PT.

PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start

ELECTRICAL SYSTEM
1 DC Supply Power System
Visual Inspection July 1, 2012
Battery Test July 2, 2012
Battery Charger Test July 8, 2012
2 AC Supply Power (MV/LV) System
Visual Inspection June 10, 2012
Station MV Switchgear Test June 18, 2012
Station LV Switchgear Test July 1, 2012
3 Emergency Power System
Visual Inspection June 10, 2012
Diesel Generator Set Test February 10, 2012
Uninteruptible Power Supply Test July 1, 2012
4 Substation System
Visual Inspection June 10, 2012
Circuit Breaker Test June 15, 2012
Current Transformer Test July 17, 2012
Potential Transformer Test July 13, 2012
Arrester Test July 3, 2012
Disconnecting Switch Test June 6, 2012
Relays Protection Test
Network Control System/Distribute Control System Test June 6, 2012
Protection & Interlock Test June 8, 2012
Intertripping Test June 8, 2012
Differential Current Stability Check August 2, 2012
5 Transformer System
Station Service Transformers June 16, 2012
Main Transformer September 5, 2012
Auxiliary Transformers February 23, 2013
MV Transformers Test June 10, 2012
LV Transformers Test July 1, 2012
Town Feeder Transformer Test June 15, 2012
6 Generator & Auxiliaries System
Visual Inspection September 20, 2012
Generator individual test September 23, 2012
Excitation Test November 22, 2012
CT/PT/LA Test December 9, 2012
Excitation Transformer Test February 12, 2013
Synchronizing system test March 18, 2013
Generator No Load Characteristic Test March 19, 2013
NGR test February 28, 2013
Busduct Test

BALANCE OF PLANT & ACCESSORIES


1 Fire Fighting System
Visual Inspection September 22, 2012
Motors and Pumps Test September 17, 2012
Protection & Interlock Test March 10, 2013
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start
Fire Water System Commissioning Test March 12, 2013
CO2 System Commissioning Test March 12, 2013
Foam System Commissioning Test March 12, 2013
Heat, Smoke and Fire Detection System Test March 12, 2013
Hydrant, Sprayer and Deluge System Test March 12, 2013
Portable Fire Fighting Equipments March 12, 2013
Operation and Functional Test (All Area) March 12, 2013
2 Water Treatment System
Visual Inspection September 20, 2012
Individual Motor and Pump September 25, 2012
Sea Water Pre Treatment System October 8, 2012
Desalination Plant Test October 12, 2012
Demineralize Water System Test October 16, 2012
Make Up water Treatment Plant Test November 3, 2012
Industrial Water System Test November 5, 2012
Capacity and Quality Test September 4, 2013
3 Waste Water Treatment System
Visual Inspection October 1, 2012
Equipments Running Test October 5, 2012
Waste Water Treatment System Test November 1, 2012
Capacity and Quality Test September 4, 2013
4 Fuel Oil System
Visual Inspection October 7, 2012
Motors and Pumps Test October 10, 2012
Fuel Oil Receiving System Test October 20, 2012
Fuel Oil Forwarding System Test October 20, 2012
Fuel Oil Unloading System Test October 20, 2012
Fuel Oil Circulating Test March 10, 2013
5 Air Compressor System
Visual Inspection October 3, 2012
Motors and Compressor Test October 10, 2012
Air Compressor System Test November 2, 2012
6 Coal Handling System
Visual Inspection November 25, 2012
Coal Transfers and Conveyors System Test November 29, 2012
Bridge Grab Ship Unloader System Test January 8, 2013
Bucket Wheel Stacker Reclaimer System Test January 20, 2013
Capacity Test September 3, 2013
7 Fly Ash and Bottom Ash Handling System
Visual Inspection December 1, 2012
Fly Ash Individual Test December 5, 2012
Fly Ash Handling System Operation Test February 26, 2013
Bottom Ash Handling Individual Test November 23, 2012
Bottom Ash Handling System Operation Test March 2, 2013
Capacity Test August 28, 2013
8 Hydrogen Plant System
Visual Inspection November 30, 2012
Hydrogen Plant Individual Test December 5, 2012
Hydrogen Plant System Test January 3, 2013
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start
Capacity and Quality Test September 1, 2013
9 Sodium Hypochlorite Plant System
Visual Inspection October 26, 2012
Sodium Hypochlorite Plant Individual Test October 28, 2012
Sodium Hypochlorite Plant System Test November 7, 2012
Capacity and Quality Test August 27, 2013
10 Lime Stone and Sand System
Transporter/Conveyor -
11 Ventilation and Air Conditioning System
Visual Inspection September 9, 2012
Individual Test September 11, 2012
Ventilation and Air System Test February 8, 2013
Capacity and Quality Test August 24, 2013
DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION
1 Visual Inspection June 12, 2012
2 Instrumentation Calibration March 8, 2012
3 Power Receiving of DCS and Redundancy Power Test June 20, 2012
4 I/O and Control Loops System and Redundancy Test September 13, 2012
5 Turbine Supervisory and Emergency Trip System (TSI & ETS) Test March 25, 2013
6 Furnace Safety Supervisory System (FSSS) Test March 3, 2013
7 Data Aquisition System (DAS) Test December 7, 2012
8 Sequence Of Events System (SOE) Test February 12, 2013
9 Turbine Interlock and Protection System (ETS) Test March 12, 2013
10 Boiler Interlock and Protection System (FSSS, MFT & OFT) Test March 3, 2013
11 Modulating Control System (MCS) Test April 1, 2013
12 Sequence Control System (SCS) Test March 25, 2013
13 Digital Electro-Hydraulic Control System for Turbine (DEHC) Test March 10, 2013
14 Digital Electro-Hydraulic Control System for BFP-T (MEH) Test March 10, 2013
15 BFP- Turbine Driven Supervisory & Protection (MTSI & METS) Test March 1, 2013
16 Boiler Furnace Management System (BMS) Test March 2, 2013
17 Bypass Control System (BPS) Test March 15, 2013
18 Coordinate Control System (CCS) Test April 5, 2013
19 Governor Free and Automatic Governor Control System (AGS) Test May 12, 2013
20 Contineous Emission Flue Gas Monitoring System (CEMS) Test April 23, 2013
BOILER, TURBINE & AUXILIARIES
1 Make Up Water System
Visual Inspection October 9, 2012
Make Up Water Pump H/R Test October 12, 2012
2 Closed Cooling Water System
Visual Inspection October 12, 2012
CCCW Make Up Water Pump H/R Test October 13, 2012
CCCW Pump H/R Test October 18, 2012
CCCW Booster Pump H/R Test October 22, 2012
3 Circulating Water System
Visual Inspection September 25, 2012
Rotary Screen System Operation Test October 1, 2012
Circulating Water Pump H/R Test September 26, 2012
Sea Water Booster Pump H/R Test October 17, 2012
Condenser Tube Cleaning System Operation Test October 21, 2012
4 Condensate Water System
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start
Visual Inspection January 10, 2013
Condensate Pump H/R Test January 15, 2013
Condensate Polishing System Test January 29, 2013
Deaerator System Test March 18, 2013
5 Feed Water System
Visual Inspection February 25, 2013
BFP Aux Oil Pump H/R Test February 26, 2013
BFP H/R Test March 1, 2013
BFP-T H/R Test March 3, 2013
6 Condenser Air Evacuation System
Visual Inspection
Vacuum Pump H/R Test October 20, 2012
Vacuum System Operation Test February 12, 2013
7 Turbine Gland Steam Seal System
Visual Inspection November 23, 2012
Gland Steam Exhauster H/R Test February 25, 2013
8 Turbine Extraction and Drain System
Visual Inspection November 23, 2012
Valve Operation Test November 26, 2012
Heater Functional Test February 19, 2013
Drain Functional Test February 19, 2013
9 Turbine Control/Lubricating Oil System
Visual Inspection February 1, 2013
Emergency Oil Pump Running Test February 10, 2013
EHC Oil Pump H/R Test February 12, 2013
Turbine Barring and Turning Gear Test February 23, 2013
Turbine Jacking System Test February 25, 2013
10 Main Turbine
Visual Inspection February 25, 2013
Turbine Protection & Interlock Test March 3, 2013
Turbine Valves Test February 28, 2013
Turbine Vacuum Up Test March 19, 2013
Turbine No Load Test March 19, 2013
Turbine Load Test March 20, 2013
11 Turbine Supervision Instrument System
Visual Inspection March 17, 2013
I & C Loop Test March 18, 2013
12 Vibration Monitoring System
Visual Inspection March 3, 2013
Operation Function Test March 19, 2013
13 Generator Seal Oil System
Visual Inspection October 30, 2012
Emergency Seal oil Pump H/R Test November 4, 2012
H2 Gas Charging to Generator March 19, 2013
14 Generator Stator Cooling System
Visual Inspection October 20, 2012
Stator Cooling water Pump H/R Test November 2, 2012
15 Chemical Dosing System Commissioning
Visual Inspection December 3, 2012
Function & Operating Test February 12, 2013
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start
16 Chemical Feeding System Commissioning
Visual Inspection December 3, 2012
Function & Operating Test March 15, 2013
17 Sampling & Analysis System Commissioning
Visual Inspection October 23, 2012
Function & Operating Test March 11, 2013
18 Burner Front Oil System Operation Test
Visual Inspection February 24, 2013
Function & Operating Test March 5, 2013
19 Oil Lighter System Commissioning
Visual Inspection February 24, 2013
Function & Operating Test March 5, 2013
20 Atomizing Steam System Commissioning
Visual Inspection -
Function & Operating Test -
21 Flame Scanner Air System Commissioning
Visual Inspection October 12, 2012
Function & Operating Test March 8, 2013
22 Boiler Vents & Drain System Commissioning
Visual Inspection October 23, 2012
Function & Operating Test January 25, 2013
23 Boiler Seal Air System Commissioning
Visual Inspection October 13, 2012
Function & Operating Test February 27, 2013
25 Soot Blowing System Commissioning
Visual Inspection October 13, 2012
Function & Operating Test March 1, 2013
26 Auxiliary Steam System Commissioning
Visual Inspection September 15, 2012
Auxiliary Boiler Test September 21, 2012
Function & Operating Test December 1, 2012
27 Air Heater System Commissioning
Visual Inspection October 13, 2012
Air Heater Test October 15, 2012
Function & Operating Test March 1, 2013
28 Air-Flue Gas System
Visual Inspection October 10, 2012
Function & Operating Test March 1, 2013
Forced Draft Fan Test October 15, 2012
Induce Draft Fan Test October 18, 2012
Primary Air Fan Test October 25, 2012
Seal Air Fan Test October 30, 2012
Continous Emission Monitoring System Test August 1, 2013
29 Electrosatic Precipitator Commissioning
Visual Inspection November 25, 2012
Operation Function Test October 1, 2012
Efficiency Test September 3, 2013
30 Coal Feeder & Pulverizer System
Visual Inspection October 8, 2012
Pulverizer / Mills System Test October 15, 2012
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start
Coal Feeder System Test October 15, 2012
Pyrites Removal System Test February 25, 2013
Operation Function Test March 1, 2013
31 Refractory Drying Out
Visual Inspection
Refractory Drying Out proses
32 Chain Grate
Operation Function Test
SYSTEM AND PLANTS TEST
1 Boiler Hydrostatic Test April 30, 2012
2 Pre-Boiler Chemical Cleaning System November 8, 2012
3 Boiler Chemical Cleaning System November 15, 2012
4 Boiler Safety Devices & Interlock Test
5 Turbine Safety Devices & Interlock Test
6 Generator Safety Devices & Interlock Test
7 Boiler Initial Firing March 12, 2013
8 Boiler Steam Blows March 12, 2013
9 Boiler Safety Valve Test March 19, 2013
10 BTG Interlock Test March 12, 2013
11 Initial Steam Admission to Turbine March 19, 2013
12 Turbine Over Speed Test March 20, 2013
13 Full Speed No Load Test (Governor/AVR Dynamic Test, etc) March 19, 2013
14 Generator Open Circuit Test March 19, 2013
15 Generator Short Circuit Test March 19, 2013
16 Synchronization System Test March 20, 2013
17 First Synchronization & Initial Load Test March 20, 2013
18 Cold, Warm & Hot Start Up Test June 19, 2013
19 Vacuum Tightness Test July 12, 2013
20 Variation Load Test & Tunning July 21, 2013
21 Load Ramp, Load Swing & Run Back Test, etc July 4, 2013
22 Half Condenser and One CWP Operation Test July 10, 2013
23 Load rejection Test and House Load Test July 10, 2013
24 Reliability Run Test (168 hours) August 7, 2013
25 Plant Performance Test August 17, 2013
- Boiler Efficiency Test
- Generator Net Power Output
- Net Plant Heat Rate
- Auxiliary Power Consumption
- ESP Efficiency Test
- Maximum Load (Valve Wide Open) Test
- Minimum Load (Without Fuel Oil Support) Test
- Net Depandeble Capacity Test (NDC)
- HP Heater Cut Operation Test
26 Environmental Measurement September 3, 2013
- Flue Gas Emission Measurement
- Water Disposal Measurement
- Noise Level Measurement
27 SLO ( Sertifikat Laik Operasi ) September 10, 2013
28 COD (Commercial Operation Date) September 11, 2013
29 TOC (Taking Over Certificate) December 11, 2013
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITO


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNI

Rencana
No. Description
Start
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish

75%
July 2, 2012 August 3, 2012 August 6, 2013
July 8, 2012 August 4, 2012 August 14, 2012
July 11, 2012 August 10, 2012 August 14, 2012
20%
June 15, 2012 September 3, 2012 September 4, 2012
June 30, 2012 September 5, 2012 -
July 31, 2012
10%
June 15, 2012
February 18, 2012
July 8, 2012 September 1, 2012

June 14, 2012


June 19, 2012
July 19, 2012
July 16, 2012
July 20, 2012
June 15, 2012

June 20, 2012


July 11, 2012
July 20, 2012
August 4, 2012

June 19, 2012


March 20, 2013
April 20, 2013
June 30, 2012
July 31, 2012
June 18, 2012

September 21, 2012


September 29, 2012
November 28, 2012
December 19, 2012
February 15, 2013
March 18, 2013
March 19, 2013
March 1, 2013

September 24, 2012


September 27, 2012
March 11, 2013
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish
July 23, 2013
July 23, 2013
July 23, 2013
July 23, 2013
July 23, 2013
July 23, 2013
July 23, 2013

September 25, 2012


October 20, 2012
October 20, 2012
October 28, 2012
November 3, 2012
November 16, 2012
November 14, 2012
September 5, 2013

October 4, 2012
October 15, 2012
November 15, 2012
September 5, 2013

October 9, 2012
October 15, 2012
October 30, 2012
October 30, 2012
October 30, 2012
March 11, 2013

October 8, 2012
October 15, 2012
November 26, 2012

November 27, 2012


March 10, 2013
January 18, 2013
January 31, 2013
September 3, 2013

December 3, 2012
December 18, 2012
March 10, 2013
November 30, 2012
March 11, 2013
August 30, 2013

December 1, 2012
December 7, 2012
January 5, 2013
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish
September 2, 2013

October 27, 2012


November 2, 2012
November 10, 2012
August 29, 2013

September 10, 2012


October 8, 2012
February 12, 2013
August 27, 2013

July 11, 2012


January 4, 2013
June 30, 2012
October 12, 2012
April 2, 2013
March 5, 2013
December 21, 2012
February 15, 2013
March 14, 2013
March 5, 2013
April 3, 2013
March 29, 2013
March 12, 2013
March 12, 2013
March 12, 2013
March 5, 2013
March 16, 2013
April 10, 2013
May 14, 2013
April 26, 2013

October 10, 2012


October 12, 2012

October 12, 2012


October 15, 2012
October 19, 2012
October 25, 2012

September 27, 2012


October 1, 2012
October 1, 2012
October 18, 2012
October 22, 2012
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish
January 13, 2013
January 19, 2013
January 30, 2013
March 18, 2013

February 25, 2013


February 28, 2013
March 2, 2013
March 4, 2013

October 25, 2012


March 25, 2013

November 25, 2012


February 26, 2013

November 25, 2012


February 4, 2013
April 6, 2013
April 6, 2013

February 2, 2013
February 11, 2013
February 13, 2013
February 24, 2013
February 26, 2013

February 26, 2013


April 3, 2013
March 1, 2013
March 20, 2013
March 20, 2013
March 20, 2013

March 17, 2013


March 19, 2013

March 7, 2013
August 15, 2013

October 31, 2012


November 8, 2012
March 19, 2013

October 23, 2012


February 11, 2013

December 4, 2012
February 18, 2013
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish

December 4, 2012
March 23, 2012

November 20, 2012


March 20, 2013

February 25, 2012


March 7, 2013

February 25, 2012


March 7, 2013

-
-

October 13, 2012


March 9, 2013

October 25, 2012


January 28, 2012

October 14, 2012


February 29, 2012

October 14, 2012


March 6, 2013

September 20, 2012


November 21, 2012
February 25, 2013

October 14, 2012


October 20, 2012
March 6, 2013

October 14, 2012


March 6, 2013
October 17, 2012
October 21, 2012
October 28, 2012
November 2, 2012
August 2, 2013

November 30, 2013


March 20, 2013
September 6, 2013

October 14, 2012


March 10, 2013
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish
March 15, 2013
February 28, 2013
March 10, 2013

May 2, 2012
November 10, 2012
November 30, 2012

March 12, 2013


March 18, 2013
March 19, 2013
March 13, 2013
March 19, 2013
March 20, 2013
March 20, 2013
March 20, 2013
March 20, 2013
March 20, 2013
March 21, 2013
June 20, 2013
July 12, 2013
July 22, 2013
July 5, 2013
July 10, 2013
July 11, 2013
August 15, 2013 - -
September 9, 2013

September 8, 2012

September 10, 2013


September 11, 2013
December 11, 2013
LANT COMMISSIONING MONITORING
R - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Progress
Finish Start Finish
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MON


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR U

Rencana
No. Description
Start
ELECTRICAL SYSTEM
1 DC Supply Power System
Visual Inspection July 1, 2012
Battery Test July 2, 2012
Battery Charger Test July 8, 2012
2 AC Supply Power (MV/LV) System
Visual Inspection June 10, 2012
Station MV Switchgear Test June 18, 2012
Station LV Switchgear Test July 1, 2012
3 Emergency Power System
Visual Inspection June 10, 2012
Diesel Generator Set Test February 10, 2012
Uninteruptible Power Supply Test July 1, 2012
4 Substation System
Visual Inspection June 10, 2012
Circuit Breaker Test June 15, 2012
Current Transformer Test July 17, 2012
Potential Transformer Test July 13, 2012
Arrester Test July 3, 2012
Disconnecting Switch Test June 6, 2012
Relays Protection Test
Network Control System/Distribute Control System Test June 6, 2012
Protection & Interlock Test June 8, 2012
Intertripping Test June 8, 2012
Differential Current Stability Check August 2, 2012
5 Transformer System
Station Service Transformers June 16, 2012
Main Transformer September 5, 2012
Auxiliary Transformers February 23, 2013
MV Transformers Test June 10, 2012
LV Transformers Test July 1, 2012
Town Feeder Transformer Test June 15, 2012
6 Generator & Auxiliaries System
Visual Inspection September 20, 2012
Generator individual test September 23, 2012
Excitation Test November 22, 2012
CT/PT/LA Test December 9, 2012
Excitation Transformer Test February 12, 2013
Synchronizing system test March 18, 2013
Generator No Load Characteristic Test March 19, 2013
NGR test February 28, 2013
Busduct Test
BALANCE OF PLANT & ACCESSORIES
1 Fire Fighting System
Visual Inspection September 22, 2012
Motors and Pumps Test September 17, 2012
Protection & Interlock Test March 10, 2013
Fire Water System Commissioning Test March 12, 2013
CO2 System Commissioning Test March 12, 2013
Foam System Commissioning Test March 12, 2013
Heat, Smoke and Fire Detection System Test March 12, 2013
Hydrant, Sprayer and Deluge System Test March 12, 2013
Portable Fire Fighting Equipments March 12, 2013
Operation and Functional Test (All Area) March 12, 2013
2 Water Treatment System
Visual Inspection September 20, 2012
Individual Motor September 25, 2012
Individual Pump September 25, 2012
Sea Water Pre Treatment System October 8, 2012
Desalination Plant Test February 1, 2013
Demineralize Water System Test February 1, 2013
Make Up water Treatment Plant Test November 3, 2012
Industrial Water System Test November 5, 2012
Capacity and Quality Test September 4, 2013
3 Waste Water Treatment System
Visual Inspection October 1, 2012
Individual Motor October 5, 2012
Individual Pump October 5, 2012
Waste Water Treatment System Test November 1, 2012
Capacity and Quality Test September 4, 2013
4 Fuel Oil System
Visual Inspection October 7, 2012
Individual Motor October 10, 2012
Individual Pump October 10, 2012
Fuel Oil Receiving System Test October 20, 2012
Fuel Oil Forwarding System Test October 20, 2012
Fuel Oil Unloading System Test October 20, 2012
Fuel Oil Circulating Test March 10, 2013
5 Air Compressor System
Visual Inspection October 3, 2012
Individual Motor October 10, 2012
Individual Compressor October 10, 2012
Air Compressor System Test November 2, 2012
6 Coal Handling System
Visual Inspection November 25, 2012
Individual Motor November 29, 2012
Individual Conveyor November 29, 2012
Coal Transfers and Conveyors System Test November 29, 2012
Bridge Grab Ship Unloader System Test January 8, 2013
Bucket Wheel Stacker Reclaimer System Test January 20, 2013
Capacity Test September 3, 2013
7 Fly Ash and Bottom Ash Handling System
Visual Inspection December 1, 2012
Fly Ash Individual Test December 5, 2012
Fly Ash Handling System Operation Test February 26, 2013
Bottom Ash Handling Individual Test November 23, 2012
Bottom Ash Handling System Operation Test March 2, 2013
Capacity Test August 28, 2013
8 Hydrogen Plant System
Visual Inspection November 30, 2012
Hydrogen Plant Individual Test December 5, 2012
Hydrogen Plant System Test February 28, 2013
Capacity and Quality Test September 1, 2013
9 Sodium Hypochlorite Plant System
Visual Inspection October 26, 2012
Sodium Hypochlorite Plant Individual Test October 28, 2012
Sodium Hypochlorite Plant System Test November 7, 2012
Capacity and Quality Test August 27, 2013
10 Lime Stone and Sand System
Transporter/Conveyor -
11 Ventilation and Air Conditioning System
Visual Inspection September 9, 2012
Individual Test September 11, 2012
Ventilation and Air System Test February 8, 2013
Capacity and Quality Test August 24, 2013
DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION
1 Visual Inspection June 12, 2012
2 Instrumentation Calibration March 8, 2012
3 Power Receiving of DCS and Redundancy Power Test June 20, 2012
4 I/O and Control Loops System and Redundancy Test September 13, 2012
5 Turbine Supervisory and Emergency Trip System (TSI & ETS) Test March 25, 2013
6 Furnace Safety Supervisory System (FSSS) Test March 3, 2013
7 Data Aquisition System (DAS) Test December 7, 2012
8 Sequence Of Events System (SOE) Test February 12, 2013
9 Turbine Interlock and Protection System (ETS) Test March 12, 2013
10 Boiler Interlock and Protection System (FSSS, MFT & OFT) Test March 3, 2013
11 Modulating Control System (MCS) Test April 1, 2013
12 Sequence Control System (SCS) Test March 25, 2013
13 Digital Electro-Hydraulic Control System for Turbine (DEHC) Test March 10, 2013
14 Digital Electro-Hydraulic Control System for BFP-T (MEH) Test March 10, 2013
15 BFP- Turbine Driven Supervisory & Protection (MTSI & METS) Test March 1, 2013
16 Boiler Furnace Management System (BMS) Test March 2, 2013
17 Bypass Control System (BPS) Test March 15, 2013
18 Coordinate Control System (CCS) Test April 5, 2013
19 Governor Free and Automatic Governor Control System (AGS) Test May 12, 2013
20 Contineous Emission Flue Gas Monitoring System (CEMS) Test April 23, 2013
BOILER, TURBINE & AUXILIARIES
TURBINE
1 Make Up Water System
Visual Inspection October 9, 2012
Individual Motor October 12, 2012
Make Up Water Pump H/R Test October 12, 2012
2 Closed Cooling Water System
Visual Inspection October 12, 2012
Individual Motor October 13, 2012
CCCW Make Up Water Pump H/R Test October 13, 2012
CCCW Pump H/R Test October 18, 2012
CCCW Booster Pump H/R Test October 22, 2012
CCCW System February 10, 2013
3 Circulating Water System
Visual Inspection September 25, 2012
Individual Motor September 26, 2012
Rotary Screen System Operation Test October 1, 2012
Circulating Water Pump H/R Test September 26, 2012
Sea Water Booster Pump H/R Test October 17, 2012
Condenser Tube Cleaning System Operation Test October 21, 2012
Circulating Water System December 1, 2012
4 Condensate Water System
Visual Inspection January 10, 2013
Individual Motor January 15, 2013
Condensate Pump H/R Test January 15, 2013
Condensate Polishing System Test January 29, 2013
Deaerator System Test March 18, 2013
5 Feed Water System
Visual Inspection February 25, 2013
Individual Motor January 15, 2013
BFP Aux Oil Pump H/R Test February 26, 2013
BFP H/R Test March 1, 2013
BFP-T H/R Test March 3, 2013
6 Condenser Air Evacuation System
Visual Inspection
Individual Motor January 15, 2013
Vacuum Pump H/R Test October 20, 2012
Vacuum System Operation Test February 12, 2013
7 Turbine Gland Steam Seal System
Visual Inspection November 23, 2012
Gland Steam system February 25, 2013
Gland Steam Exhauster H/R Test February 25, 2013
8 Turbine Extraction and Drain System
Visual Inspection November 23, 2012
Valve Operation Test November 26, 2012
Heater Functional Test February 19, 2013
Drain Functional Test February 19, 2013
9 Turbine Control/Lubricating Oil System
Visual Inspection February 1, 2013
Individual Motor February 10, 2013
Emergency Oil Pump Running Test February 10, 2013
EHC Oil Pump H/R Test February 12, 2013
Turbine Barring and Turning Gear Test February 23, 2013
Turbine Jacking System Test February 25, 2013
10 Main Turbine
Visual Inspection February 25, 2013
Turbine Protection & Interlock Test March 3, 2013
Turbine Valves Test February 28, 2013
Turbine Vacuum Up Test March 19, 2013
Turbine No Load Test March 19, 2013
Turbine Load Test March 20, 2013
11 Turbine Supervision Instrument System
Visual Inspection March 17, 2013
I & C Loop Test March 18, 2013
12 Vibration Monitoring System
Visual Inspection March 3, 2013
Operation Function Test March 19, 2013
13 Generator Seal Oil System
Visual Inspection October 30, 2012
Individual Motor November 4, 2012
Emergency Seal oil Pump H/R Test November 4, 2012
H2 Gas Charging to Generator March 19, 2013
14 Generator Stator Cooling System
Visual Inspection October 20, 2012
Individual Motor November 2, 2012
Stator Cooling water Pump H/R Test November 2, 2012
Generator Stator Cooling System November 2, 2012
AUXILIARIES
15 Chemical Dosing System Commissioning
Visual Inspection December 3, 2012
Function & Operating Test February 12, 2013
16 Chemical Feeding System Commissioning
Visual Inspection December 3, 2012
Function & Operating Test March 15, 2013
17 Sampling & Analysis System Commissioning
Visual Inspection October 23, 2012
Function & Operating Test March 11, 2013
BOILER
18 Burner Front Oil System Operation Test
Visual Inspection February 24, 2013
Function & Operating Test March 5, 2013
19 Oil Lighter System Commissioning
Visual Inspection February 24, 2013
Function & Operating Test March 5, 2013
20 Atomizing Steam System Commissioning
Visual Inspection -
Function & Operating Test -
21 Flame Scanner Air System Commissioning
Visual Inspection October 12, 2012
Function & Operating Test March 8, 2013
22 Boiler Vents & Drain System Commissioning
Visual Inspection October 23, 2012
Function & Operating Test January 25, 2013
23 Boiler Seal Air System Commissioning
Visual Inspection October 13, 2012
Function & Operating Test February 27, 2013
25 Soot Blowing System Commissioning
Visual Inspection October 13, 2012
Function & Operating Test March 1, 2013
26 Auxiliary Steam System Commissioning
Visual Inspection September 15, 2012
Individual Motor September 21, 2012
Individual Fan and Pump September 21, 2012
Auxiliary Boiler Test September 21, 2012
Function & Operating Test December 1, 2012
27 Air Heater System Commissioning
Visual Inspection October 13, 2012
Individual Motor October 15, 2012
Air Heater Test October 15, 2012
Function & Operating Test March 1, 2013
28 Air-Flue Gas System
Visual Inspection October 10, 2012
Function & Operating Test March 1, 2013
Individual Motor October 15, 2012
Forced Draft Fan Test October 15, 2012
Induce Draft Fan Test October 18, 2012
Primary Air Fan Test October 25, 2012
Seal Air Fan Test October 30, 2012
Cold state vevtilation test March 1, 2013
Continous Emission Monitoring System Test August 1, 2013
29 Electrosatic Precipitator Commissioning
Visual Inspection November 25, 2012
Operation Function Test October 1, 2012
Efficiency Test September 3, 2013
30 Coal Feeder & Pulverizer System
Visual Inspection October 8, 2012
Individual Motor October 15, 2012
Pulverizer / Mills System Test October 15, 2012
Coal Feeder System Test October 15, 2012
Pyrites Removal System Test February 25, 2013
Operation Function Test March 1, 2013
31 Refractory Drying Out
Visual Inspection
Refractory Drying Out proses
32 Chain Grate
Operation Function Test
SYSTEM AND PLANTS TEST
1 Boiler Hydrostatic Test April 30, 2012
2 Pre-Boiler Chemical Cleaning System November 8, 2012
3 Boiler Chemical Cleaning System November 15, 2012
4 Boiler Safety Devices & Interlock Test
5 Turbine Safety Devices & Interlock Test
6 Generator Safety Devices & Interlock Test
7 Boiler Initial Firing March 12, 2013
8 Boiler Steam Blows March 12, 2013
9 Boiler Safety Valve Test March 19, 2013
10 BTG Interlock Test March 12, 2013
11 Initial Steam Admission to Turbine March 19, 2013
12 Turbine Over Speed Test March 20, 2013
13 Full Speed No Load Test (Governor/AVR Dynamic Test, etc) March 19, 2013
14 Generator Open Circuit Test March 19, 2013
15 Generator Short Circuit Test March 19, 2013
16 Synchronization System Test March 20, 2013
17 First Synchronization & Initial Load Test March 20, 2013
18 Cold, Warm & Hot Start Up Test June 19, 2013
19 Vacuum Tightness Test July 12, 2013
20 Variation Load Test & Tunning July 21, 2013
21 Load Ramp, Load Swing & Run Back Test, etc July 4, 2013
22 Half Condenser and One CWP Operation Test July 10, 2013
23 Load rejection Test and House Load Test July 10, 2013
24 Reliability Run Test (168 hours) August 7, 2013
25 Plant Performance Test August 17, 2013
- Boiler Efficiency Test and Turbine heat rate
- Generator Net Power Output
- Net Plant Heat Rate
- Auxiliary Power Consumption
- ESP Efficiency Test
- Maximum Load (Valve Wide Open) Test
- Minimum Load (Without Fuel Oil Support) Test
- Net Depandeble Capacity Test (NDC)
- HP Heater Cut Operation Test
26 Environmental Measurement September 3, 2013
- Flue Gas Emission Measurement
- Water Disposal Measurement
- Noise Level Measurement
27 SLO ( Sertifikat Laik Operasi ) September 10, 2013
28 COD (Commercial Operation Date) September 11, 2013
29 TOC (Taking Over Certificate) December 11, 2013

OVERALL
1 ELECTRICAL SYSTEM
2 BOILER
3 TURBINE
4 AUXILIARIES
5 DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION
6 SYSTEM AND PLANTS TEST
TOTAL
WER PLANT COMMISSIONING MONITORING
TIMUR - TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Bobot Progress
Finish Start Finish
100.00%
3.00% 100%
July 2, 2012 August 3, 2012 August 6, 2013 20%
July 8, 2012 August 4, 2012 August 14, 2012 40%
July 11, 2012 August 10, 2012 August 14, 2012 40%
3.00% 20%
June 15, 2012 September 3, 2012 September 4, 2012 20%
June 30, 2012 September 5, 2012 - 40%
July 31, 2012 40%
4.00% 10%
June 15, 2012 20%
February 18, 2012 40%
July 8, 2012 September 1, 2012 40%
30.00%
June 14, 2012 5%
June 19, 2012 12%
July 19, 2012 5%
July 16, 2012 7%
July 20, 2012 7%
June 15, 2012 7%
9%
June 20, 2012 9%
July 11, 2012 15%
July 20, 2012 14%
August 4, 2012 10%
40.00%
June 19, 2012 20%
March 20, 2013 25%
April 20, 2013 10%
June 30, 2012 25%
July 31, 2012 15%
June 18, 2012 5%
20.00%
September 21, 2012 5%
September 29, 2012 10%
November 28, 2012 15%
December 19, 2012 10%
February 15, 2013 15%
March 18, 2013 10%
March 19, 2013 15%
March 1, 2013 10%
10%
100.00%
10.00%
September 24, 2012 5%
September 27, 2012 10%
March 11, 2013 5%
July 23, 2013 20%
July 23, 2013 5%
July 23, 2013 5%
July 23, 2013 15%
July 23, 2013 15%
July 23, 2013 10%
July 23, 2013 10%
20.00%
September 25, 2012 5%
October 20, 2012 5%
October 20, 2012 10%
October 20, 2012 15%
February 21, 2013 15%
March 2, 2013 15%
November 16, 2012 15%
November 14, 2012 15%
September 5, 2013 5%
7.00%
October 4, 2012 10%
October 15, 2012 10%
October 15, 2012 20%
November 15, 2012 40%
September 5, 2013 20%
15.00%
October 9, 2012 5%
October 15, 2012 10%
October 15, 2012 20%
October 30, 2012 25%
October 30, 2012 10%
October 30, 2012 10%
March 11, 2013 20%
5.00%
October 8, 2012 5%
October 15, 2012 20%
October 15, 2012 30%
November 26, 2012 45%
20.00%
November 27, 2012 5%
March 10, 2013 10%
March 10, 2013 15%
March 10, 2013 30%
January 18, 2013 15%
January 31, 2013 15%
September 3, 2013 10%
10.00%
December 3, 2012 5%
December 18, 2012 10%
March 10, 2013 25%
November 30, 2012 10%
March 11, 2013 25%
August 30, 2013 25%
5.00%
December 1, 2012 5%
December 7, 2012 25%
March 28, 2013 40%
September 2, 2013 30%
5.00%
October 27, 2012 5%
November 2, 2012 25%
November 10, 2012 40%
August 29, 2013 30%
-
-
3.00%
September 10, 2012 5%
October 8, 2012 25%
February 12, 2013 40%
August 27, 2013 30%
100.00%
July 11, 2012 5%
January 4, 2013 6%
June 30, 2012 5%
October 12, 2012 6%
April 2, 2013 7%
March 5, 2013 5%
December 21, 2012 5%
February 15, 2013 5%
March 14, 2013 5%
March 5, 2013 7%
April 3, 2013 5%
March 29, 2013 5%
March 12, 2013 5%
March 12, 2013 5%
March 12, 2013 5%
March 5, 2013 4%
March 16, 2013 5%
April 10, 2013 5%
May 14, 2013 3%
April 26, 2013 2%

100.00%
3.00%
October 10, 2012 20%
October 12, 2012 30%
October 12, 2012 50%
10.00%
October 12, 2012 5%
October 15, 2012 15%
October 15, 2012 20%
October 19, 2012 20%
October 25, 2012 20%
February 15, 2013 20%
10.00%
September 27, 2012 5%
October 1, 2012 15%
October 1, 2012 5%
October 1, 2012 25%
October 18, 2012 15%
October 22, 2012 10%
December 6, 2012 25%
7.00%
January 13, 2013 5%
January 19, 2013 15%
January 19, 2013 25%
January 30, 2013 25%
March 18, 2013 30%
10.00%
February 25, 2013 5%
January 19, 2013 15%
February 28, 2013 15%
March 2, 2013 25%
March 4, 2013 40%
4.00%
5%
January 19, 2013 25%
October 25, 2012 30%
March 25, 2013 40%
2.00%
November 25, 2012 10%
February 26, 2013 40%
February 26, 2013 50%
10.00%
November 25, 2012 5%
February 4, 2013 25%
April 6, 2013 40%
April 6, 2013 30%
7.00%
February 2, 2013 5%
February 13, 2013 20%
February 11, 2013 15%
February 13, 2013 20%
February 24, 2013 20%
February 26, 2013 20%
20.00%
February 26, 2013 5%
April 3, 2013 20%
March 1, 2013 10%
March 20, 2013 10%
March 20, 2013 25%
March 20, 2013 30%
4.00%
March 17, 2013 10%
March 19, 2013 90%
4.00%
March 7, 2013 10%
August 15, 2013 90%
5.00%
October 31, 2012 5%
November 8, 2012 20%
November 8, 2012 40%
March 19, 2013 35%
4.00%
October 23, 2012 5%
February 11, 2013 20%
February 11, 2013 25%
February 11, 2013 50%
100.00%
40.00%
December 4, 2012 10%
February 18, 2013 90%
40.00%
December 4, 2012 10%
March 23, 2012 90%
20.00%
November 20, 2012 10%
March 20, 2013 90%
100.00%
8.00%
February 25, 2012 10%
March 7, 2013 90%
5.00%
February 25, 2012 10%
March 7, 2013 90%
5.00%
- 10%
- 90%
5.00%
October 13, 2012 10%
March 9, 2013 90%
5.00%
October 25, 2012 10%
January 28, 2012 90%
5.00%
October 14, 2012 10%
February 29, 2012 90%
10.00%
October 14, 2012 10%
March 6, 2013 90%
8.00%
September 20, 2012 5%
November 21, 2012 15%
November 21, 2012 20%
November 21, 2012 30%
February 25, 2013 30%
3.00%
October 14, 2012 5%
October 20, 2012 20%
October 20, 2012 35%
March 6, 2013 40%
20.00%
October 14, 2012 5%
March 6, 2013 25%
October 17, 2012 5%
October 17, 2012 10%
October 21, 2012 10%
October 28, 2012 10%
November 2, 2012 10%
March 6, 2013 20%
August 2, 2013 5%
5.00%
November 30, 2013 5%
March 20, 2013 25%
September 6, 2013 70%
20.00%
October 14, 2012 5%
October 17, 2012 15%
March 10, 2013 20%
March 15, 2013 15%
February 28, 2013 10%
March 10, 2013 35%
-
-
-
1.00%
100%
100.00%
May 2, 2012 5%
November 10, 2012 3%
November 30, 2012 4%
6%
6%
6%
March 12, 2013 8%
March 18, 2013 3%
March 19, 2013 1%
March 13, 2013 1%
March 19, 2013 3%
March 20, 2013 1%
March 20, 2013 3%
March 20, 2013 1%
March 20, 2013 1%
March 20, 2013 1%
March 21, 2013 10%
June 20, 2013 4%
July 12, 2013 1%
July 22, 2013 3%
July 5, 2013 3%
July 10, 2013 1%
July 11, 2013 3%
August 15, 2013 - - 7%
September 9, 2013 10%
40%
10%
10%
10%
10%
5%
5%
5%
5%
September 8, 2012 3%
30%
30%
40%
September 10, 2013 2%
September 11, 2013
December 11, 2013

10.00% 100.00% 10.0%


15.00% 100.00% 15.0%
15.00% 100.00% 15.0%
10.00% 100.00% 10.0%
10.00% 100.00% 10.0%
40.00% 100.00% 40.0%
TOTAL 100.0%
PT.PLN(PERSERO) JASA SERTIFIKASI

COAL FIRED POWER PLANT COMMISSIONING MONITORING


PLTU 3 JAWA TIMUR - TANJUNG AWAR-AWAR UNIT #1

Rencana
No. Description
Start

ELECTRICAL SYSTEM
1 DC Supply Power System
Visual Inspection July 1, 2012
Battery Test July 2, 2012
Battery Charger Test July 8, 2012
2 AC Supply Power (MV/LV) System
Visual Inspection June 10, 2012
Station MV Switchgear Test June 18, 2012
Station LV Switchgear Test July 1, 2012
3 Emergency Power System
Visual Inspection June 10, 2012
Diesel Generator Set Test February 10, 2012
Uninteruptible Power Supply Test July 1, 2012
4 Substation System
Visual Inspection June 10, 2012
Circuit Breaker Test June 15, 2012
Current Transformer Test July 17, 2012
Potential Transformer Test July 13, 2012
Arrester Test July 3, 2012
Disconnecting Switch Test June 6, 2012
Relays Protection Test
Network Control System/Distribute Control System Test June 6, 2012
Protection & Interlock Test June 8, 2012
Intertripping Test June 8, 2012
Differential Current Stability Check August 2, 2012
5 Transformer System
Station Service Transformers June 16, 2012
Main Transformer September 5, 2012
Auxiliary Transformers February 23, 2013
MV/LV Transformers Test June 10, 2012
Town Feeder Transformer Test June 15, 2012
6 Generator & Auxiliaries System
Visual Inspection September 20, 2012
Generator individual test September 23, 2012
Excitation Test November 22, 2012
CT/PT/LA Test December 9, 2012
Excitation Transformer Test February 12, 2013
Synchronizing system test March 18, 2013
Generator No Load Characteristic Test March 19, 2013
NGR test February 28, 2013
Busduct Test
BALANCE OF PLANT & ACCESSORIES
1 Fire Fighting System
Visual Inspection September 22, 2012
Motors and Pumps Test September 17, 2012
Protection & Interlock Test March 10, 2013
Fire Water System Commissioning Test March 12, 2013
CO2 System Commissioning Test March 12, 2013
Foam System Commissioning Test March 12, 2013
Heat, Smoke and Fire Detection System Test March 12, 2013
Hydrant, Sprayer and Deluge System Test March 12, 2013
Portable Fire Fighting Equipments March 12, 2013
Operation and Functional Test (All Area) March 12, 2013
2 Water Treatment System
Visual Inspection September 20, 2012
Individual Motor September 25, 2012
Individual Pump September 25, 2012
Sea Water Pre Treatment System October 8, 2012
Desalination Plant Test February 1, 2013
Demineralize Water System Test February 1, 2013
Make Up water Treatment Plant Test November 3, 2012
Industrial Water System Test November 5, 2012
Capacity and Quality Test September 4, 2013
3 Waste Water Treatment System
Visual Inspection October 1, 2012
Individual Motor October 5, 2012
Individual Pump October 5, 2012
Waste Water Treatment System Test November 1, 2012
Capacity and Quality Test September 4, 2013
4 Fuel Oil System
Visual Inspection October 7, 2012
Individual Motor October 10, 2012
Individual Pump October 10, 2012
Fuel Oil Receiving System Test October 20, 2012
Fuel Oil Forwarding System Test October 20, 2012
Fuel Oil Unloading System Test October 20, 2012
Fuel Oil Circulating Test March 10, 2013
5 Air Compressor System
Visual Inspection October 3, 2012
Individual Motor October 10, 2012
Individual Compressor October 10, 2012
Air Compressor System Test November 2, 2012
6 Coal Handling System
Visual Inspection November 25, 2012
Individual Motor November 29, 2012
Individual Conveyor November 29, 2012
Coal Transfers and Conveyors System Test November 29, 2012
Bridge Grab Ship Unloader System Test January 8, 2013
Bucket Wheel Stacker Reclaimer System Test January 20, 2013
Capacity Test September 3, 2013
7 Fly Ash and Bottom Ash Handling System
Visual Inspection December 1, 2012
Fly Ash Individual Test December 5, 2012
Fly Ash Handling System Operation Test February 26, 2013
Bottom Ash Handling Individual Test November 23, 2012
Bottom Ash Handling System Operation Test March 2, 2013
Capacity Test August 28, 2013
8 Hydrogen Plant System
Visual Inspection November 30, 2012
Hydrogen Plant Individual Test December 5, 2012
Hydrogen Plant System Test February 28, 2013
Capacity and Quality Test September 1, 2013
9 Sodium Hypochlorite Plant System
Visual Inspection October 26, 2012
Sodium Hypochlorite Plant Individual Test October 28, 2012
Sodium Hypochlorite Plant System Test November 7, 2012
Capacity and Quality Test August 27, 2013
10 Ventilation and Air Conditioning System
Visual Inspection September 9, 2012
Individual Test September 11, 2012
Ventilation and Air System Test February 8, 2013
Capacity and Quality Test August 24, 2013

DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION


1 Visual Inspection June 12, 2012
2 Instrumentation Calibration March 8, 2012
3 Power Receiving of DCS and Redundancy Power Test June 20, 2012
4 I/O and Control Loops System and Redundancy Test September 13, 2012
5 Turbine Supervisory and Emergency Trip System (TSI & ETS) Test March 25, 2013
6 Furnace Safety Supervisory System (FSSS) Test March 3, 2013
7 Data Aquisition System (DAS) Test December 7, 2012
8 Sequence Of Events System (SOE) Test February 12, 2013
9 Turbine Interlock and Protection System (ETS) Test March 12, 2013
10 Boiler Interlock and Protection System (FSSS, MFT & OFT) Test March 3, 2013
11 Modulating Control System (MCS) Test April 1, 2013
12 Sequence Control System (SCS) Test March 25, 2013
13 Digital Electro-Hydraulic Control System for Turbine (DEHC) Test March 10, 2013
14 Digital Electro-Hydraulic Control System for BFP-T (MEH) Test March 10, 2013
15 BFP- Turbine Driven Supervisory & Protection (MTSI & METS) Test March 1, 2013
16 Boiler Furnace Management System (BMS) Test March 2, 2013
17 Bypass Control System (BPS) Test March 15, 2013
18 Coordinate Control System (CCS) Test April 5, 2013
19 Governor Free and Automatic Governor Control System (AGS) Test May 12, 2013
20 Contineous Emission Flue Gas Monitoring System (CEMS) Test April 23, 2013

BOILER, TURBINE & AUXILIARIES


TURBINE
1 Make Up Water System
Visual Inspection October 9, 2012
Individual Motor October 12, 2012
Make Up Water Pump H/R Test October 12, 2012
2 Closed Cooling Water System
Visual Inspection October 12, 2012
Individual Motor October 13, 2012
CCCW Make Up Water Pump H/R Test October 13, 2012
CCCW Pump H/R Test October 18, 2012
CCCW Booster Pump H/R Test October 22, 2012
CCCW System February 10, 2013
3 Circulating Water System
Visual Inspection September 25, 2012
Individual Motor September 26, 2012
Rotary Screen System Operation Test October 1, 2012
Circulating Water Pump H/R Test September 26, 2012
Sea Water Booster Pump H/R Test October 17, 2012
Condenser Tube Cleaning System Operation Test October 21, 2012
Circulating Water System December 1, 2012
4 Condensate Water System
Visual Inspection January 10, 2013
Individual Motor January 15, 2013
Condensate Pump H/R Test January 15, 2013
Condensate Polishing System Test January 29, 2013
Deaerator System Test March 18, 2013
5 Feed Water System
Visual Inspection February 25, 2013
Individual Motor January 15, 2013
BFP Aux Oil Pump H/R Test February 26, 2013
BFP H/R Test March 1, 2013
BFP-T H/R Test March 3, 2013
6 Condenser Air Evacuation System
Visual Inspection
Individual Motor January 15, 2013
Vacuum Pump H/R Test October 20, 2012
Vacuum System Operation Test February 12, 2013
7 Turbine Gland Steam Seal System
Visual Inspection November 23, 2012
Gland Steam system February 25, 2013
Gland Steam Exhauster H/R Test February 25, 2013
8 Turbine Extraction and Drain System
Visual Inspection November 23, 2012
Valve Operation Test November 26, 2012
Heater Functional Test February 19, 2013
Drain Functional Test February 19, 2013
9 Turbine Control/Lubricating Oil System
Visual Inspection February 1, 2013
Individual Motor February 10, 2013
Emergency Oil Pump Running Test February 10, 2013
EHC Oil Pump H/R Test February 12, 2013
Turbine Barring and Turning Gear Test February 23, 2013
Turbine Jacking System Test February 25, 2013
10 Main Turbine
Visual Inspection February 25, 2013
Turbine Protection & Interlock Test March 3, 2013
Turbine Valves Test February 28, 2013
Turbine Vacuum Up Test March 19, 2013
Turbine No Load Test March 19, 2013
Turbine Load Test March 20, 2013
11 Turbine Supervision Instrument System
Visual Inspection March 17, 2013
I & C Loop Test March 18, 2013
12 Vibration Monitoring System
Visual Inspection March 3, 2013
Operation Function Test March 19, 2013
13 Generator Seal Oil System
Visual Inspection October 30, 2012
Individual Motor November 4, 2012
Emergency Seal oil Pump H/R Test November 4, 2012
Generator seal oil system
H2 Gas Charging to Generator March 19, 2013
14 Generator Stator Cooling System
Visual Inspection October 20, 2012
Individual Motor November 2, 2012
Stator Cooling water Pump H/R Test November 2, 2012
Generator Stator Cooling System November 2, 2012

AUXILIARIES
15 Chemical Dosing System Commissioning
Visual Inspection December 3, 2012
Function & Operating Test February 12, 2013
16 Chemical Feeding System Commissioning
Visual Inspection December 3, 2012
Function & Operating Test March 15, 2013
17 Sampling & Analysis System Commissioning
Visual Inspection October 23, 2012
Function & Operating Test March 11, 2013

BOILER
18 Burner Front Oil System Operation Test
Visual Inspection February 24, 2013
Function & Operating Test March 5, 2013
19 Oil Lighter System Commissioning
Visual Inspection February 24, 2013
Function & Operating Test March 5, 2013
20 Atomizing Steam System Commissioning
Visual Inspection -
Function & Operating Test -
21 Flame Scanner Air System Commissioning
Visual Inspection October 12, 2012
Function & Operating Test March 8, 2013
22 Boiler Vents & Drain System Commissioning
Visual Inspection October 23, 2012
Function & Operating Test January 25, 2013
23 Boiler Seal Air System Commissioning
Visual Inspection October 13, 2012
Function & Operating Test February 27, 2013
25 Soot Blowing System Commissioning
Visual Inspection October 13, 2012
Function & Operating Test March 1, 2013
26 Auxiliary Steam System Commissioning
Visual Inspection September 15, 2012
Individual Motor September 21, 2012
Individual Fan and Pump September 21, 2012
Auxiliary Boiler Test September 21, 2012
Function & Operating Test December 1, 2012
27 Air Heater System Commissioning
Visual Inspection October 13, 2012
Individual Motor October 15, 2012
Air Heater Test October 15, 2012
Function & Operating Test March 1, 2013
28 Air-Flue Gas System
Visual Inspection October 10, 2012
Function & Operating Test March 1, 2013
Individual Motor October 15, 2012
Forced Draft Fan Test October 15, 2012
Induce Draft Fan Test October 18, 2012
Primary Air Fan Test October 25, 2012
Seal Air Fan Test October 30, 2012
Cold state ventilation test March 1, 2013
Continous Emission Monitoring System Test August 1, 2013
29 Electrosatic Precipitator Commissioning
Visual Inspection November 25, 2012
Operation Function Test October 1, 2012
Efficiency Test September 3, 2013
30 Coal Feeder & Pulverizer System
Visual Inspection October 8, 2012
Individual Motor October 15, 2012
Pulverizer / Mills System Test October 15, 2012
Coal Feeder System Test October 15, 2012
Pyrites Removal System Test February 25, 2013
Operation Function Test March 1, 2013
31 Refractory Drying Out
Visual Inspection
Refractory Drying Out proses
32 Chain Grate
Operation Function Test

SYSTEM AND PLANTS TEST


1 Boiler Hydrostatic Test April 30, 2012
2 Pre-Boiler Chemical Cleaning System November 8, 2012
3 Boiler Chemical Cleaning System November 15, 2012
4 Boiler Safety Devices & Interlock Test
5 Turbine Safety Devices & Interlock Test
6 Generator Safety Devices & Interlock Test
7 Boiler Initial Firing March 12, 2013
8 Boiler Steam Blows March 12, 2013
9 Boiler Safety Valve Test March 19, 2013
10 BTG Interlock Test March 12, 2013
11 Initial Steam Admission to Turbine March 19, 2013
12 Turbine Over Speed Test March 20, 2013
13 Full Speed No Load Test (Governor/AVR Dynamic Test, etc) March 19, 2013
14 Generator Open Circuit Test March 19, 2013
15 Generator Short Circuit Test March 19, 2013
16 Synchronization System Test March 20, 2013
17 First Synchronization & Initial Load Test March 20, 2013
18 Cold, Warm & Hot Start Up Test June 19, 2013
19 Vacuum Tightness Test July 12, 2013
20 Variation Load Test & Tunning July 21, 2013
21 Load Ramp, Load Swing & Run Back Test, etc July 4, 2013
22 Half Condenser and One CWP Operation Test July 10, 2013
23 Load rejection Test and House Load Test July 10, 2013
24 Reliability Run Test (168 hours) August 7, 2013

UNIT #1
1 ELECTRICAL SYSTEM
2 BOILER
3 TURBINE
4 AUXILIARIES
5 DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION
6 SYSTEM AND PLANTS TEST
7 BALANCE OF PLANT
TOTAL
NT COMMISSIONING MONITORING
TANJUNG AWAR-AWAR UNIT #1

Rencana Realisasi
Bobot
Finish Start Finish
June 18, 2013
100.00% 45.02%
3.00% 3.00%
July 2, 2012 August 3, 2012 August 6, 2013 20% 100% 20.00%
July 8, 2012 August 4, 2012 August 14, 2012 40% 100% 40.00%
July 11, 2012 August 10, 2012 August 14, 2012 40% 100% 40.00%
3.00% 2.46%
June 15, 2012 September 3, 2012 September 4, 2012 20% 70% 14.00%
June 30, 2012 September 5, 2012 - 40% 100% 40.00%
July 31, 2012 40% 70% 28.00%
4.00% 0.96%
June 15, 2012 20% 20% 4.00%
February 18, 2012 40% 0% 0.00%
July 8, 2012 September 1, 2012 40% 50% 20.00%
30.00% 23.55%
June 14, 2012 September 24, 2012 October 17, 2012 5% 100% 5.00%
June 19, 2012 September 24, 2012 October 2, 2012 12% 100% 12.00%
July 19, 2012 July 4, 2012 July 20, 2012 5% 100% 5.00%
July 16, 2012 July 4, 2012 July 20, 2012 7% 100% 7.00%
July 20, 2012 July 2, 2012 July 3, 2012 7% 100% 7.00%
June 15, 2012 June 27, 2012 July 3, 2012 7% 100% 7.00%
9% 100% 9.00%
June 20, 2012 August 21, 2012 February 18, 2013 9% 60% 5.40%
July 11, 2012 November 6, 2012 February 19, 2013 15% 60% 9.00%
July 20, 2012 February 19, 2013 February 19, 2013 14% 15% 2.10%
August 4, 2012 February 21, 2013 February 21, 2013 10% 100% 10.00%
40.00% 14.800%
June 19, 2012 August 30, 2013 20% 100% 20.00%
March 20, 2013 September 9, 2012 30% 5% 1.50%
April 20, 2013 15% 0% 0.00%
June 30, 2012 December 14, 2012 25% 60% 15.00%
June 18, 2012 10% 5% 0.50%
20.00% 0.2500%
September 21, 2012 September 20, 2012 5% 5% 0.25%
September 29, 2012 10% 0% 0.00%
November 28, 2012 15% 0% 0.00%
December 19, 2012 October 1, 2012 10% 10% 1.00%
February 15, 2013 15% 0% 0.00%
March 18, 2013 10% 0% 0.00%
March 19, 2013 15% 0% 0.00%
March 1, 2013 10% 0% 0.00%
10% 0% 0.00%
100.00% 16.95%
10.00% 1.6500%
September 24, 2012 April 11, 2013 5% 40% 2.00%
September 27, 2012 April 12, 2013 10% 50% 5.00%
March 11, 2013 5% 0% 0.00%
July 23, 2013 20% 10% 2.00%
July 23, 2013 5% 0% 0.00%
July 23, 2013 5% 100% 5.00%
July 23, 2013 15% 0% 0.00%
July 23, 2013 15% 10% 1.50%
July 23, 2013 10% 10% 1.00%
July 23, 2013 10% 0% 0.00%
20.00% 2.200%
September 25, 2012 5% 60% 3.00%
October 20, 2012 January 28, 2013 April 11, 2013 5% 80% 4.00%
October 20, 2012 10% 40% 4.00%
October 20, 2012 15% 0% 0.00%
February 21, 2013 15% 0% 0.00%
March 2, 2013 15% 0% 0.00%
November 16, 2012 15% 0% 0.00%
November 14, 2012 15% 0% 0.00%
September 5, 2013 5% 0% 0.00%
7.00% 1.12000%
October 4, 2012 10% 50% 5.00%
October 15, 2012 10% 60% 6.00%
October 15, 2012 20% 25% 5.00%
November 15, 2012 40% 0% 0.00%
September 5, 2013 20% 0% 0.00%
15.00% 10.72500%
October 9, 2012 March 24, 2013 5% 50% 2.50%
October 15, 2012 March 25, 2013 March 27, 2013 10% 100% 10.00%
October 15, 2012 20% 65% 13.00%
October 30, 2012 25% 80% 20.00%
October 30, 2012 10% 80% 8.00%
October 30, 2012 10% 80% 8.00%
March 11, 2013 20% 50% 10.00%
5.00% 0.11%
October 8, 2012 5% 45% 2.25%
October 15, 2012 20% 0% 0.00%
October 15, 2012 30% 0% 0.00%
November 26, 2012 45% 0% 0.00%
20.00% 0.65%
November 27, 2012 5% 65% 3.25%
March 10, 2013 10% 0% 0.00%
March 10, 2013 15% 0% 0.00%
March 10, 2013 30% 0% 0.00%
January 18, 2013 15% 0% 0.00%
January 31, 2013 15% 0% 0.00%
September 3, 2013 10% 0% 0.00%
10.00% 0.05000%
December 3, 2012 5% 10% 0.50%
December 18, 2012 10% 0% 0.00%
March 10, 2013 25% 0% 0.00%
November 30, 2012 10% 0% 0.00%
March 11, 2013 25% 0% 0.00%
August 30, 2013 25% 0% 0.00%
5.00% 0.012500%
December 1, 2012 5% 5% 0.25%
December 7, 2012 25% 0% 0.00%
March 28, 2013 40% 0% 0.00%
September 2, 2013 30% 0% 0.00%
5.00% 0.43%
October 27, 2012 5% 20% 1.00%
November 2, 2012 25% 30% 7.50%
November 10, 2012 40% 0% 0.00%
August 29, 2013 30% 0% 0.00%
3.00% 0.007500%
September 10, 2012 5% 5% 0.25%
October 8, 2012 25% 0% 0.00%
February 12, 2013 40% 0% 0.00%
August 27, 2013 30% 0% 0.00%

100.00% 29.62%
July 11, 2012 5% 45% 2.25%
January 4, 2013 6% 62% 3.72%
June 30, 2012 5% 75% 3.75%
October 12, 2012 6% 65% 3.90%
April 2, 2013 7% 45% 3.15%
March 5, 2013 5% 80% 4.00%
December 21, 2012 5% 45% 2.25%
February 15, 2013 5% 0% 0.00%
March 14, 2013 5% 0% 0.00%
March 5, 2013 7% 80% 5.60%
April 3, 2013 5% 0% 0.00%
March 29, 2013 5% 0% 0.00%
March 12, 2013 5% 0% 0.00%
March 12, 2013 5% 0% 0.00%
March 12, 2013 5% 0% 0.00%
March 5, 2013 4% 25% 1.00%
March 16, 2013 5% 0% 0.00%
April 10, 2013 5% 0% 0.00%
May 14, 2013 3% 0% 0.00%
April 26, 2013 2% 0% 0.00%

100.00% 31.66%
3.00% 1.950%
October 10, 2012 March 7, 2013 March 7, 2013 20% 50% 10.00%
October 12, 2012 March 8, 2013 March 8, 2013 30% 100% 30.00%
October 12, 2012 50% 50% 25.00%
10.00% 7.750%
October 12, 2012 March 25, 2013 March 25, 2013 5% 50% 2.50%
October 15, 2012 March 26, 2013 March 26, 2013 15% 100% 15.00%
October 15, 2012 20% 80% 16.00%
October 19, 2012 20% 50% 10.00%
October 25, 2012 20% 80% 16.00%
February 15, 2013 April 10, 2013 20% 90% 18.00%
10.00% 7.35000%
September 27, 2012 5% 50% 2.50%
October 1, 2012 15% 100% 15.00%
October 1, 2012 5% 100% 5.00%
October 1, 2012 25% 100% 25.00%
October 18, 2012 15% 40% 6.00%
October 22, 2012 10% 0% 0.00%
December 6, 2012 25% 80% 20.00%
7.00% 3.59%
January 13, 2013 5% 45% 2.25%
January 19, 2013 15% 100% 15.00%
January 19, 2013 25% 100% 25.00%
January 30, 2013 25% 0% 0.00%
March 18, 2013 30% 30% 9.00%
10.00% 1.70%
February 25, 2013 5% 40% 2.00%
January 19, 2013 15% 100% 15.00%
February 28, 2013 15% 0% 0.00%
March 2, 2013 25% 0% 0.00%
March 4, 2013 40% 0% 0.00%
4.00% 2.60%
March 5, 2013 March 5, 2013 5% 50% 2.50%
January 19, 2013 March 6, 2013 March 6, 2013 25% 90% 22.50%
October 25, 2012 30% 0% 0.00%
March 25, 2013 40% 100% 40.00%
2.00% 1.23%
November 25, 2012 10% 75% 7.50%
February 26, 2013 40% 60% 24.00%
February 26, 2013 50% 60% 30.00%
10.00% 1.95%
November 25, 2012 5% 10% 0.50%
February 4, 2013 25% 20% 5.00%
April 6, 2013 40% 20% 8.00%
April 6, 2013 30% 20% 6.00%
7.00% 0.02%
February 2, 2013 5% 5% 0.25%
February 13, 2013 20% 0% 0.00%
February 11, 2013 15% 0% 0.00%
February 13, 2013 20% 0% 0.00%
February 24, 2013 20% 0% 0.00%
February 26, 2013 20% 0% 0.00%
20.00% 0.10%
February 26, 2013 5% 10% 0.50%
April 3, 2013 20% 0% 0.00%
March 1, 2013 10% 0% 0.00%
March 20, 2013 10% 0% 0.00%
March 20, 2013 25% 0% 0.00%
March 20, 2013 30% 0% 0.00%
4.00% 1.88%
March 17, 2013 10% 65% 6.50%
March 19, 2013 90% 45% 40.50%
4.00% 0.00%
March 7, 2013 10% 0% 0.00%
August 15, 2013 90% 0% 0.00%
5.00% 1.54%
October 31, 2012 5% 15% 0.75%
November 8, 2012 15% 0% 0.00%
November 8, 2012 25% 0% 0.00%
30% 100% 30.00%
March 19, 2013 25% 0% 0.00%
4.00% 0.01%
October 23, 2012 5% 5% 0.25%
February 11, 2013 20% 0% 0.00%
February 11, 2013 25% 0% 0.00%
February 11, 2013 50% 0% 0.00%

100.00% 0.00%
40.00% 0.00%
December 4, 2012 10% 0% 0.00%
February 18, 2013 90% 0% 0.00%
40.00% 0.00%
December 4, 2012 10% 0% 0.00%
March 23, 2012 90% 0% 0.00%
20.00% 0.00%
November 20, 2012 10% 0% 0.00%
March 20, 2013 90% 0% 0.00%

100.00% 13.73%
8.00% 0.00%
February 25, 2012 10% 0% 0.00%
March 7, 2013 90% 0% 0.00%
5.00% 0.00%
February 25, 2012 10% 0% 0.00%
March 7, 2013 90% 0% 0.00%
5.00% 0.00%
- 10% 0% 0.00%
- 90% 0% 0.00%
5.00% 2.40%
October 13, 2012 10% 30% 3.00%
March 9, 2013 90% 50% 45.00%
5.00% 0.00%
October 25, 2012 10% 0% 0.00%
January 28, 2012 90% 0% 0.00%
5.00% 0.00%
October 14, 2012 10% 0% 0.00%
February 29, 2012 90% 0% 0.00%
10.00% 0.00%
October 14, 2012 10% 0% 0.00%
March 6, 2013 90% 0% 0.00%
8.00% 4.80%
September 20, 2012 5% 50% 2.50%
November 21, 2012 15% 100% 15.00%
November 21, 2012 20% 40% 8.00%
November 21, 2012 30% 80% 24.00%
February 25, 2013 30% 35% 10.50%
3.00% 0.03%
October 14, 2012 5% 20% 1.00%
October 20, 2012 20% 0% 0.00%
October 20, 2012 35% 0% 0.00%
March 6, 2013 40% 0% 0.00%
20.00% 4.70%
October 14, 2012 5% 65% 3.25%
March 6, 2013 25% 65% 16.25%
October 17, 2012 April 13, 2013 5% 80% 4.00%
October 17, 2012 10% 0% 0.00%
October 21, 2012 10% 0% 0.00%
October 28, 2012 10% 0% 0.00%
November 2, 2012 10% 0% 0.00%
March 6, 2013 20% 0% 0.00%
August 2, 2013 5% 0% 0.00%
5.00% 0.20%
November 30, 2013 5% 30% 1.50%
March 20, 2013 25% 10% 2.50%
September 6, 2013 70% 0% 0.00%
20.00% 1.60%
October 14, 2012 5% 40% 2.00%
October 17, 2012 March 8, 2013 April 4, 2013 15% 40% 6.00%
March 10, 2013 20% 0% 0.00%
March 15, 2013 15% 0% 0.00%
February 28, 2013 10% 0% 0.00%
March 10, 2013 35% 0% 0.00%
-
-
-
1.00% 0.00%
100% 0% 0.00%

85.00% 12.00%
May 2, 2012 5% 100% 5.00%
November 10, 2012 3% 100% 3.00%
November 30, 2012 4% 100% 4.00%
6% 0% 0.00%
6% 0% 0.00%
6% 0% 0.00%
March 12, 2013 8% 0% 0.00%
March 18, 2013 3% 0% 0.00%
March 19, 2013 1% 0% 0.00%
March 13, 2013 1% 0% 0.00%
March 19, 2013 3% 0% 0.00%
March 20, 2013 1% 0% 0.00%
March 20, 2013 3% 0% 0.00%
March 20, 2013 1% 0% 0.00%
March 20, 2013 1% 0% 0.00%
March 20, 2013 1% 0% 0.00%
March 21, 2013 10% 0% 0.00%
June 20, 2013 4% 0% 0.00%
July 12, 2013 1% 0% 0.00%
July 22, 2013 3% 0% 0.00%
July 5, 2013 3% 0% 0.00%
July 10, 2013 1% 0% 0.00%
July 11, 2013 3% 0% 0.00%
August 15, 2013 - - 7% 0% 0.00%

15.00% 45.02% 6.75%


15.00% 13.73% 2.06%
15.00% 31.66% 4.75%
7.00% 0.00% 0.00%
10.00% 29.62% 2.96%
30.00% 12.00% 3.60%
8.00% 16.95% 1.36%
TAL 100.00% 21.480%
22
15
15
10
15
8
15
100
UNIT #1
No. ITEM
1-Jan-12 1-Feb-12 1-Mar-12
1 ELECTRICAL SYSTEM
2 BOILER
3 TURBINE
4 AUXILIARIES
5 DISTRIBUTION CONTROL SYSTEM & INSTRUMENTATION
6 SYSTEM AND PLANT TEST
7 BALANCE OF PLANT
TOTAL
Planning 0.00% 2.00% 3.00%
Keterlambatan 0.00% -2.00% -3.00%
Periode
1-Apr-12 1-May-12 1-Jun-12 1-Jul-12 1-Aug-12 1-Sep-12 1-Oct-12 1-Nov-12 1-Dec-12 2-Jan-13
4.90%
0.02%
0.00%
0.00%
0.16%
#REF!
0.00%
0.00% #REF!
4.50% 6.30% 8.00% 10.20% 13.00% 16.00% 23.00% 30.00% 35.00% 42.00%
-4.50% -6.30% -8.00% -10.20% -13.00% -16.00% -23.00% -30.00% -35.00% #REF!

Commissioning S - C
PLTU TANJUNG AWAR-AWA
BOP
100.00%

90.00%

80.00%

70.00%

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
12 12 12 1 2 12 1 2 12 12 12 1 2 12 12 13 1 3 13
an- eb- ar- pr- ay- un- Jul- ug- ep- ct- ov- ec- an- eb- ar- pr
J F A J 1- 1-A 1-S 1-O 1-N 1-D 1-J 1-F 1-M 1-A
1- 1- 1-M 1 - 1- M 1 -
10.00%

0.00%
2 2 2 2 2 2 2 2 2 2 2 2 3 3 3
n-1 b-1 r-1 r-1 y-1 n-1 l-1 g-1 p-1 ct-1 v-1 c-1 n-1 b-1 r-1 r
a p u e a
1-
Ja -Fe -M A a Ju 1-J -Au -Se -O -No -D
1-
Ja -Fe -M Ap
1 1 1 - 1- M 1 - 1 1 1 1 1 1 1 1-
de
### 3-Mar-13 4-Apr-13 1-May-13 26-May-13 18-Jun-13 1-Jul-13 1-Aug-13 1-Sep-13 1-Oct-13
5.35% 5.68% 6.38% 6.44% 6.75% 6.75%
0.05% 0.08% 0.40% 0.92% 1.15% 2.06%
0.23% 0.23% 0.92% 1.91% 2.14% 4.75%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.26% 0.32% 0.54% 1.06% 1.15% 2.96%
#REF! #REF! #REF! #REF! #REF! 3.60%
0.02% 0.02% 0.25% 0.64% 0.66% 1.36%
#REF! #REF! #REF! #REF! #REF! 21.48%
49.00% 56.50% 67.00% 72.00% 77.50% 81.00% 83.50% 88.00% 93.00% 96.00%
#REF! #REF! #REF! #REF! #REF! -59.52% -83.50% -88.00% -93.00% -96.00%

mmissioning S - Curve
NG AWAR-AWAR UNIT #1 DAN
BOP

actual
planning

2 2 3 3 3 3 3 3 3 3 3 3 3 3
-1 c-1 n-1 b-1 r-1 r-1 y-1 n-1 l-1 g-1 p-1 ct-1 v-1 c-1
e
D 1- Ja e a p a Ju Ju u e o e
1-
F A
1- 1-M 1- 1-M 1- 1- 1-A 1-S 1-O 1-N 1-D
2 2 3 3 3 3 3 3 3 3 3 3 3 3
-1 c-1 n-1 b-1 r-1 r-1 y-1 n-1 l-1 g-1 p-1 ct-1 v-1 c-1
e
D 1-Ja -Fe -M a p a u
Ju 1-J -Au -Se -O -No -De
A
1- 1 1 1- 1- M 1 - 1 1 1 1 1
1-Nov-13 1-Dec-13

98.50% 100.00%
-98.50% -100.00%