AS PER BOQ REFERENCE
Line item Description RA 01 Qty Amnt RA 01 RA 02 qty Amnt of RA 02 RA 03 qty Amnt of RA 03 RA 04 Amnt of RA 04 RA 05 Amnt of RA 05 RA 06 Amnt of RA 06 RA 07 Amnt of RA 07 RA 08 Amnt of RA 08 RA 09 Amnt of RA 09 RA 10 Amnt of RA 10 RA 11
UOM QTY Rate Amnt
10 CLEARING AND GRUBBING ROAD M2 15648.00 5.20 81,369.60 4800 24960.00 0 0 1100 5720 0 0 3000 15600 0 0 6748 35089.6 0.00 0 0 0 0
20 EXCAVATION M3 16560.80 49.5 819,759.60 472.5 23388.75 808.5 40020.75 110.25 5457.375 0.00 0 1,441.00 71329.5 0 0 2954.8 146262.6 0.00 0 1778.4 88030.80 1275.48 63136.26 0
30 LOOSENING THE GROUND SUB GRADE M2 26080.00 29.5 769,360.00 5950 175525.00 2200 64900 300 8850 2,200.00 64900 4,000.00 118000 0 0 2200 64900 0.00 0 2900 85550.00 5400.00 159300.00 910
40 SOIL COMAPCTION M3 3341.50 58 193,807.00 717.5 41615.00 95.7 5550.6 8.7 504.6 0.00 0 0.00 0 0 0 0 0.00 0 225 13050.00 390.00 22620.00
50 GSB M3 5175.25 1,700.00 8,797,925.00 1312.5 2231250.00 412.5 701250 56.25 95625 375 637500 750 1275000 0 0 412.5 701250 0.00 0 318.75 541875.00 1125.00 1912500.00 407.5
60 WMM M3 5705.00 1,750.00 9,983,750.00 0.00 656.25 1148437.5 468.75 820312.5 187.5 328125 0 0 375 656250 1068.75 1870312.5 768.75 1345312.5 459.375 803906.25 1125.00 1968750.00 461.875
70 PRIME COAT SS-1 M2 22820.00 21.50 490,630.00 0.00 0 0 0 0 0 0 0 0 0 0 10807.50 232361.25 0 0.00 0.00 0.00 7802.5
80 TRACK COAT RS-1 M2 22820.00 11.00 251,020.00 0.00 0 0 0 0 0 0 0 0 0 0 10807.50 118882.5 0 0.00 0.00 0.00 7802.5
90 VG 30 BITUMINOUS MACADAM M3 1177.40 7589 8,935,288.60 0.00 0 0 0 0 0 0 0 0 0 0 540.38 4100905.875 0 0.00 0.00 0.00 390.125
100 VG 30 BITUMINOUS CONCRETE M3 702.80 7995 5,618,886.00 0.00 0 0 0 0 0 0 0 0 0 0 432.30 3456238.5 0 0.00 0.00 0.00 312.1
110 PRECAST CEMENT LAYING RM 0.00 - 0.00 0 0 0 0 0 0 0 0 0 0 0.00 0 0 0.00 0.00 0.00 0
120 SIGNAGE BOARD NO 7.00 6,000.00 42,000.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0
ESTIMATED JOB VALUE AS PER BOQ REFERANCE APPROX. 35,983,795.80 2496738.75 1960158.85 936469.48 1030525 1479929.5 656250 2817814.70 9253700.63 1532412.05 4126306.26

GST 449,412.98 352,828.59 168,564.51 - 185,494.50 - 266,387.31 118125 507206.65 1665666.11 275834.17 742735.13
Total 2,946,151.73 2,312,987.44 1,105,033.98 - 1,216,019.50 - 1,746,316.81 774375 3325021.35 10919366.74 1808246.22 4869041.39

Total
Balance
UTOCLAVERS & CO.
RNAL CTR JOB ABSTRUCT
Amnt of RA 11
0
0
26845
0
692750
808281.25
167753.75
85827.5
2960658.625
2495239.5
0
0
7237355.625

1302724.0125
8540079.6375

33527660.84
2456134.97
JP AUTOCLAVERS & CO.
PO No: 6100087249, DATED: 06.01.2021
JOINT MEASUREMENT SHEET
SITE: TOMPL INTERNAL ROAD JOB (CTR)
BILL NO: RA 11

LINE DESCRIPTION (AS PER SIGNED


ITEM COPY OF JMR) UNIT NO. LENGTH BREADTH HEIGHT TOTAL QTY

SQM 1 260 3.5 910.000


30 Loosing of Subgrade & preparation
for MFA ROAD of 260 RM
Total 910.000

GSB 1st layer for MFA ROAD CUM 1 260 3.5 0.125 113.750
GSB 2nd layer for MFA ROAD CUM 1 200 3.5 0.125 87.500
50 GSB BOTH LAYER FOR ADDITIONAL
CUM 1 110 7.5 0.25 206.250
110 RM TARPULIN ROAD

Total 407.500

WMM 1st layer for additional 110 CUM 1 110 7.5 0.125 103.125
RM TARPULIN ROAD
WMM 2nd layer for additional 110
CUM 1 110 7.5 0.125 103.125
RM TARPULIN ROAD
60
WMM for MFA Road for 02 layers CUM 1 260 3.5 0.25 227.500

WMM correction layer form CH 00


to CH 50, RHS CUM 1 50 7.5 0.075 28.125

Total 461.875

Prime Coat from CH 880 to 1200,


(As per site JMR done) SQM 1 320 7.5 2400.000

Prime Coat from CH 1280 to 1560, SQM 1 280 7.5 2100.000


LHS (As per site JMR done)
Prime coat for additional 260 RM
SQM 1 260 3.5 910.000
70 MFA Road
Prime Coat from CH 00 to CH 83,
RHS SQM 1 83 7.5 622.500

Prime Coat from CH 50 to CH 286,


SQM 1 236 7.5 1770.000
LHS
Total 7802.500

Tack Coat from CH 880 to 1200,


SQM 1 320 7.5 2400.000
RHS (As per site JMR done)
Tack Coat from CH 1280 to 1560,
LHS (As per site JMR done) SQM 1 280 7.5 2100.000

Tack Coat for additional 260 RM SQM 1 260 3.5 910.000


80 for MFA Road
Tack Coat from CH 00 to CH 83,
SQM 1 83 7.5 622.500
RHS
Tack Coat from CH 50 to CH 286,
LHS SQM 1 236 7.5 1770.000

Total 7802.500

BM from CH 880 to 1200, RHS (As CUM 1 320 7.5 0.05 120.000
per site JMR done)
BM from CH 1280 to 1560, LHS (As
CUM 1 280 7.5 0.05 105.000
per site JMR done)
90 BM for additional 260 RM for MFA
Road CUM 1 260 3.5 0.05 45.500
BM from Ch 00 to Ch 83, RHS CUM 1 83 7.5 0.05 31.125
BM from CH 50 to Ch 286, LHS CUM 1 236 7.5 0.05 88.500
Total 390.125
JP AUTOCLAVERS & CO.
PO No: 6100087249, DATED: 06.01.2021
JOINT MEASUREMENT SHEET
SITE: TOMPL INTERNAL ROAD JOB (CTR)
BILL NO: RA 11
BC from CH 880 to 1200, RHS (As
CUM 1 320 7.5 0.04 96.000
per site JMR done)
BC from CH 1280 to 1560, LHS (As
per site JMR done) CUM 1 280 7.5 0.04 84.000
100 BC for additional 260 RM for MFA
CUM 1 260 3.5 0.04 36.400
Road
BM from Ch 00 to Ch 83, RHS CUM 1 83 7.5 0.04 24.900
BM from CH 50 to Ch 286, LHS CUM 1 236 7.5 0.04 70.800
Total 312.100