You are on page 1of 1

A1 A B C D E F G H I J K L M N

Notes
B
1. No dimensions shall be scaled. Work to
figured dimensions.
1 2. All discrepancies on this drawing shall be
brought to the Engineers attention prior to
implementation of any work.

230 3750 230 3750 230 520

Raised Trafficable Heavy Duty Raised Trafficable Heavy Duty


Manhole cover Manhole cover

Controlled backfill around excavated


MonitoringWell MonitoringWell
areas, backfill in 150mm layers using G5
material compacted to 95% Mod ASSHTO.
D Top 450mm to receive soilcrete as per
SATCC guideline

2 230mm Brick wall


Reinforced every 3 Courses and plastered
with Impermo or similar approved water
proofing agent

35 000Litre Tank 23 000Litre Tank


5
5 15 Well Compacted River Sand Laid
15 R1
R1 in 150mm Layers

MonitoringWell
Grade 30 Mpa Concrete with
S193 mesh reinforcement top and
3 bottom

35 000Litre Tank 35 000Litre Tank Section A-A


4 scale 1:50
10 000Litre Tank
A A C C
Tank size to be confirmed

230 3750 230 520

Raised Trafficable Heavy Duty


Manhole cover

Controlled backfill around excavated


areas, backfill in 150mm layers using G5
material compacted to 95% Mod ASSHTO.
Void Void Void Top 450mm to receive soilcrete as per
5 SATCC guideline

230mm Brick wall


Reinforced every 3 Courses and plastered
with Impermo or similar approved water
proofing agent

10 000Litre Tank
MonitoringWell MonitoringWell MonitoringWell 5
15 Well Compacted River Sand Laid
R1 in 150mm Layers

6 Grade 30 Mpa Concrete with


S193 mesh reinforcement top and
bottom

B D
AMENDMENT

Date Revision Description

Plan Layout (Diesel & Petrol Tanks) Plan Layout (Paraffin Tank) Section C-C
scale 1:50 scale 1:50 scale 1:50
7
P1 11/07/20 VTZ JIN JTM

scale 1:50 scale 1:50 Issue Date By Checked Approved

9200
12000 520 230 7700 230 520

520 230 10500 230 520 Raised Heavy Duty


Manhole cover

200
Raised Heavy Duty
Manhole cover Controlled backfill around excavated
Grade 30 Mpa Concrete with areas, backfill in 150mm layers using G5 42 Mc Chlery Avenue
200

S245 mesh top reinforcement Modular tank manhole as by material compacted to 95% Mod ASSHTO. Eastlea, Harare
Controlled backfill around excavated Petrotank Specifications Top 450mm to receive soilcrete as per Tel: +263 - 4 - 703 259
1700 Modular tank manhole as by areas, backfill in 150mm layers using G5 1700 Manhole SATCC guideline Web: www.uipafrica.com

175
Petrotank Specifications material compacted to 95% Mod ASSHTO.
Grade 30 Mpa Concrete with Top 450mm to receive soilcrete as per

330
S245 mesh top reinforcement Manhole SATCC guideline Client
175

230mm Brick wall


9 Reinforced every 3 Courses and plastered
with Impermo or similar approved water Energy Park
230mm Brick wall proofing agent
Reinforced every 3 Courses and plastered Tank installation and fittings by
with Impermo or similar approved water approved specialist
Tanks secured by strapping. Double Skin Fuel Tank
proofing agent
3510
4010

Minimum 3 strapping down points Tank installation and fittings by 1. Tank to be constructed in
, latched onto hooks cast in the approved specialist conformance with SABS
floor slab
3510

2840
1535:1991 Tanks secured by strapping.
4010

2310
2. Leak detector LAG-14ER or Minimum 3 strapping down points
2640

Double Skin Fuel Tank similar approved , latched onto hooks cast in the
2840

1. Tank to be constructed in floor slab Well Compacted River Sand Laid Job Title
in 150mm Layers
conformance with SABS
1535:1991
Well Compacted River Sand Laid
Proposed Chegutu Fuel Station
2. Leak detector LAG-14ER or
in 150mm Layers
similar approved
Hook. Bitumen painted after
Grade 30 Mpa Concrete with
securing strap
S193 mesh reinforcement top and
200

Hook. Bitumen painted after bottom

200
securing strap Grade 30 Mpa Concrete with
S193 mesh reinforcement top and
10
300
200

bottom
Drawing Title
300

Tank Farm Details

300mm selected fill material,


compacted to 95% mod AASHTO
300mm selected fill material, on well compacted subgrade
compacted to 95% mod AASHTO
on well compacted subgrade
Section D-D
Scale At A1:
As shown

Section B-B scale 1:50


Discipline:

Job Number
Civil
Drawing Status
11
scale 1:50 ADG/822 For Approval

Drawing Number Issue


C103 A1

Do not scale © AEDO DEVELOPMENT GROUP

You might also like