Professional Documents
Culture Documents
Department of Education
Region XI
SCHOOLS DIVISION OF PANABO CITY
DIVISION MEMORANDUM
SGOD-2022-0129
Travel and other incidental expenses incurred in the conduct of the activity by
the Division DRRM Coordinator shall be charged to Downloaded DRRM and Division
MOOE funds, whichever is available, subject to the usual accounting and auditing
rules and regulations.
This school level Comprehensive School Safety Monitoring Tool is aligned with the Sendai Framework for
DRR (SFDRR) and the global Comprehensive School Safety Framework (CSSF) developed by the UN
International Strategy for Disaster Reduction (UNISDR). As a signatory to the SFDRR, the Philippine
Government is expected to report to the UNISDR its accomplishment in implementing the SFDRR. In line
with this, the Department of Education is required to report its accomplishment in implementing Disaster
Risk Reduction and Management (DRRM)/School Safety to the National DRRM Council (NDRRMC) as a
member of the said council, and in accordance to RA 10121 (Philippine DRRM Act of 2010) which reflects
the country's commitment to the SFDRR.
This school level Comprehensive School Safety Monitoring Tool aims to:
1) Establish the baseline with respect to the implementation of the 3 pillars of DepEd's Comprehensive
DRRM in Education Framework (DO 37, s 2015);
2) Set the school's DRRM targets for 3 years, based on the baseline;
3) Track the annual progress of the school with respect to its targets.
The 1st column indicates the particular Priority for Action in the SFDRR that are related to the Targets of the
global CSSF in the 2nd column. The 3rd column indicates DepEd's Comprehensive School Safety indicators
at the school level that are related to columns 1 and 2. The school level DepEd indicators are based on the
Department's Disaster Risk Reduction and Management (DRRM) policies and the School DRRM Manual
(SDRRM).
NAME OF
SCHOOL ID:
SCHOOL:
DIVISION: PANABO CITY DISTRICT:
NAME OF
DATE
SCHOL HEAD:
ENABLING ENVIRONMENT
Related
Global DepEd DRRMS CSS
Sendai
Comprehensive INDICATORS
Framework (Based on DepEd’s DRRM EXISITING REMARKS
School Safety
for DRR Policies and School DRRM
(CSS) TARGET
(SFDRR) Manual)
AREAS
Priorities
YES NO
Adopted/Adapted/localized
Legal
Priority for existing policies relating to
Frameworks & 1
Action 2 DRRM in education/school
Policies
safety
Organizational Designated School DRRM Focal
Priority for 2
arrangements, Person
Action 2
leadership, and 3 Formed School DRRM Team
Related
Global
Sendai
Comprehensive DepEd DRRMS CSS INDICATORS
Framework EXISTING REMARKS
School Safety (Based on DepEd’s DRRM Policies
for DRR
(CSS) TARGET and School DRRM Manual)
(SFDRR)
AREAS
Priorities
Existing schools are being made safer, systematically NO.
Number of school buildings that
1
Assessment and has been inventoried
prioritization for Number of school buildings with
Priority for 2
retrofitting and risk assessment
Action 1
replacement of Number of unsafe school
unsafe schools 3 buildings identified
YES NO
Systems for monitoring and quality
4 assurance of school building
construction exist
Financial resources are allocated
Resources and for completion of needed action to
5
Priority for Plan to address address unsafe school buildings
Action 3 unsafe school within a specified period
buildings Number of unsafe school
buildings with appropriate action
6 undertaken by the School Head
(e.g. upgraded, retrofitted, non-
usage, etc.)
Priority for Maintenance to Conducted regular school
Action 3 increase safety inspection and maintenance of
7
and protection facilities conducted (state how
of investments often)
in schools 8 Undertaken regular repair of minor
Related
Global DepEd DRRMS CSS
Sendai
Comprehensive INDICATORS
Framework (Based on DepEd’s DRRM EXISTING REMARKS
School Safety
for DRR Policies and School DRRM
(CSS) TARGET
(SFDRR) Manual)
AREAS
Priorities
YES NO
School has a Contingency Plan,
i.e. Preparedness Plan turned
into response actions when
1
disaster strikes (This could be a
separate section/ chapter in the
DRRM Plan)
School has available, accessible,
2 and adequate first aid kit in every
instructional classroom
School has at least 2 necessary
and functioning equipment in
Existence of
3 case of a disaster (e.g. fire
national and
extinguisher, handheld/base
sub-national
radio, generator, etc.)
plans for
School has pre-identified spaces
preparedness
Priority for for putting up Temporary
and response, 4
Action 2 Learning Spaces/Shelters in the
educational
aftermath of a disaster
continuity, and
School has ready resumption
protection of
strategies and alternative
education sector 5
delivery modes to ensure
investments
education continuity
School has ensured that
students completed the Family
Earthquake Preparedness Plan;
6
and school has reported
completion to DepEd DRRM at
the Central Office
School has established a school
personnel tracking
7
system/protocol in the event of a
disaster
8 School has trained personnel to
administer first aid to students
and personnel
Related
Global DepEd DRRMS CSS
Sendai
Comprehensive INDICATORS
Framework (Based on DepEd’s DRRM EXISTING REMARKS
School Safety
for DRR Policies and School DRRM
(CSS) TARGET
(SFDRR) Manual)
AREAS
Priorities
YES NO
School has integrated key DRR
and CCA concepts in the
1
curriculum based on the National
Curriculum Guide
Integration of Year when the DRR and CCA
common risk 2 integration in the curriculum
Priority for reduction and started
Action 3 resilience Grade levels and subjects
messages in the 3 where DRR and CCA been
curriculum integrated
Skills and competencies of
students are assessed through
measurable learning and risk
reduction (RR) outcomes
Integration of Percentage of students actively
risk reduction participating in various
Priority for
and resilience in 4 DRRM/CCA/EiE activities
Action 3
extra-curricular
activities
Priority for Capacity School has a DRRM capacity
Action 3 building for 5 building plan for teachers and
personnel on school personnel
risk reduction 6 Number of personnel trained on
and resilience DRRM and/or CCA
education
School has available and
7 accessible quality and up-to-date
DRRM materials
Presence of DRRM corner with
8 updated IEC materials posted in
it, in every classroom
School carries out monitoring
Priority for Monitoring and
9 and evaluation to assess
Action 3 Evaluation
sustainable implementation
EVALUATOR CONFORMED
SIGNATURE: SIGNATURE:
NAME: NAME:
POSITION: POSITION:
DATE: DATE:
San Roque ES
October 26, 2022
Katualan ES
Waterfall ES
Kauswagan NHS October 27, 2022
Teofanis G. Gerona ES
Consolacion ES
Malativas ES October 28, 2022
Malativas NHS
Rodrigo D. Mabitad ES
Valentin Daquio ES November 2, 2022
Manay NHS
Dalisay Village ES
November 3, 2022
Desiderio Dalisay Sr NHS
A.O. Floirendo ES
November 8, 2022
A.O. Floirendo NHS
Sindaton ES
Sindaton NHS November 9, 2022
Roxas ES
Concordia A. Sison ES
P. Changco ES November 10, 2022
Tibungol ES