You are on page 1of 4

 

 CONSULTANT COMMENTS 

PROJECT TITLE  PROPOSED RESIDENTIAL BUILDING‐1B+G+4F 
DATE  DATE: OCTOBER 12, 2021

PIN N0.  PIN NO:  69040040

PLOT N0.   A‐13 

LOCATION  FOXHILLS DISTRICT LUSAIL

CLIENT  MR. AHMAD MOHD A. I. AL‐ASMAKH/                               
MR. MOHAMMED NASSER A.S. AL‐EMADI 

MAIN CONTRACTOR AL WEFAQ

CONSULTANT  ATAK ENGINEERING CONSULTANT
MECH’L CONSULTANT  ENG’R. EMERSON
ENG’R. 
DESCRIPTION  CONSULTANT SITE VISIT INSPECTION
INSPECTION NO.  01 
 

                      CONSULTANT  COMMENTS MAIN CON REPLY

FIRE FIGHTING SYSTEM 

a) Effective Fire Water Storage Tank labeling capacity is
not provided.(shall be clearly indicated on the tank wall 
in lettering a minimum height of 100 mm)                             

b) Diesel tank label capacity is not provided  

c) Fire pumps pressure setting label is not provided.  

d) Non provision of labels and directional arrows in   

 
 

piping at fire pumps room 

e) Fire sprinkler pipeline directional arrows are not   

provided @ Basement 

f) Fire pump room identification label is not provided.  

g) Siamese connection identification labels are not   
provided 
B.  Documents to be submit   

a) Hydrostatic test pressure report.   

b) Flushing test report.   

c) Fire Pumps test report.   

d)Shaft Alignment report.   

e)Submit the updated QCDD approved products  
certificate of all life safety products provided in the 
project. 
f) Submit the  QCDD approved FFS drawings.   

MECHANICAL VENTILATION   
 

A. Basement  Ventilation System  

a) Non provision of identification mark and arrows for   
basement ventilation duct  (EAD and SAD). 
b) Fresh air fan motor installed on the Ground for the   
basement floor fresh air supply facing the road, as per 
approved MV drawing reflected facing the right hand 
wall. 

 
 

c) Non provision of labels in exhaust and fresh  air supply   
equipment’s which are  installed in the ground floor 
B. Staircases Pressurization System   

a) Installed pressurization ducts are not provided with   
insulation and cladding @ Roof floor. 
b) Non provision of smoke duct detectors in the air   
supply to the pressurized stairwell as reflected in the 
QCDD approved stair pressurization system. 
c) Non provision of sand trap louver in pressurization   
duct as reflected in the QCDD approved  with drawing 
no. MV‐08‐ General Details‐2. 
C. Exhaust Duct System   

a) Installed exhaust duct is obstruction going to   
Emergency Generator.(Roof Floor) 
D. Documents to be submit   

a) Car park ventilation test reports.   

b) Tabulated test data for static pressure differential  
(SPD) per floor (Staircase pressurization). The SPD 
reading must be at 50 Pa when all doors are closed, 25 
Pa if one door is open, and 12.5 Pa for three doors open. 
c) Submit the  QCDD approved MV drawings.   

ELEVATOR/ LIFT   

a) Lifts shall be provided with safety instructions inside   
the cabin. 
b)” In case of Fire Do not Use Lift” in Arabic/English   

 
 

signage shall be provided on lift lobby. 
c) Lifts shall home to ground upon receipt of fire alarm.   
Homing on alternate floor shall be provided. 
d) Emergency Landing Device (ELD) shall be provided for   
each lift 
D. Documents to be submit   

a) Elevator testing report.   

b) Emergency landing device (ELD) reports.  

c) Sequence of operation.   