1.4
0m
Apron
Item E322
2/ 2.91 1.40m
1.63
1.43
13.57
1.63m
1.63m
0.18m
4.41m
Toe
Item E324
2/ 3.78
0.25 m
3.78
0.55
0.55m
1.04
0.2
36.43 5 m
MEASUREMENT SHEET
PROJECT: SINGLE 900MM DIAMETER PIPE CULVERT
PROVIDE CONCRETE
B/F
4.81 Base
PLACE CONCRETE
8m3
Wingwall
2/ 1.91 Item F642
0.23
0.89 ditto drawing
0.78
Apron
2/ 2.91 Item F622
1.63
0.28 Ditto drawing
2.66
Toe
2/ 3.78 Item F523
0.25
0.55 Ditto drawing
1.04
Headwall
2/ 1.40 Item F643
0.20
0.60 Ditto drawing
0.34
MEASUREMENT SHEET
PROJECT: SINGLE 900MM DIAMETER PIPE CULVERT
CONCRETE SURROUND
Item L544
11m
PROVIDE PIPES
Item I242
11m
PROVIDE FORMWORK
ROUGH FINISH
35m2
Item G115
2/ 10.9
1.43
1.43m
31.17
10.9m
Item G115
2/ 1.40
1.43
1.40m
4.00
35.18
1.43m
FAIR FINISH
18m2
MEASUREMENT SHEET
PROJECT: 600 mm U-DRAIN
405m3
m
300
2/ 300.00
0.90 0.75m
0.75 0.9
0 m
405.00
PROVIDE CONCRETE
253m3
2/ 300.00
0.90 Item F253
0.75
405.00
0.75m
30
0 m
0.90m
2/ 300.00 Less
0.60
0.30
108.00 300m
0.30
m
0.6
Less
2/0.5/3.142/ 300.00 m
0.60 300
m
0.30
0.30
84.83
212.17
Item F253
Slab
0.45m
2/375/ 0.80
0.45 0.15
80m
0.15 0.
40.50
252.67 Number of slabs required =
300/0.8
MEASUREMENT SHEET
PROJECT: 600 mm U-DRAIN
630m3
500.00
1.20
1.05m m
1.05 500
1.2
630.00 0m
PROVIDE CONCRETE
Item F253
500.00
1.20 344m3
1.05
630.00
1.05m 50
0 m
1.20m
500.00 Less
0.60
500m
0.45
135.00 0.45
0.6
Less
0.5/3.142/ 500.00
0.90m 500
m
0.45
0.45
159.04
335.96
Item F253
Slab
111/ 1.10
0.45
0.15 1.10m
8.24 0.15
5m
344.20 0.4
MEASUREMENT SHEET
PROJECT: RETAINING WALL
2170m3
200.00
3.50
3.36m
2.84m
3.36m
2.84m
3.10
3.50m
2170.00
h= 1/2(3.36 + 2.84)
h = 3.10
PROVIDE CONCRETE
Item F253
200.00
3.50 512m2
0.4
280.00
Base
0.4
200m 3.50
Item 253
Wall
3.16m
2.64m
2.64m
0m
20
w = 1/2(2.64 + 3.16)
w = 2.90m
200.00
0.3
2.90
0.40
232.00
512.00
0.5
w = 1/2(0.30 + 0.50)
w = 0.40
MEASUREMENT SHEET
PROJECT: RETAINING WALL
PROVIDE FORMWORK
Fair Finish
582m2
Item G215
200.00
2.90
580.00
2.64m
3.16m
200m
Item G213
0.3
2.64
0.4
1.06
2.64
582.32
3.16
3.16
0.5
MEASUREMENT SHEET
PROJECT: ROAD WORKS
SUB BASE
1460m3
Item R115
1000.00 Length = 1000.00m
7.30 Width = 7.30m
0.20 Thickness = 0.20m
1460.00
BASE
Item R125
Length = 1000.00m
1000.00 Width = 7.30m
7.30 Thickness = 0.20m
0.20
1460.00
MEASUREMENT SHEET
PROJECT: ROAD WORKS
53m3
14mm
68.87m3
17467.4m3
572.40 - Precoating.
6745.00 - Priming
10150.00 - Sealing.
17467.4m3 - Total Bitumen
Quantity of Diesel
63.6m3
Quantity of Kerosene
1285.00m3
EASUREMENT SHEET
CONCRETE WORKS
Provide Concrete
6m3
2/ 5.25
0.2 Toe
0.25 Item F253
ditto drawing
2/ 3.9 Apron
1.35 Item F253
0.23 Provision of conc. design mix C25/20
2.42
ditto drawing
Wingwall
Item F253
2.19
m
1.35m
2/2/ 2.19
0.20
1.2m
1.28
2.24
m
0.2
h = 1/2(1.35 +1.20)
h = 1.28
2/ 2.55
0.20 Headwall
0.6
0.61
0.6m
5.80
2.55m m
0.2
NT SHEET
FORMWORK
Provide Formwork
Fair Finish
30 m2
Headwall
2/2/ 2.55 Item G214
0.60 2.55m
6.12
0.6m
2/2/ 0.6 Item G242
0.20
0.48
0.6m
0.2m
1.2m
2.19m
b = 1/2(1.35 + 1.20)
b = 1.28
2/2/ 1.2
0.2 Item G242
0.96
29.99
1.2m
0.2m
NT SHEET
Provide Reinforcement.
PROVIDE CONCRETE
8m3
Wingwall
Item F243
1.91
m
1.06m
0.73m
2/ 1.91
0.23 3m
0.2
0.89
0.78
h = 1/2(1.06 + 0.73)
h = 0.89
Apron
2/ 2.91 Item F243
1.63
0.28 ditto drawing
2.66
2/ 3.78 Toe
0.25 Item F243
0.55
1.04 Ditto drawing
Headwall
2/ 1.40 Item F243
0.20
0.60
0.34
0.6m
4.81
m
1.40m
0.2
C/F
NT SHEET
Base
Item F623
10.90
1.40 Ditto drawing
0.18
2.75
7.56
PROVIDE REINFORCEMENT
Item G524
24.48 0.888 21.74 12mm
36.72 0.888 32.61 1204
72.00 0.888 63.94 1206
115.92 0.888 102.94 1206 0.23t
13.04 0.888 11.58 1207
232.80 1211
Item G525
32.00 1.579 50.53 16mm
32.00 1.579 50.53 1601
34.80 1.579 54.95 1602
99.84 1.579 157.65 1608
25.30 1.579 39.95 1609 0.49t
50.00 1.579 78.95 1610
34.80 1.579 54.95 1618
487.50 1603
Item G523
54 0.617 33.32 10mm
0.03t
NT SHEET
Wingwall End
Item G243
2/2/ 0.73
0.23
0.73m
0.67
0.23m
Headwall
Item G214
2/2/ 1.40
0.6m
0.60
3.36
1.40m
0.6m
0.2m
0.73m
1.91m
h = 1/2(1.06 + 0.73)
h = 0.90
NT SHEET
PLACE CONCRETE
Item F541
U - Drain
212m3
Item F621
2/375/ 0.80 Slab
0.45
41m3
0.15
40.50
Ditto Drawing Slab
PROVIDE FORMWORK
643m2
0.30m 300m
Rough Finish
451m2
0.75m
300m
80m
0. 2/ 0.90
0.75m
0.75
1.35
451.35 0.90m
NT SHEET
PLACE CONCRETE
Item F541
U - Drain
335.96
344m3
1053m2
Rough Finish
Item G114
2/ 500.00 1.05m
1.05
1050.00
500m
Item G114
2/ 1.20
1.05 1.05m
2.52
1052.52 1.20m
Fair Finish
1157m2
2/ 500.00
0.45 Item G214
450.00
0.45m
500m
3.142/ 500.00
0.45 Item G255
706.95
1156.95
0.45m
500m
NT SHEET
PLACE CONCRETE
Item F621
200.00 Base
3.50
0.4 512m3
280.00
Ditto Drawing
PROVIDE FORMWORK
Rough Finish
200.00 743m2
2.90
580.00 Item G115
3.16m
2.64m
200m
b = 1/2(3.16 + 2.64)
2/ 200.00 b = 2.90m
0.40
160.00 Item G113
0.4
200
2/ 3.50
0.40
2.80 Item G113
742.80
0.4
3.50
NT SHEET
REINFORCEMENT
Item G525
3980 1.58 6284.42 16mm
2180 1.58 3444.4 1601
9728.82 1604 9.73t
Item G524
3980 0.888 3534.24 12mm
2320 0.888 2060.16 1202
10060 0.888 8933.28 1205 14.53t
14527.68 1208
Item G523
13460 0.617 8304.82 10mm
1980 0.617 1221.66 1003
680 0.617 419.56 1006
14660 0.617 9045.22 1007 18.99t
18991.26 1009
NT SHEET
PRIMERSEAL
Item R349.4
Precoated Chippings quantity
53m3
1/139 1000.00
7.30 Spread Rate = 139m2/m3
53.00 Work Area = 7300m2
Item R349.5
Precoating of Chippings (10mm)
Diesel = 10%
Bitumen = 90%
Spray Rate = 12l/m3
Chipping quantity = 53m3
Total Precoating mixture required
12 53 636.00
Diesel Quantity = 0.1 x 636 = 63.6m3
Bitumen Qty. = 0.9 x 636 = 572.4m3
PRIMING
Bitumen Content = 84%
Cutter content = 16%
Spray Rate = 1.10l/m3
Area = 7300m3
Item R349.2
Cutter Qty = 0.16 x 8030 = 1285m3
SEALING
Chipping Quantity (14mm)
Spread Rate = 106m2/m3
Total Area =7300
1/106 7300.00 68.87 Chipping Qty. = 68.87m3
Bitumen Required.
Item R349.3
Spray Rate =1.45l/m2
Total Area = 7000m2
NT SHEET
5.80
6745.2
1285