II Pekerjaan Carport
a Chipping keramik existing 0.62% 0.21% 0.21% 0.21%
b Bongkar rolling door existing 0.87% 0.44% 0.44%
c Balok sabuk 1.85% 0.46% 0.46% 0.46% 0.46%
d Keramik carport 9.37% 1.87% 1.87% 1.87% 1.87% 1.87%
e Pengecatan 6.95% 1.39% 1.39% 1.39% 1.39% 1.39%
f Plafon 9.66% 1.93% 1.93% 1.93% 1.93% 1.93%
g Pintu Henderson 24.65% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64% 1.64%
h Perapihan jalur kabel dan titik lampu 1.87% 0.62% 0.62% 0.62%
D
i Service area perapihan dinding dan cor yang kropos 1.87% 0.93% 0.93%
O
W
III Relokasi Warung
N
a Bobok tembok existing 1.37% 0.46% 0.46% 0.46%
b Balok sabuk 1.18% 0.24% 0.39% 0.39% 0.39% 0.39%
P
c kolom support 2.80% 0.56% 0.56% 0.56% 0.56% 0.56%
A
d Pasang rolling door 1.87% 0.93% 0.93%
Y
e Pengecatan 1.12% 0.37% 0.37% 0.37%
M
f Service area 1.87% 0.62% 0.62% 0.62%
E
N
IV Pintu Utama
T
a Pembongkaran pintu existing 1.37% 0.46% 0.46% 0.46%
b kusen alumunium + pintu 8.71% 2.18% 2.18% 2.18% 2.18%
c jendela alumunium 5.23% 1.31% 1.31% 1.31% 1.31%
d Balok sabuk 1.68% 0.42% 0.42% 0.42% 0.42%
e kolom praktis 2.80% 0.70% 0.70% 0.70% 0.70%
f Pengecatan 1.12% 0.22% 0.22% 0.22% 0.22% 0.22%
V TERAS
a plafon 6.53% 1.63% 1.63% 1.63% 1.63%
b titik lampu 0.93% 0.23% 0.23% 0.23% 0.23%