Diaphragm wall Construction


Deep Basement
Diaphragm Wall - Barrette Pile Slurry Walls. Deep Basement by Diaphragm wall

facebook.com OPEN


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 1/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Dear friend, we work building quantity calculation in manual in a paper, So now going we area in how
to Calculate in Excel use a long wall and short wall method.

This long wall and short wall method is very easy to calculation in the estimation sheet. In this
estimation excel sheet easy calution using a excel formulas. In this article also attached construction
cost estimate template excel sheet. so please see that.

Laminates contains plastics and resins. Some resins give off harmful gases. In this article, we
calculate step by calculation as below.

Note: Free Download building construction estimate spreadsheet excel download UK, US, Canada,
and also India.

Important Point

Following Quantities Are Building Estimation


Building Estimation
#1. Excavation
How to Find Excavation as Per Drawing 
#2. Footing P.C.C.
How to Find Footing P.C.C. as Per Drawing 
How to Find Footing R.C.C. as Per Drawing 
#4. Column up to Plinth Level R.C.C.
How to Find Column up to Plinth Level R.C.C. as Per Drawing 
#5. Backfilling
How to Find Backfilling as Per Drawing 
#6. Plinth Beam R.C.C.
How to Find Plinth Beam R.C.C. as Per Drawing 
#7. Grae Slab R.C.C.
How to Find Grae Slab RCC as Per Drawing 
#8. Column Up to Slab Level R.C.C.
How to Find Grae Slab RCC as Per Drawing 
#9. Brick Masonry  
How to Find Brick Masonry as Per Drawing 
#10. In Side Plaster
How to Find In Side Plaster as Per Drawing 

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 2/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

#11. Out Side Plaster


How to Find Out Side Plaster as Per Drawing 
#12. Celling Plaster
How to Find Celling Plaster as Per Drawing 
#13. Slab R.C.C.
How to Find In Out Slab  R.C.C. as Per Drawing 
#14. In Side Paint
How to Find In Side Paint as Per Drawing 
#15. Out Side Pint
How to Find Out Side Plaster as Per Drawing 
Building Estimation
Calculated to Estimate
Estimation of Building
Estimate of Building in Excel
Estimate for Building

Following Quantities Are Building Estimation


1. Excavation

2. Footing P.C.C.

3. Footing R.C.C.

Diaphragm wall Construction


Deep Basement
Diaphragm Wall - Barrette Pile Slurry Walls. Deep Basement by Diaphragm wall

facebook.com OPEN

4. Column up to Plinth Level R.C.C.

5. Backfilling


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 3/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Diaphragm wall Construction


Deep Basement
Diaphragm Wall - Barrette Pile Slurry Walls. Deep Basement by Diaphragm wall

facebook.com OPEN

6. Plinth Beam R.C.C.

7. Grae Slab R.C.C.

8. Column Up to Slab Level R.C.C.

9. Brick Masonry  

10. In Side Plaster

11. Out Side Plaster

Diaphragm wall Construction


Deep Basement
Diaphragm Wall - Barrette Pile Slurry Walls. Deep Basement by Diaphragm wall

facebook.com OPEN

12. Celling Plaster

13. Slab R.C.C.

14. In Side Paint

15. Out Side Pint

Building Estimation
It is processed by predicting the probable cost of a project by calculating material quantity and
their costing with help of market rates before undertaking any construction project.

Or

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 4/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Diaphragm wall Construction


Deep Basement
Diaphragm Wall - Barrette Pile Slurry Walls. Deep Basement by Diaphragm wall

facebook.com OPEN

A building estimator or cost estimator is an individual that quantifies the materials, labor, and


equipment needed to complete a construction project.

Building Estimate Format in Excel, Building Material Calculator Free Download –


Download Excel Sheet

Building Estimation and Costing Excel Sheet – Download Excel Sheet

Also, read: How to Find House Construction Cost

#1. Excavation
How to Find Excavation as Per Drawing 
Footing excavation work needs sum drawing like Footing location Drawing and Section Drawing. All
drawing as per below, please see

Section A-A


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 5/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Siddhivinayak Precast Pipes


Precast Manhole and U Drains
Manufacturer of Precast U Drain, Manhole Chamber and CCTV Pole Foundation

siddhivinayakprecast.com OPEN

Footing Location

In this plan, 11 footings as per drawing.

Length = 0.6m + 1.0m + 0.6m = 2.20m

Here 0.6 m is working space in footing for both sides.

And,1.0 m = footing size

As per follows table format copy of the building estimate excel sheet.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 6/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description (m)
(m) (m)

Earthwork in
1 Excavation in

Foundation:

Footing (1m x
11 2.200 2.200 1.580 84.12 Cu.m.
1m)

Depth From GL =
0.6 + 1 + 0.6

0.6 =Extra For


working space

Total Qty= 84.12 Cu.m.

Also, read: What Is Slab Beam / Hidden Beam / Concealed Beam | Advantage and
Disadvantage

#2. Footing P.C.C.


How to Find Footing P.C.C. as Per Drawing 
In this plan, 11 footings as per drawing.

Length = 0.15m + 1.0m + 0.15m = 1.30m

Here 0.15 m = P.C.C. working space in footing, for both side

And,1.0 m = footing size

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description (m)
(m) (m)


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 7/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

2 Footing P.C.C.

Footing (1m x
11 1.300 1.300 0.075 1.39 Cu.m.
1m)

Thickness =
0.075

D = 0.150 + 1.0 +
0.150

Total Qty= 1.39 Cu.m.

#3. Footing R.C.C.

How to Find Footing R.C.C. as Per Drawing 

Post-Match Gaming Analysis


Optimize items, skills, builds, runes and more elements.

Blitz.gg Download

In this plan, 11 footings as per drawing.

Length = 1.0m  = 1.0m

Here Height = 0.450 m

And, 1.0 m = footing size

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description (m)
(m) (m)

3 Footing R.C.C.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 8/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Base(1m x 1m) 11 1.000 1.000 0.450 4.95 Cu.m.

Thickness =
0.450

Total Qty= 4.95 Cu.m.

Also, read: Difference Between CPM and PERT/PERT Vs CPM | What Is CPM & PERT

#4. Column up to Plinth Level R.C.C.


How to Find Column up to Plinth Level R.C.C. as Per Drawing 
In this plan, 11 footings as per drawing.

Length = 0.230 m, Breadth = 0.230 m

Here Height = 1.05 m


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 9/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Custom ERP Suite

Ad NolaPro

Diaphragm wall

Construction - Deep

Basement
Ad facebook.com

House Construction

Cost Calculator Excel

Sheet For Ground…


civiljungle.com

Section A-A

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description (m)
(m) (m)

Column up to
4 Plinth Level

R.C.C.

Column 11 0.230 0.230 1.050 0.61 Cu.m.

Total Qty= 0.61 Cu.m.

#5. Backfilling
How to Find Backfilling as Per Drawing 
Footing backfilling qty for 11 Qty

Length & Breadth = 2.2 m, Height Footing Bottom to ground level = 1.580 mm

Backfilling = Excavation – Footing P.C.C – Column R.C.C

Plinth Beam Backfilling

Height of backfilling = 0.600 m

Total plinth beam backfilling = Total Area – Plinth beam ♣


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 10/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

5 BackFilling

Backfilling In
5.a
Footing

Excavation Area 11 2.200 2.200 1.580 84.12 Cu.m.

Deduction

Footing P.C.C. -11 1.300 1.300 0.075 -1.39 Cu.m.

Footing R.C.C. -11 1.000 1.000 0.450 -4.95 Cu.m.

Footing Column -11 0.230 0.230 1.050 -0.61 Cu.m.

5.a Total Qty= 77.16 Cu.m.

Plinth Beam
5.b
Backfilling

Plinth area out to


1 10.240 7.690 0.600 47.25 Cu.m.
out

Deduction

L-1 -3 10.240 0.230 0.600 -4.24 Cu.m.

L-2 -4 3.000 0.230 0.600 -1.66 Cu.m.

L-3 -3 4.000 0.230 0.600 -1.66 Cu.m.

L-4 -1 1.500 0.230 0.600 -0.21 Cu.m.

L-5 -1 2.315 0.230 0.600 -0.32 Cu.m.

5.b Total Qty= 39.17 Cu.m.



https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 11/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

5.a + 5.b Total Qty= 116.33 Cu.m.

Also, read, Rate Analysis of Brick Masonry

#6. Plinth Beam R.C.C.


How to Find Plinth Beam R.C.C. as Per Drawing 


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 12/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Lintel Beam

As per lintel beam drawing, L-1 = 3 nos., L-2 = 4 nos., L-3 = 3 nos., L- 4 = 1 nos, L-5 = 1 nos of qty
and length

and beam size = 0.230 m x 0.600 m

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

Plinth Beam
6
R.C.C.

Beam (230 mm x
600 mm)

L-1 3 10.240 0.230 0.600 4.24 Cu.m.

L-2 4 3.000 0.230 0.600 1.66 Cu.m.

L-3 3 4.000 0.230 0.600 1.66 Cu.m.

L-4 1 1.500 0.230 0.600 0.21 Cu.m.

L-5 1 2.315 0.230 0.600 0.32 Cu.m.

Total Qty= 0.32 Cu.m.

#7. Grae Slab R.C.C.


How to Find Grae Slab RCC as Per Drawing 

Grae Slab RCC = ( Total Length x Total Breadth x Thickness ) – Column

Grae Slab RCC = ( 10.240 x 7.690 x 0.100 ) – ( 11 x 0.230 x 0.230 x 0.100)

Grae Slab RCC = ( 7.87 ) – (0.06)

Grae Slab RCC = 7.82 Cu.m.

QUANTITY SHEET

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 13/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

Grae Slab
7
R.C.C.

Plinth area out to


1 10.240 7.690 0.100 7.87 Cu.m.
out

Deduction

Column -11 0.230 0.230 0.100 -0.06 Cu.m.

Total Qty= 7.82 Cu.m.

#8. Column Up to Slab Level R.C.C.


How to Find Grae Slab RCC as Per Drawing 
Column Length & Breadth= 0.230 m

Height = Ground Slab – Ground Floor – Slab Beam

Height = 3 – 0 – 0.350 = 2.650 m

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

Column Up to

8 Slab Level
R.C.C.

Column 11 0.230 0.230 2.650 1.54 Cu.m.

Total Qty= 1.54 Cu.m.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 14/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Also, read: What Is Floating Slab| Floating Slab Construction | How to Build a Floating
Slab | Advantages & Disadvantages Floating Slabs

#9. Brick Masonry  


How to Find Brick Masonry as Per Drawing 

Plan


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 15/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Elevation

Section

Brick masonry calculation uses a Long wall and Short wall method

All length as per drawing and height = 3.00 m – 0.35 m = 2.65 m.

QUANTITY SHEET

Sr. Item No. Length


Widht/
Height/
Quantity Unit

No. Description  (m) Breadth


Depth


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 16/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

(m) (m)

9 Brick Masonry  

230 mm thick

wall Brick

Masonry

Long Wall 3 10.240 0.230 2.650 18.72 Cu.m.

Shot wall-1 3 3.000 0.230 2.650 5.49 Cu.m.

Shot wall-1 1 3.000 0.230 1.200 0.83 Cu.m.

Shot Wall-2 3 4.000 0.230 2.650 7.31 Cu.m.

Deduction

Column -11 0.230 0.230 2.650 -1.54 Cu.m.

Window W -2 2.000 0.230 1.200 -1.10 Cu.m.

Window W1 -2 1.500 0.230 1.200 -0.83 Cu.m.

Window W2 -3 1.200 0.230 1.200 -0.99 Cu.m.

Window W3 -1 1.200 0.230 1.500 -0.41 Cu.m.

Door o -2 1.200 0.230 2.100 -1.16 Cu.m.

Door D -1 1.200 0.230 2.100 -0.58 Cu.m.

Door D1 -1 1.000 0.230 2.100 -0.48 Cu.m.

Door MS -1 2.000 0.230 1.200 -0.55 Cu.m.

Vent -1 0.900 0.230 0.600 -0.12 Cu.m.

Vent V1 -1 0.600 0.230 0.600 -0.08 Cu.m.

Total Qty 230 mm Thick Wall= 24.49 Cu.m.

115 mm thick


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 17/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

wall Brick

Masonry

Bath Room 1 1.500 0.115 2.650 0.46 Cu.m.

Passage wall 1 2.315 0.115 2.650 0.71 Cu.m.

Deduction

Door D2 -2 0.750 0.115 2.100 -0.36 Cu.m.

Parapet Wall

Long Wall 2 10.240 0.115 1.000 2.36 Cu.m.

Shot Wall 2 7.460 0.115 1.000 1.72 Cu.m.

Total Qty 115 mm Thick Wall= 4.87 Cu.m.

#10. In Side Plaster


How to Find In Side Plaster as Per Drawing 

Sum Note Point for deduction

1. 0.5 sq.m. below section is a full deduction

2. 0.5 sq.m. to 3.0 sq.m. between  half deduction in area

3. 3.0 sq.m above full deduction but add side pattas

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

10 In Side Plaster

Bed Room

Long Wall 2 4.000 3.000 24.00 Sq.m.

Shot wall 2 3.000 3.000 18.00 Sq.m.



https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 18/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Deduction

Door D1 -0.5 1.000 2.100 -1.05 Sq.m.

Window W2 -0.5 1.200 1.000 -0.60 Sq.m.

Window W3 -0.5 1.200 1.200 -0.72 Sq.m.

Kitchen +
Dining

Long Wall 2 4.000 3.000 24.00 Sq.m.

Shot wall 2 4.000 3.000 24.00 Sq.m.

Deduction

Door O -0.5 1.200 2.100 -1.26 Sq.m.

Window W2 -1 1.200 1.000 -1.20 Sq.m.

Verandah

Long Wall 2 3.000 3.000 18.00 Sq.m.

Shot wall 1 3.000 3.000 9.00 Sq.m.

Shot wall 1 3.000 1.200 3.60 Sq.m.

Deduction

Door MS -0.5 1.200 1.200 -0.72 Sq.m.

Door D -0.5 1.200 2.100 -1.26 Sq.m.

Window W -0.5 2.000 1.200 -1.20 Sq.m.

DRG. Room

Long Wall 2 5.550 3.000 33.30 Sq.m.

Shot wall 2 4.000 3.000 24.00 Sq.m.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 19/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Deduction

Door O -1 1.200 2.100 -2.52 Sq.m.

Door D -0.5 1.200 1.200 -0.72 Sq.m.

Window W -0.5 2.000 1.200 -1.20 Sq.m.

Window W1 -1 1.500 1.200 -1.80 Sq.m.

Bath Room

Long Wall 2 1.500 3.000 9.00 Sq.m.

Shot wall 2 1.200 3.000 7.20 Sq.m.

Deduction

Door D2 -0.5 0.750 2.100 -0.79 Sq.m.

Vent V1 -0.5 0.900 0.600 -0.27 Sq.m.

W.C.

Long Wall 2 1.500 3.000 9.00 Sq.m.

Shot wall 2 1.000 3.000 6.00 Sq.m.

Deduction

Door D2 -0.5 0.750 2.100 -0.79 Sq.m.

Vent -0.5 0.600 0.600 -0.18 Sq.m.

Passage

Long Wall 2 2.320 3.000 13.92 Sq.m.

Shot wall 2 1.390 3.000 8.34 Sq.m.

Deduction

Door D2 -1 0.750 2.100 -1.58 Sq.m.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 20/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Door D1 -1 1.000 2.100 -2.10 Sq.m.

Door O -1 1.200 2.100 -2.52 Sq.m.

Total Qty In Side Plaster= 208.89 Sq.m.

#11. Out Side Plaster


How to Find Out Side Plaster as Per Drawing 

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

Out Side
11
Plaster

Front Side 1 4.450 4.775 21.25 Sq.m.

1 3.230 2.180 7.04 Sq.m.

Lintel W 1 2.000 1.300 2.60 Sq.m.

Deduction

Door MS -0.5 1.200 1.200 -0.72 Sq.m.

Window W -0.5 2.000 1.200 -1.20 Sq.m.

Back Side 1 7.690 4.775 36.72 Sq.m.

Lintel W 2 2 1.200 1.300 3.12 Sq.m.

Deduction

Window W 2 -1 1.200 1.000 -1.20 Sq.m.

Right Side 1 10.240 4.775 48.90 Sq.m.

Deduction

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 21/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Window W -0.5 2.000 1.200 -1.20 Sq.m.

Window W 3 -0.5 1.200 1.200 -0.72 Sq.m.

Vent -0.5 0.600 0.600 -0.18 Sq.m.

Vent V1 -0.5 0.900 0.600 -0.27 Sq.m.

Left Side 1 10.240 4.775 48.90 Sq.m.

Deduction

Window W 1 -1 1.500 1.200 -1.80 Sq.m.

Window W 2 -0.5 1.200 1.000 -0.60 Sq.m.

Parapet Wall

Long Wall 2 10.010 1.115 22.32 Sq.m.

Shot Wall 2 7.460 1.000 14.92 Sq.m.

Total Out Side Plastet Qty = 197.87 Sq.m.

#12. Celling Plaster


How to Find Celling Plaster as Per Drawing 

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description (m)
(m) (m)

12 Celling Plaster

Bed Room 1 4.000 3.000 12.00 Sq.m.

Kitchen + Dining 1 4.000 4.000 16.00 Sq.m.

Verandah 1 3.000 3.000 9.00 Sq.m.

DRG. Room 1 5.550 4.000 22.20 Sq.m.



https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 22/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Bath Room 1 1.500 1.200 1.80 Sq.m.

W.C 1 1.500 1.000 1.50 Sq.m.

Passage 1 2.320 1.390 3.22 Sq.m.

Total Out Side Plastet Qty = 65.72 Sq.m.

#13. Slab R.C.C.


How to Find In Out Slab  R.C.C. as Per Drawing 

Slab Beam


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 23/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Section

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description  (m)
(m) (m)

13 Slab RCC

Slab Area 1 10.240 7.690 0.100 7.87  Cu.m.

S-1 3 10.240 0.230 0.350 2.47  Cu.m.

S-2 4 3.000 0.230 0.350 0.97  Cu.m.

S-3 3 4.000 0.230 0.350 0.97  Cu.m.

S-4 1 1.500 0.230 0.350 0.12  Cu.m.

S-5 1 2.315 0.230 0.350 0.19  Cu.m.

Total RCC Slab Qty= 12.59  Cu.m.

#14. In Side Paint


How to Find In Side Paint as Per Drawing 

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 24/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

QUANTITY SHEET

Widht/
Height/

Sr. Item Length

No. Breadth
Depth
Quantity Unit
No. Description (m)
(m) (m)

14 In Side Paint

Bed Room

Long Wall 2 4.000 3.000 24.00 Sq.m.

Shot wall 2 3.000 3.000 18.00 Sq.m.

Bed Room
1 4.000 3.000 12.00 Sq.m.
Ceiling

Deduction

Door D1 -1 1.000 2.100 -2.10 Sq.m.

Window W2 -1 1.200 1.000 -1.20 Sq.m.

Window W3 -1 1.200 1.200 -1.44 Sq.m.

Kitchen +
Dining

Long Wall 2 4.000 3.000 24.00 Sq.m.

Shot wall 2 4.000 3.000 24.00 Sq.m.

Kitchen + Dining
1 4.000 4.000 16.00 Sq.m.
Celling

Deduction

Door O -1 1.200 2.100 -2.52 Sq.m.

Window W2 -2 1.200 1.000 -2.40 Sq.m.

Verandah

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 25/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Long Wall 2 3.000 3.000 18.00 Sq.m.

Shot wall 1 3.000 3.000 9.00 Sq.m.

Shot wall 1 3.000 1.200 3.60 Sq.m.

Verandah Celling 1 3.000 3.000 9.00 Sq.m.

Deduction

Door MS -1 1.200 1.200 -1.44 Sq.m.

Door D -1 1.200 2.100 -2.52 Sq.m.

Window W -1 2.000 1.200 -2.40 Sq.m.

DRG. Room

Long Wall 2 5.550 3.000 33.30 Sq.m.

Shot wall 2 4.000 3.000 24.00 Sq.m.

DRG. Room
1 5.550 4.000 22.20 Sq.m.
Ceiling

Deduction

Door O -2 1.200 2.100 -5.04 Sq.m.

Door D -1 1.200 1.200 -1.44 Sq.m.

Window W -1 2.000 1.200 -2.40 Sq.m.

Window W1 -2 1.500 1.200 -3.60 Sq.m.

Bath Room

Long Wall 2 1.500 3.000 9.00 Sq.m.

Shot wall 2 1.200 3.000 7.20 Sq.m.

Bath Room
1 1.500 1.200 1.80 Sq.m.
Ceiling


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 26/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Deduction

Door D2 -1 0.750 2.100 -1.58 Sq.m.

Vent V1 -1 0.900 0.600 -0.54 Sq.m.

W.C.

Long Wall 2 1.500 3.000 9.00 Sq.m.

Shot wall 2 1.000 3.000 6.00 Sq.m.

W.C Celling 1 1.500 1.000 1.50 Sq.m.

Deduction

Door D2 -1 0.750 2.100 -1.58 Sq.m.

Vent -1 0.600 0.600 -0.36 Sq.m.

Passage

Long Wall 2 2.320 3.000 13.92 Sq.m.


HOME
CIVIL
EXCEL SHEET
TOOLS
हिं दी
Shot wall 2 1.390 3.000 8.34 Sq.m.

Passage Celling 1 2.320 1.390 3.22 Sq.m.

Deduction

Door D2 -2 0.750 2.100 -3.15 Sq.m.

Door D1 -2 1.000 2.100 -4.20 Sq.m.

Door O -2 1.200 2.100 -5.04 Sq.m.

Total Qty In Side Plaster= 252.14 Sq.m.

#15. Out Side Pint


How to Find Out Side Plaster as Per Drawing 

QUANTITY SHEET


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 27/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Sr. Item No. Length


Widht/
Height/
Quantity Unit
No. Description (m) Breadth
Depth

(m) (m)

15 Out Side Plaster

Front Side 1 4.450 4.775 21.25 Sq.m.

1 3.230 2.180 7.04 Sq.m.

Lintel W 1 2.000 1.300 2.60 Sq.m.

Deduction

Door MS -1 1.200 1.200 -1.44 Sq.m.

Window W -1 2.000 1.200 -2.40 Sq.m.

Back Side 1 7.690 4.775 36.72 Sq.m.

Lintel W 2 2 1.200 1.300 3.12 Sq.m.

Deduction

Window W 2 -1 1.200 1.000 -1.20 Sq.m.

Right Side 1 10.240 4.775 48.90 Sq.m.

Deduction

Window W -1 2.000 1.200 -2.40 Sq.m.

Window W 3 -1 1.200 1.200 -1.44 Sq.m.

Vent -1 0.600 0.600 -0.36 Sq.m.

Vent V1 -1 0.900 0.600 -0.54 Sq.m.

Left Side 1 10.240 4.775 48.90 Sq.m.

Deduction

Window W 1 -2 1.500 1.200 -3.60 Sq.m.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 28/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Window W 2 -1 1.200 1.000 -1.20 Sq.m.

Parapet Wall

Long Wall 2 10.010 1.115 22.32 Sq.m.

Shot Wall 2 7.460 1.000 14.92 Sq.m.

Total Out Side Plastet Qty = 191.18 Sq.m.

FAQ

Building Estimation
A building estimator or cost estimator is an individual that quantifies the materials, labor, and
equipment needed to complete a construction project. Building cost estimating can concern
diverse forms of construction from residential properties to hi-rise and civil works.

Calculated to Estimate
Estimation is used to predict the answer to a calculation.
The estimation uses round numbers in a calculation to make it quicker or easier to get an
approximate answer.
For example, if we were to estimate the answer to 11.87 x 4.876. We could use
the calculation 10 x 5 = 50.

Estimation of Building
Estimation of A Building With Plan is processed of predicting the probable cost of the project
by calculating material quantity and their costing with help of market rates before undertaking
any construction project.

Estimate of Building in Excel


Cost Estimation RCC Building Excel Sheet In order to determine the rate of a particular item,
the factors affecting the rate of that item are studied carefully and then finally a rate is decided
for that item. This process of determining the rates of an item is termed as analysis of rates or
rate analysis.

Estimate for Building


Estimation of A Building With Plan is processed of predicting the probable cost of the project
by calculating material quantity and their costing with help of market rates before undertaking
any construction project.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 29/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Like this post? Share it with your friends!

Suggested Read –

What is BoQ | BoQ Meaning | Advantages of BoQ | What is BoM


Difference Between One Way Slab and Two Way Slab | What is Slab
What Is Rate Analysis | Rate Analysis of Earth Work, Brick, Concrete and Plaster
What Is Construction Contract | Types of Engineering Contracts | Percentage-Rate Contract
Estimation for Building Works | Centre Line Method | Long and Short Wall or Out and in to
in a method
What Is Structural Settlement | Causes For Structural Settlement | What Is Soil Settlement
& Foundation Structural Settlement

Diaphragm wall
House Construction
NolaPro House Construction

Construction - Deep
Cost Calculator Excel
Cost Calculator | How

Basement Sheet For Ground


to Work With House

Floor(G.F.), G.F.+1,… Construction Cost…


Ad facebook.com civiljungle.com Ad NolaPro civiljungle.com

Proteus PCB Design House Construction


How to Excavation
Estimation for Building

Cost Calculator Excel


Calculation in Excel
Works | Centre Line

Sheet Sheet | What Is


Method | Long and

Excavation |… Short Wall Method


Ad Proteus | Labcenter civiljungle.com civiljungle.com civiljungle.com

By Krunal Rajput

About Krunal Rajput


Hey, I am Krunal Rajput. The Man Behind CivilJungle. I started this site to
spread knowledge about Civil Engineering. I am a Degree Holder in Civil
Engineering.

You can find him on Facebook, Twitter, Tumblr, Instagram and Google News.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 30/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Comments

Swapnil Sutar says

Hello Sir,

Its really nice to visit your website. luckily I got your website and I saw that, its complete
ocean of knowledge for civil engineers. really appreciable of your talent and knowledge.
Thanks a lot Sir for sharing your valuable knowledge and experience…. I pray for your
success…

Sir, can you share the File of “Complete Building Estimation Step by Step In Excel Sheet
Calculator”. Sir, If you can, plz mail me on —- sutarswapnil708@gmail.com.

Thanking you. Best of Luck Sir.

Reply

Krunal Rajput says

Thanks for response

Please see the article, already add a link for the excel sheet

Reply

Dhiraj says

Hello Sir , I have not found any link for the excel sheet. Can you help me to find out?

Reply

Krunal Rajput says

https://drive.google.com/uc?
export=download&id=1CkeWNg68pEXU8whEjTZpcKO9GaMA73Zo

Reply

Asad says

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 31/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Hi sir

Kindly provide me this house drawing in pdf

Bijay Kumar Swain says

Very nice to find all the details also very generous of you sharing the excel sheet.

Thanks

Reply

yaseen says

dear ,

where is estimation & , its only quantity of concrete ,

how much building material required ?

thanks for sharing knowledge .

Reply

Krunal Rajput says

Thanks, Dear

Reply


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 32/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Krunal Rajput says

Nice Articale

Reply

Krunal Rajput says

Thanks

Reply

vinupradha says

Very useful.please send baseball court construction detailed estimate

Reply

Krunal Rajput says

I have no experience of Baseball court construction

Reply

JAGDISH CHANDRA DANGI says

It’s only quantity of total material used in construction… Please provide estimate excel sheet
… Thank you for sharing knowledge !!

Reply

Akbar Hasnain says ♣


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 33/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Thank you so much for giving me information and cooperation

Reply

gunasekhar says

I Need Full Course building estimation cost

And Formalas So You Have Any Material In This Could You Please Send Me
This Is My Mail Id guna81761@gmail.com

Reply

Mukamanamara Vierney says

This work is very helpful to me. Thank you very much.

Reply

Krunal Rajput says

Thanks

Reply

Rahul patil says

I want this this type plan…calculate the quantity of items work using standard measurement
sheets load bearing residential structure using description of items from DSR(1bhk plan with
staircase)

Reply

https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 34/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Pravin amale says

Thanks

Reply

Krunal Rajput says

Welcome

Reply

Kiran says

Hello Krunal,

Thank you for your building estimator. Its really very helpful to understand estimate.

I have different query – I got detailed drawing for construction of house but could not able to
estimate using your estimator as i am not very well versed with terminology.

Do you give paid service to give me detail estimation such as how much exact concrete
required, steel required, other things such as masonry (bricks, plastering), plubming,
electricity etc. if i provide you details of the plan ? This will help me to decide whether to go
with only labor or give to builder ?

Looking for your reply.

Thank you very much.

Reply

Mohammed Umair Khan says

Thanks, keep it up.


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 35/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Reply

Kaushal Kishore Sinhaa says

Sir, Thanks for such a great information. I have to build a g+3 building under a contractor. But
I want to have some knowledge about footings, columns, beams and slab. Can I have
specific knowledge from your site? i.e. specification of steel bars and their dia etc.

Reply

Vaishnavi says

Sir can you tell that by which method it is done longwall and shortwall method or center line
method sir….

Reply

Robert says

Halloo

Please may I request your training on doing interior works meansurement. Thanks

Reply

Prashant yadav says

Hello sir
Your article is very helpful to understand building estimation but sir how steel ,labour charges
and foam work include in estimation please reply sir or send me explanation of above three
mention things.thanks sir for sharing valuable knowledge

Reply

Newer Comments »


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 36/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Leave a Reply
Your email address will not be published. Required fields are marked *

Comment

Name *

Email *

Website

POST COMMENT


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 37/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

Diaphragm

wall

Construction
Deep Basement
Diaphragm Wall -

Barrette Pile Slurry

Walls. Deep Basement

by Diaphragm wall

facebook.com

OPEN

Write For Us And Earn


Money

Popular Post

What Does Parapet Mean |


Types of Parapet Wall | Uses of
Parapet Wall

What Is a Flight of Stairs | Types


of Stairs | How Many Stairs in a
Flight | Some Facts About
Stairwells

Cinder Block Vs Concrete Block


| What Is Cinder Blocks | What
Is Concrete Blocks ♣
https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 38/39
20/12/2021, 21:08 Building Estimation Step by Step In Excel Sheet

What Is Shoring In Construction


| Type of Shoring

Floating Slab Vs Monolithic Slab


| What Is Monolithic Slab | What
Is Floating Slab

H-Beam vs I-Beam | What Is H-


Beam | What Is I-Beam

MIND BEHIND CIVILJUNGLE ADVERTISE


At CivilJungle, we clarify civil engineering and
Hey, I am Krunal Rajput. The
publish all the happenings & news of civil engineering.
Man Behind CivilJungle. I
started this site to spread
knowledge about Get Traffic & Exposure. We help brands optimize their
Civil/Mechanical/Electrical online presence & performance.
Engineering. I am a Degree
Holder in Civil Engineering. MORE DETAIL

You can find him on Facebook, Twitter, Tumblr,


Instagram and Google News. CONNECT WITH US

Privacy Policy | Contact Us | Cookie Policy | Sitemap | Sitemap For Hindi


 
 
© Copyright 2019-2021 CivilJungle.Com | The Content May Not Be Reproduced On Other Websites | Website Maintained By Hashtag360


https://civiljungle.com/building-estimation-step-by-step-in-excel-sheet/ 39/39

You might also like