Sl. No Dept., Auidt Observation Corrective Action Date for NC closure Status Remarks
Tool & fixture list: Tool list available, Fixture list not
3 production Updation of fixture list is required. 21.09.2022 open
available
5 production Kaizen: Kaizen done but documentation not available documentation for Kaizen required 22.09.2022 open
INTERNAL AUDIT SUMMARY
Sl. No Dept., Auidt Observation Root Cause Corrective Action Status Remarks
QA and Incoming inspection report not evidenced for Actuator Missed for filling due to not shown All the report properly filling and
1 closed
Calibration bracket on time to auditor arranged for eazy to carried out
QA and Not available for before due date Will be pre plan for before 20 days for
2 Calibration not done for micrometer no-94358 closed
Calibration due to use inspection daily basis. not in use time
Production,
Missed for Skil matrix revise and
3 Maintenance Operators skill matrix not evidenced Provide and displayed Skil matrix closed
displayed
and Store