You are on page 1of 1

LENGTH OF

VEHICLE TYPE PRICES


QUANTITY OF CEMENT,SAND AND GRAVEL FOR SLAB AND WALL PER METER AREA MAIN BARS DIAMETER
MOTORCYCLE 80 THICKNESS 40 KG CEMENT SAND GRAVEL 5 8
MULTICAB 300 CM A B C CU. M. CU. M. 6 10
BONGGO 500 5 0.45 0.375 0.3 0.025 0.05 7.5 12
ISUZU ELF 1000 7.5 0.675 0.563 0.45 0.0375 0.075 9 13
8-WHEELER 3000 10 0.9 0.75 0.6 0.05 0.1 10.5 16
10-WHEELER 5000 12.5 1.125 0.938 0.75 0.063 0.125 12 20
TOYOTA HILUX 1200 15 1.35 1.125 0.9 0.075 0.15 13.5 25
NONE 17.5 1.575 1.313 1.05 0.088 0.175 28
CEMENT IN BAG SAND GRAVEL 20 1.8 1.5 1.2 0.1 0.2 30
MIXTURE CLASS PROPORTION
40KG 50KG CU. M. CU. M. 22.5 2.03 1.688 1.35 0.1125 0.225 32
AA 1: 1 1/2 : 3 RATIO 12.00 9.54 0.50 1.00 25 2.25 1.875 1.5 0.125 0.25 36
A 1 : 2 : 4 RATIO 9.00 7.00 0.50 1.00 27.5 2.475 2.063 1.65 0.138 0.275
B 1 : 2 1/2 : 5 RATIO 7.50 6.00 0.50 1.00 30 2.7 2.25 1.8 0.15 0.3
C 1 : 3 : 6 RATIO 6.00 5.00 0.50 1.00
LENGTH OF REINFORCING BARS FOR CHB IN METERS NEEDED TIE WIRES
PETROL VERTICAL HORIZONTAL VERTICAL SPA.
HORIZONTAL LAYER KG PER TIE
SPACING
GASOLINE 77 SPACING SPACING LAYER 25 30 40
PER BLOCK PER BLOCK
DIESEL 90 CM. 40 2 0.054 0.065 0.066
40 0.235 2 0.264 40 3 0.039 0.047 0.063
TYPE OF MATERIAL FOR FORMWORKS 60 0.171 3 0.172 40 4 0.024 0.029 0.039
FOR FORMS 80 0.128 4 0.138 60 2 0.036 0.044 0.057
SHAPE: RECTANGULAR CIRCULAR 60 3 0.026 0.032 0.042
FRAMEWORK CONTINUOUS RIB
STUD
TYPETYPE LENGTH OF TIES 60 4 0.02 0.024 0.032
TYPE OF MATERIAL PLYWOOD 0.3 0.4 80 2 0.027 0.033 0.044
80 3 0.02 0.024 0.032
POST POST BEAM BEAM 80 4 0.015 0.018 0.024
SIZE OIF WOOD FRAME 6 MM 12 MM 6 MM 12 MM
2" X 2" 29.67 20.33 25.06 18.66 ONE WAY TWO WAY
2" X 3" 44.5 30.5 37.6 28 ONE WAY TWO WAY
BAR SPACING (CM) 6 7.5 9 12 BAR SPACING (CM) 6 7.5 9 12
QUANTITY OF LUMBER FOR SCAFFOLDING OR STAGING 10 3.764 2.937 2.421 1.769 10 4.369 3.337 2.772 2.022
LUMBER COLUMN BEAM FLOORING 12.5 3.062 2.381 1.934 1.427 12.5 3.603 2.662 2.245 1.635
BRD. FT. PER BRD. FT. PER M. BRD. FT. PER SQ.
SIZE M. HT. HT. M 15 2.584 2.004 1.636 1.197 15 3.221 2.296 1.921 1.382

VERTICAL HOR. BRACE VERTICAL HORIZONTAL 17.5 2.232 1.726 1.407 1.033 17.5 2.647 2.025 1.65 1.196
2" X 2" 4.7 21 11.7 4 4.7 6.1 20 1.98 1.528 1.258 0.914 20 2.36 1.775 1.461 1.056
2" X 3" 7 31.67 17.5 6 7 9.1 22.5 1.786 1.369 1.109 0.61 22.5 2.168 1.601 1.312 0.907
2" X 4" 9.35 42.25 23.35 8 9.35 12.1 25 1.627 1.25 1.014 0.736 25 1.997 1.466 1.217 0.862
ONE WAY TWO WAY
FOR MORTAR A B C D SAND CU. M. 6 7.5 9 12 BAR SPACING 6 7.5 9 12
BAR SPACING (CM)
10X20X40 0.792 0.522 0.394 0.328 0.435 0.3 0.4 0.3 0.4 0.3 0.4 0.3 0.4 (CM) 0.3 0.4 0.3 0.4 0.3 0.4 0.3 0.4
10 0.474 0.632 0.462 0.616 0.46 0.614 0.448 0.598 10 0.592 0.896 0.648 0.863 0.648 0.0864 0.596 0.794
FOR PLASTER
CEMENT IN BAGS THICHNESS OF PLASTER 12.5 0.316 0.422 0.307 0.409 0.295 0.394 0.293 0.391 12.5 0.416 0.554 0.42 0.56 0.431 0.574 0.421 0.561
CLASS 8MM 12MM 16MM 20MM 25MM 15 0.228 0.303 0.217 0.289 0.214 0.285 0.207 0.276 15 0.35 0.466 0.307 0.409 0.257 0.343 0.297 0.396
A 0.144 0.216 0.288 0.36 0.45 17.5 0.168 0.224 0.162 0.216 0.158 0.21 0.153 0.204 17.5 0.247 0.33 0.231 0.308 0.223 0.298 0.206 0.275
B 0.096 0.144 0.192 0.24 0.3 20 0.132 0.175 0.126 0.168 0.125 0.167 0.12 0.16 20 0.174 0.232 0.171 0.227 0.173 0.231 0.163 0.217
C 0.072 0.108 0.144 0.18 0.225 22.5 0.11 0.147 0.102 0.135 0.099 0.132 0.095 0.126 22.5 0.168 0.224 0.15 0.2 0.148 0.198 0.13 0.173
D 0.06 0.09 0.12 0.15 0.188 25 0.089 0.118 0.086 0.114 0.081 0.108 0.077 0.103 25 0.142 0.189 0.134 0.178 0.114 0.152 0.116 0.155
SAND 0.008 0.012 0.016 0.02 0.025