RISK ASSESSMENT

HSE RISK ASSESSMENT

PROJECT NAME: MEMUVO DMCC


Job ID:
SCOPE/ ACTIVITY: EPOXY PAINTING WORKS
RA DATE: 07/09/2022
RA REVISION NO.: R02

Kindly Note
If the severity rating lies between 1 to 16, then corrective actions
RISK MATRIX needs to be taken by the Engineer/ Supervisor with documentary
evidence, to reduce and/or eliminate the residual risk(s).

Probability

Health, Safety and Environmental Risk Classification


1 2 3 4 5
Corrective Action Risk Classification Personal Loss Financial Loss

Fatal / Permanent Major Incident


1-3 Immediate Very High - VH
Disability
1 1 2 3 4 5
4-9 Before task High - H Reportable Injury / Illness Serious Incident
commences < 3 days

Severit
2 2 4 6 8 10

y
10-16 Before task Moderate - M Non Reportable Injury / Moderate Incident
commences Illness > 3 days 3 3 6 9 12 15
Minor Incident
20-25 Acceptable Low - L First Aid Cases
4 4 8 12 16 20
Near miss / Slight
>25 Very Low - VL Clinic Visit Incident
5 5 10 15 20 25
RISK ASSESSMENT

Scope / Activity:EPOXY PAINTING WORKS


RISK Risk Residual
ASSOCIATED Rating Risk
No. HAZARD IDENTIFIED WITH CONTROL MEASURES BY WHOM BY WHEN
HAZARD S P R S P R

Dust exposure, Flying Site Engineer/ Before &


Adequate Supervision, Implement permit
Preparation of surface or falling objects &
1 3 3 M to work system for activities such as 3 1 L Supervisor During The
debris, Defective tools,
equipment
confined space works & proper PPE Task

Mobilization of Site Engineer/ Before &


Unstable ground Adequate Supervision, Workers should be
2 Delivery of Epoxy 3 3 M 3 1 L
conditions aware of their health safety responsibilities Supervisor during Task
materials

Manual Handling, Safe stacking and storage of material/


Manual handling/ Site Engineer/ Before &
3 Slip, trips and falls 4 3 M Provide emergency contact detail/ 4 1 L
Storage of materials Supervisor During Task
inadequate access Adequate supervision
Prolong exposure or
inhaling of hazardous
odor emitting from
the applied chemical Provision of PPE to handle chemical/ Site Engineer/
Use of Chemical Skin & Eye contact MSDs/Safety data sheets, Proper sign, Supervisor Before &
4 4 4 H 4 1 L
Contact with naked Training of chemical handling materials, During the task
flame Proper supervision
Fire or Explosion/
Environmental
Hazardous `

Exposure to adverse TBT before start the task, Training of Site Engineer/ Before &
5 Epoxy Coating works 3 3 M 3 1 L
environmental chemical handling, Adequate supervision Supervisor During the task
conditions/
Unauthorized entry
Poor Housekeeping/
unsafe surface
House Keeping & conditions/ presence TBT, Provision of waste collection bags, Site Engineer/ Before &
6 3 3 M 3 1 L
Waste Management of sharp objects and weekly program to do housekeeping at site Supervisor During the task
toxic chemicals.
Immediate fire spread

Reviewed By:

Client: FABIANO DOS SANTOS ROCHA Signature: Date 07 / 09 / 2022

Project Manager: MOHAMMED SALIQ Signature: Date 07 / 09 / 2022