HSE PERFORMANCE Total Manpower ( POB ) Manpower Contractor

Day
Description Prev. Today Cumm. No. Company Sum No. Positon Night Shift Sum
Shift
Man Hours - 352 352 1 Medco 3 1 Project Manager 1 - 1
- 2 Site Manager MIM 1
Charterer (Medco) 24 24 2 Consortium 4
3 Site Manager - - -
4 Construction Manager
Consortium (Hanochem-Cakra-MTC) - 32 32 3 Navitas (Contractor) 37 1 - 1
5 Construction Supervisi (MIM) 1 - 1
Contractor (Navitas) - 296 296 3.1 Day Shift 37 6 Lead Engineering - - -
Vendor/Visitor/Class/Surveyor - - - 3.2 Night Shift - 7 Drafter -
8 Poject Control 1 - 1
4 Vendor/Class/Surveyor 0 9 Adm.Docon/ Secretary
1 - 1
Total POB 44 10 HSE Cordinator 1 - 1
11 Safety Man/Medic 1 - 1
12 Hse Coordinator (MIM) 1 - 1
13 QC Coordinator 1 - 1
14 QC Structure 1 - 1
15 QC Dimensional
16 QC. Surveyor
17 QC Structure (MIM) 1 - 1
18 Doc.control QC 1 - 1
19 Welder 7 - 7
20 Fitter 7 - 7
21 Rigger
22 Scaffolder
23 Electrical/Mechanical
24 Painter
25 Blaster
26 Helper 8 - 8
27 Material Control (MIM) 1 - 1
28 Store Man 1 - 1
Total 37 - 37