You are on page 1of 10

LCPC

accelerated pavement testing

LCPC-- Nantes machines « FABAC »


LCPC
LCPC-- Nantes carroussel (Format project
LCPC project,, New testing
testing))

Cracking in Pavement
2 Fabac Machines -> Asphalt and/or
and/or concrete pavements

Dimension length:9.80 m
width:2.50m
heigth:3.30m
Weight: 15 Tons
Power : 45 kw

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 2 /19
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 3 /19

4 trains de roulement (jumelages ou roues simples) Chaîne d'entraînement


montés sur les 2 chaînes
Chassis fixe

Moteur
électrique
Vérin fixe
pneuma-
tique Barbotin

Chaussée Parallélogramme déformable support des


équipements mobiles

Loadingconditions :
2 m longueur de chaussée
• standard twinned wheels 32,5 circulée
kN/wheel
• or single wheel :42 kN/wheel,
• speed : 3.6 km/h
• no lateral wandering
• length of road trafficked = 2 meters

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 4 /19
Area for Score fest -maximum
length 20 meter, width 3 meters
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 5 /19

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 6 /19
Sergio Pérez PhD (2003
(2003--2006)

8 cm BC5

9,5 cm GB3
PF3

Pouteau PhD (2000


(2000--2004)

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 7 /19

LCPC--Nantes carroussel
LCPC

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 8 /19
Format Project: Full Optimised Road Maintenance
start date:01-01-02 duration: 36 months Date of issue: 31-12-04

Country
17 Partners
t Belgian Road Reearch Centre (BRRC) B
t Laboratorio Nacional de Engenharia Civil (LNEC) P
t COLAS SA F
t Autopistas Delmare Nostrum SA (AUMAR) E
t United State Federal Highway Administration, Turner-Fairbank Highway Research Cebter (FHWA) US
t Laboratoire Central des Ponts et Chaussées (LCPC) F
t Universitaet Karlsruhe (Unikarl-ISE) D
t Transport Research Laboraory (TRL) UK
t Laboratory of Trafic Facilities, Federal Institute of Technology (LAVOC) CH
t Road Directorate, Danish Road Institute (DRI) DK
t Zavod za gradbenistvo Slovenije-Slovenian National Building Civil Engineering Institute (ZAG) SI
t Technical Research Centre of Finland (VTT) FIN
t Swedish National Road and Transport Research Institute (VTI) S
t Institut fur Strassenbau Strassenerhaltung, Technical Univ Vienna (ISTU) AT
t Asfalttiliittoo Ry (Finnish Asphalt Association) FIN
t Centro de Estudios y Experimentation de Obras Publicas (CEDEX) ES
t Kozlekedestudomanyi Intezet Rt (KTI Rt) HU

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 9 /19

Format Project WP3 – experiment with Lcpc’s ALT


General lay-out

Ring C used for


FORMAT experience
(sept.–dec. 2003)

3 test sites. The 3rd one is isolated


from external water table and
equiped with a pumping station

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 10/19
10 /19
Format Project WP3 – experiment with Lcpc’s ALT :
water table control system of ring C
10,41 m

3m

Adjustable watertable by
pumping

External radius 23 m
Internal radius
12.4 m
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 11/19
11 /19

Format Project WP3 – experiment with Lcpc’s ALT


RD stage 1 before application of maintenance treatment
Sector1 Sector2 Sector3 Sector4 Sector5
22.50m 22.50m 22.50m 22.50m 30m

5 cm (reference)
5 cm 8 cm 8 cm 6 cm
20 cm 20cm 20cm 20cm 8 cm

15cm 20cm
20cm 30cm

Theoretical live duration (millions loading)


0.18 0.30 0.75 1.25 1.50
BC bituminous concrete UGA untreated graded aggregates Soil
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January
(65 to2005,
100TRB,
Mpa Washington
accordingDC water level)
12/19
12 /19
BiC binder course
Format Project WP3 – experiment with Lcpc’
Lcpc’s ALT
Time schedule

Road May 2003 1.5x106 4 flexible structures + 1 bituminous


Directorate to Sept. standard loads reference structure n°5.
experiment 2003 High bearing capacity (low water table
stage1 level)

FORMAT October 1.0x106 2 overlay techniques over the the


experiment 2003 to standard loads bituminous reference structure n°5.
Dec. 2003 High bearing capacity (low water table
level)

Road January 1.5x106 4 flexible structure + 1 bituminous


Directorate 2004 to standard loads reference structure.
experiment May 2004 Low bearing capacity (high water table
stage2 level)

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 13/19
13 /19

Format Project WP3 – experiment with Lcpc’s ALT


maintenance treatment tested on sector 5
15m 15m

Cracked bituminous layer (1.5x106 standard loads)

Conventional bituminous Very thin bituminous overlay 2.5


overlay 4 cm thick cm thick incorporating geogrid

Suggested alternative (?)


10m 10m 10m

Very thin bituminous


Conventional Very thin
overlay 2.5 cm
bituminous overlay bituminous overlay
incorporating geogrid
4 cm thick without geogrid
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 14/19
14 /19
Format Project WP3 – experiment with Lcpc’s ALT
Innovative maintenane treatment VTAC + Geogrid

Geogrid CIDEX 50/20 manufactured


by « 6D solution » France

Glas fiber grid 40mm x 30mm


283g/m2

non woven polyester fibre 17g/m2

CIDEX 50/20 :
Ultimate strength : 50 kN/ m
Ultimate strain : less than 4%

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 15/19
15 /19

Format Project WP3 – experiment with Lcpc’s ALT


Innovative maintenane treatment VTAC + Geogrid

Application of Geogrid over the


bituminous tack-coat, before the
bituminous overlay placing

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 16/19
16 /19
Format Project WP3 – experiment with Lcpc’s ALT
1- Before the maintenance roadwork : Structure survey
- Cartograhy of crackings (pictures)
- Evaluation of severity of cracking (cores)
- Evaluation of structural capacity of pavement (benkelman and fwd)

2- During the maintenance roadwork :


- Laboratory tests on formulation
- Pictures …

3- After the overlays application:


- Evaluation of structural capacity of pavement with overlays (benkelman and fwd)

4- During the test :


evolution of :
- Cartography of cracking (pictures)
- Rutting
- Roughness, Sand patch, Penduleum (skid resistance)
- Drainability
- Temperatures and raining
- Ravelling, noise (?)

5- After the test:


- Cores on cracks , trenches
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 17/19
17 /19

Results

2005 Report

A. Chabot RILEM TC-


TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 18/19
18 /19
Conclusions

For the Rilem TC


TC--CAP, it can be used:
used:

-Fabac data (available


(available in 2005)

- Carroussel Format project data in (available


(available
in a 2005 report)

-> New project for 2006 : carrousel experience


with 182
182-- PEB Rilem bituminous material (0
(0--6)
A. Chabot RILEM TC-
TC- CAP
CAP-- TG1
TG1–– 9 January 2005, TRB, Washington DC 19/19