3 3 Roof Level
6.200 m

WallT 02
Selected Timber Cladding

WallT 02
Selected External Timber Cladding with Galvinised Steel Railings to
Air Gap then a Breather Membrane on Manufacturers installation instructions
80mm OSB Board on 240 x 50 Timber
Frame filled with selected Insulation 12
mm Racking Board with Vapor Retarder
38 Service Gap and 12mm Plasterboard
and Skim finish

Timber wall framing systems UCType_01


Ss_25_10_32_90 Galvanised Steel Column 152 x 152 x 37
with a Plated Finished to top
Galvinised Steel Railings to
Manufacturers installation instructions

UCType_01 Treated Timber Deck Board 125 x 18mm


Galvanised Steel Column 152 x 152 x 37
with a Plated Finished to top

UCType_01
Galvanised Steel Column 152 x 152 x 37
with a Plated Finished to top
Treated Timber Deck Board 125 x 18mm Project:

Enter address here

2 2 First FFL
3.200 m 300 300 300
Client:

Galvanised UC 127x76x13 Horizontal


Beam

Galvanised UC 127x76x13 Horizontal Galvinised Steel Railings to


Beam Manufacturers installation instructions

WallT_01
Selected External Red Brick with Air Gap Scale Bar: North:
then a Breather Membrane on 80mm Galvanised UC 127x76x13 Horizontal
OSB Board on 240 x 50 Timber Frame Beam N
filled with selected Insulation 12 mm 0 1000 2000 5000
Racking Board with Vapor Retarder 38
Service Gap and 12mm Plasterboard SCALE: 1:100
and Skim finish

20n20 Concrete Pad


DT_02
Triple Glazed Timber Framed External
Door

Galvinised Steel Railings to


Manufacturers installation instructions

Galvinised Steel Railings to


Manufacturers installation instructions
St Rev Description Date
Stainless steel support rails
Pr_20_85_07_85
Scale at A1: Chk: Checker App: Approver
Treated Timber Deck Board 125 x 18mm 1 : 20 Des: DesignerDrw: Author

1 1 Ground FFL Sheet By:


0.000 m

Sheet Title:
0 0 Bottom Found
-0.380 m Wall Sections
Galvanised UC 127x76x13 Horizontal
Beam ISO 19650 Number: (Revit Sheet Number)

Project Originator FunctionB SpatialB Form Discipline - Number

- - - - - AT 103
Wall Section 3
2 1 : 20 Status: Rev:

09/05/2022 17:11:24
C:\World Skills 2022 Docs\WS Pressure Test Master Files\WS Pressure Test 2 Arch Master.rvt