The document outlines procedures for constructing a plant, including:
1) Plant construction must be completed within 90-180 days according to the plant design.
2) All construction steps will be directly supervised by managers and technical staff.
3) Excavated ground will be removed and surfaces will be compacted before installing concrete platforms.
4) Installations will be inspected and foundations will cure for 26-30 days before installing equipment.
5) After installation and 4+ days of testing with material, the plant will be certified as fit for operation if functioning properly.
The document outlines procedures for constructing a plant, including:
1) Plant construction must be completed within 90-180 days according to the plant design.
2) All construction steps will be directly supervised by managers and technical staff.
3) Excavated ground will be removed and surfaces will be compacted before installing concrete platforms.
4) Installations will be inspected and foundations will cure for 26-30 days before installing equipment.
5) After installation and 4+ days of testing with material, the plant will be certified as fit for operation if functioning properly.
The document outlines procedures for constructing a plant, including:
1) Plant construction must be completed within 90-180 days according to the plant design.
2) All construction steps will be directly supervised by managers and technical staff.
3) Excavated ground will be removed and surfaces will be compacted before installing concrete platforms.
4) Installations will be inspected and foundations will cure for 26-30 days before installing equipment.
5) After installation and 4+ days of testing with material, the plant will be certified as fit for operation if functioning properly.
Plant construction activities accounting ground clearance, ground excavation, ground
compaction, foundations digging, concrete foundation platforms casting, plant installation, plant testing and commissioning shall not be done in a period not less 90 days and not more than 180 days and all installation measurements shall be fashioned exactly with the provided Plant Design. All plant construction steps shall be done under the direct supervision of Construction Manager, and Mining technical director and any other technical person we might wish to invite for assistance. Ground clearance and excavations shall be done by machines with the help of casual workers. Excavated ground should be conveyed to waste dump. After the three stages of excavations are dug, First stage for Rotary scrubber platform, Second stage for the Crushers and Shacking tables and the Third stage for the water tanks compaction of such surfaces shall be done by mechanically propelled compactor plus water. Installation of concrete platforms shall be include the Plant Manager in staggered chronological order shown from the design of first stage, second stage and the last stage given above to allow smooth flow of measurements. All measurements have no room for alterations and wedging shall be prohibited. All metal work reinforcements installations and securing shall be done with a method approved by the designer. Installed concrete foundations shall be allowed to set within a period of 26-30 days with thorough watering and daily inspections. Security shall be firm on wet foundations to avoid damage and alterations. Within the plant installation days the following team should be available, Chinese Engineer, Construction Engineer, Plant Manager, Technical Director and the Fitter and the CEO in his discretion. When everything is successfully installed the plant should be examined and inspected with inspection log books in writing. Plant commissioning and testing shall strictly include the CEO from the above team where the plant shall be loaded with material for a period not less than 4 days to check efficiencies, recovery and physical construction strength of the plant. When everything is okay with the plant a certificate of fitness should be awarded in writing and log books to be filled for the hand over take over purposes.