You are on page 1of 18

Nepal Electricity Authourity

Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Chaitra
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 1 0:01:00 U/F
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 1 1 0:02:00
1.5 132 kV Matatirtha
1.6 132/66 KV ,45 MVA Trf. 1 1 1 0:01:00
1.7 132/66 kV ,45 MVA Trf. 2 0
1.8 66 KV Kulekhani-1-1 1 1 0:04:00
1.9 66 KV Kulekhani-1-2 1 1 0:04:00
1.10 66 KV Parwanipur-1 1 1 0:02:00
1.11 66 KV Parwanipur-2 0
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 0 0:14:00
2 Bharatpur Substation 0
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 1 1 0:02:00
2.3 132 kV Bardghat 0
2.4 132 kV Hardi 3 3 0:06:00
2.5 132/33 kV, 30 MVA Trf.-1 1 1 0:02:00
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 22.5 MVA Trf.-1 0
2.8 132/11 kV, 22.5 MVA Trf.-2 1 1 0:02:00
2.9 33 kV Capaciter Bank 0
Sub-total 0 ` 0:12:00
3 Birgunj Substation 0
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation 0
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation 0
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1 0
5.5 132/66 KV 63 MVA Trf-2 1 1 0:05:00
5.6 132/66 KV 63 MVA Trf-3
5.7 66 KV Birganj-1 0
5.8 66 KV Birganj-2 0
5.9 132/11KV,22.5 MVA Trf. -1 2 2 0:10:00
5.1 132/11KV,22.5 MVA Trf. -2
5.11 132/11KV,22.5 MVA Trf. -3 2 2 0:10:00
5.12 66 k V Hetauda-1 0
5.13 66 k V Hetauda-2 0
Sub-total 0 0:25:00
6 Amlekhgunj Substation 0
6.1 66 kV Incomer 0 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation 0
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation 0
8.1 132 kv Hetauda 1 1 0:04:00
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0 0:04:00
9 132KV Hardi Substation 0
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 0 0:55:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Chaitra (min)
1 Hetauda Substation 0:14:00 0.01 13
2 Bharatpur Substation 0:12:00 0.01 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:25:00 0.02 13
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:04:00 0.00 4
9 Hardi Substation 0:00:00 0.00 4
Total 0:51:00 0:55:00 61
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Falgun
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II U/F
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 7 7 0:17:00
1.7 132/66 kV ,45 MVA Trf. 2
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 0
1.10 66 KV Parwanipur-1 4 4 0:09:00
1.11 66 KV Parwanipur-2 1 1 0:02:00
1.12 66/11 KV ,10 MVA Trf. 1 1 1 0:04:00
1.13 66/11 kV ,10 MVA Trf. 2 1 1 0:04:00
Sub-total 14 0:36:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi
2.2 132 kV Pokhara 1 1 0:02:00
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 0
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0
2.8 132/11 kV, 30 MVA Trf.-2 3 3 0:06:00
2.9 33 kV Capaciter Bank 0.00
Sub-total 4 ` 0:08:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2
5.3 132 kV Rakxual 3 3 0:06:00
5.4 132/66 KV 63 MVA Trf-1
5.5 132/66 KV 63 MVA Trf-2
5.6 132/66 KV 63 MVA Trf-3 3 3 0:05:00
5.7 66 KV Birganj-1 0
5.8 66 KV Birganj-2 0
5.9 132/11KV,22.5 MVA Trf. -1
5.1 132/11KV,22.5 MVA Trf. -2 0
5.11 132/11KV,22.5 MVA Trf. -3
5.12 66 k V Hetauda-1
5.13 66 k V Hetauda-2
Sub-total 6 0:11:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 0:55:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Falgun (min)
1 Hetauda Substation 0:36:00 0.03 13
2 Bharatpur Substation 0:08:00 0.01 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:11:00 0.01 13
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:00:00 0.00 4
9 Hardi Substation 0:00:00 0.00 4
Total 0:55:00 0:55:00 61
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Poush
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II U/F
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 1 1 0:02:00
1.7 132/66 kV ,45 MVA Trf. 2 1 1 0:02:00
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 0
1.10 66 KV Parwanipur-1 1 1 0:01:00
1.11 66 KV Parwanipur-2 0
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 3 0:05:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 1 1 0:02:00
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 1 1 0:02:00
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0
2.8 132/11 kV, 30 MVA Trf.-2 1 1 0:02:00
2.9 33 kV Capaciter Bank 0.00
Sub-total 3 ` 0:06:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1
5.5 132/66 KV 63 MVA Trf-2
5.6 132/66 KV 63 MVA Trf-3
5.7 66 KV Birganj-1 2 2 0:10:00
5.8 66 KV Birganj-2 2 2 0:09:00
5.9 132/11KV,22.5 MVA Trf. -1
5.1 132/11KV,22.5 MVA Trf. -2 1 1 0:03:00
5.11 132/11KV,22.5 MVA Trf. -3 1 1 0:03:00
5.12 66 k V Hetauda-1 1 1 0:03:00
5.13 66 k V Hetauda-2 0
Sub-total 7 0:28:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 2 2 0:04:00
33Kv/11Kv Trf 1 1 0:05:00
8.2 132 kv Pathailiya 1 1 0:03:00
8.3 132/33 kv 30 MVA Tr 0
Sub-total 4 0:12:00
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 0:51:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Poush (min)
1 Hetauda Substation 0:05:00 0.00 13
2 Bharatpur Substation 0:06:00 0.00 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:28:00 0.02 13
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.01 7
8 kamane Substation 0:12:00 0.00 4
9 Hardi Substation 0:00:00 0.00 4
Total 0:39:00 0:51:00 61
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Poush
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 1 1 0:05:00 U/F
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 0
1.7 132/66 kV ,45 MVA Trf. 2 0
1.8 66 KV Kulekhani-1-1 1 1 0:03:00
1.9 66 KV Kulekhani-1-2 0
1.10 66 KV Parwanipur-1 0
1.11 66 KV Parwanipur-2 0
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 2 0:08:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 2 2 0:02:00
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 0
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0
2.8 132/11 kV, 30 MVA Trf.-2 0 0.00
2.9 33 kV Capaciter Bank 0.00
Sub-total 2 ` 0:02:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 5 5 0:09:00
5.4 132/66 KV 63 MVA Trf-1 1 1 0:05:00
5.5 132/66 KV 63 MVA Trf-2 2 2 0:10:00
5.6 132/66 KV 63 MVA Trf-3 3 3 0:10:00
5.7 66 KV Birganj-1 0
5.8 66 KV Birganj-2 0
5.9 132/11KV,22.5 MVA Trf. -1 2 2 0:06:00
5.1 132/11KV,22.5 MVA Trf. -2 0
5.11 132/11KV,22.5 MVA Trf. -3 0
5.12 66 k V Hetauda-1 0
5.13 66 k V Hetauda-2 0
Sub-total 13 0:40:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 0:50:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Poush (min)
1 Hetauda Substation 0:08:00 0.01 13
2 Bharatpur Substation 0:02:00 0.00 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:40:00 0.03 13
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:00:00 0.00 4
9 Hardi Substation 0:00:00 0.00 4
Total 0:50:00 0:50:00 61
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Mangsir
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 0
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 3 3 0:10:00
1.7 132/66 kV ,45 MVA Trf. 2 3 3 0:16:00
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 0
1.10 66 KV Parwanipur-1 3 3 0:08:00
1.11 66 KV Parwanipur-2 0
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 9 0:34:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 2 2 0:02:00
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 0
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0
2.8 132/11 kV, 30 MVA Trf.-2 0 0.00
2.9 33 kV Capaciter Bank 0.00
Sub-total 2 ` 0:02:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1 0
5.5 132/66 KV 63 MVA Trf-2 1 1 0:02:00
5.6 132/66 KV 63 MVA Trf-3 1 1 0:02:00
5.7 66 KV Birganj-1 1 1 0:05:00
5.8 66 KV Birganj-2 0
5.9 132/11KV,22.5 MVA Trf. -1
5.1 132/11KV,22.5 MVA Trf. -2 1 1 0:07:00
5.11 132/11KV,22.5 MVA Trf. -3
5.12 66 k V Hetauda-1 0
5.13 66 k V Hetauda-2 0
Sub-total 4 0:16:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 0:52:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Mangsir (min)
1 Hetauda Substation 0:34:00 0.02 13
2 Bharatpur Substation 0:02:00 0.00 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:16:00 0.01 13
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:00:00 0.00 4
9 Hardi Substation 0:00:00 0.00 4
Total 0:52:00 0:52:00 61
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Kartik
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 0
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 2 2 0:05:00
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 0
1.7 132/66 kV ,45 MVA Trf. 2 1 1 0:06:00
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 2 2 0:07:00
1.10 66 KV Parwanipur-1 0
1.11 66 KV Parwanipur-2 0
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 5 0:18:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 1 1 0:02:00
2.3 132 kV Bardghat 2 2 0:04:00
2.4 132 kV Hetauda 0 0
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0
2.8 132/11 kV, 30 MVA Trf.-2 0 0.00
2.9 33 kV Capaciter Bank 0.00
Sub-total 3 ` 0:06:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1 0
5.5 132/66 KV 63 MVA Trf-2 0
5.6 132/66 KV 63 MVA Trf-3 2 2 0:12:00
5.7 66 KV Birganj-1 0
5.8 66 KV Birganj-2 0
5.9 132/11KV,22.5 MVA Trf. -1 4 0:31:00
5.1 132/11KV,22.5 MVA Trf. -2 0
5.11 132/11KV,22.5 MVA Trf. -3
5.12 66 k V Hetauda-1 1 1 0:05:00
5.13 66 k V Hetauda-2 0
Sub-total 3 0:48:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 1:12:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Kartik (min)
1 Hetauda Substation 0:18:00 0.01 13
2 Bharatpur Substation 0:06:00 0.00 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:48:00 0.03 12
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:00:00 0.00 3
9 Hardi Substation 0:00:00 0.00 4
Total 1:12:00 1:12:00 59
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Ashoj
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 0
1.2 132 kV Bharatpur 0
1.3 132 kV Pathalaiya-1 1 2 3 0:06:00
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 3 3 0:06:00
1.6 132/66 KV ,45 MVA Trf. 1 1 1 0:02:00
1.7 132/66 kV ,45 MVA Trf. 2 0
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 1 1 0:02:00
1.10 66 KV Parwanipur-1 2 3 5 0:10:00
1.11 66 KV Parwanipur-2 3 1 4 0:08:00
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 17 0:34:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0 1 1 0:01:00
2.2 132 kV Pokhara 2 4 6 0:06:00
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 0 1 1 0:01:00
2.5 132/33 kV, 30 MVA Trf.-1 0 1 1 0:01:00
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 1 0 1 0:01:00
2.8 132/11 kV, 30 MVA Trf.-2 0 0.00
2.9 33 kV Capaciter Bank 0.00
Sub-total 10 ` 0:10:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1 0
5.5 132/66 KV 63 MVA Trf-2 0
5.6 132/66 KV 63 MVA Trf-3 0
5.7 66 KV Birganj-1 0
5.8 66 KV Birganj-2 0
5.9 132/11KV,22.5 MVA Trf. -1
5.1 132/11KV,22.5 MVA Trf. -2 1 1 0:05:00
5.11 132/11KV,22.5 MVA Trf. -3
5.12 66 k V Hetauda-1 2 2 0:07:00
5.13 66 k V Hetauda-2 0
Sub-total 3 0:12:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 0:56:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Ashoj (min)
1 Hetauda Substation 0:34:00 0.02 13
2 Bharatpur Substation 0:10:00 0.01 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:12:00 0.01 12
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:00:00 0.00 3
9 Hardi Substation 0:00:00 0.00 4
Total 0:56:00 0:56:00 59
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: Bhadra
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 0
1.2 132 kV Bharatpur 1 1 0:02:00
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 0
1.7 132/66 kV ,45 MVA Trf. 2 0
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 1 1 0:02:00
1.10 66 KV Parwanipur-1
1.11 66 KV Parwanipur-2 1 1 0:05:00
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 3 0:09:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 0
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 0
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0 0.00
2.8 132/11 kV, 30 MVA Trf.-2 0 0.00
2.9 33 kV Capaciter Bank 0.00
Sub-total 0 ` 0:00:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1 4 4 0:08:00
5.5 132/66 KV 63 MVA Trf-2 4 4 0:08:00
5.6 132/66 KV 63 MVA Trf-3 4 4 0:08:00
5.7 66 KV Birganj-1 2 2 0:04:00
5.8 66 KV Birganj-2 3 3 0:06:00
5.9 132/11KV,22.5 MVA Trf. -1 1 3 4 0:08:00
5.1 132/11KV,22.5 MVA Trf. -2 1 4 5 0:10:00
5.11 132/11KV,22.5 MVA Trf. -3 1 3 4 0:08:00
5.12 66 k V Hetauda-1 1 1 0:02:00
5.13 66 k V Hetauda-2 0
Sub-total 31 1:02:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 0
8.3 132/33 kv 30 MVA Tr 0
Sub-total 0
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 1:11:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation Bhadra (min)
1 Hetauda Substation 0:09:00 0.01 13
2 Bharatpur Substation 0:00:00 0.00 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 1:02:00 0.04 12
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.00 7
8 kamane Substation 0:00:00 0.00 3
9 Hardi Substation 0:00:00 0.00 4
Total 1:11:00 1:11:00 59
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.
Nepal Electricity Authourity
Transmission Directored
Hetauda grid Division,Hetauda
Availability Schedule : 1 A
Year: 2078 Month: shrawan
Total Outage
Total Frequency of Tripping Duration (min)
Brek. Tripping
S.No. Feeder O/C E/F Dist. Diff. Other Total Down Remarks
1 Hetauda Substation
1.1 132 kV Kulekhani II 0 0
1.2 132 kV Bharatpur 1 1 0:03:00
1.3 132 kV Pathalaiya-1 0
1.4 133 kV Kamane 0
1.5 132 kV Matatirtha 0
1.6 132/66 KV ,45 MVA Trf. 1 0
1.7 132/66 kV ,45 MVA Trf. 2 0
1.8 66 KV Kulekhani-1-1 0
1.9 66 KV Kulekhani-1-2 0
1.10 66 KV Parwanipur-1 3 2 5 0:12:00
1.11 66 KV Parwanipur-2 0
1.12 66/11 KV ,10 MVA Trf. 1 0
1.13 66/11 kV ,10 MVA Trf. 2 0
Sub-total 6 0:15:00
2 Bharatpur Substation
2.1 132 kV Marsyangdi 0
2.2 132 kV Pokhara 2 2 0:02:00
2.3 132 kV Bardghat 0
2.4 132 kV Hetauda 0
2.5 132/33 kV, 30 MVA Trf.-1 0
2.6 132/33 kV, 30 MVA Trf.-2 0
2.7 132/11 kV, 30 MVA Trf.-1 0 0.00
2.8 132/11 kV, 30 MVA Trf.-2 0 0.00
2.9 33 kV Capaciter Bank 0.00
Sub-total 2 ` 0:02:00
3 Birgunj Substation
3.1 66 KV Circuit-1 0 0.00
3.2 66 KV Circuit-2 0 0.00
3.3 66/33KV,10/12.5MVA Trf.-1 0 0.00
3.4 66/33KV,10/12.5MVA Trf.-2 0 0.00
3.5 66/11KV,30MVA Trf.-1 0 0.00
3.6 66/11KV,30 MVA Trf.-2 0 0.00
3.7 33 K V capaciter Bank-1 0 0.00
3.8 33 K V capaciter Bank-2 0 0.00
Sub-total 0 0.00
4 Simara Substation
4.1 66/11KV,15MVA Trf. 1 0
4.2 66/11KV,15 MVA Trf.-2 0
0
Sub-total 0 0.00
5 Parwanipur Substation
5.1 132 kV Pathlaiya-1 0
5.2 132 kV Pathlaiya-2 0
5.3 132 kV Rakxual 0
5.4 132/66 KV 63 MVA Trf-1 5 5 0:09:00
5.5 132/66 KV 63 MVA Trf-2 5 5 0:12:00
5.6 132/66 KV 63 MVA Trf-3 4 4 0:09:00
5.7 66 KV Birganj-1 2 2 0:04:00
5.8 66 KV Birganj-2 2 2 0:04:00
5.9 132/11KV,22.5 MVA Trf. -1 0
5.1 132/11KV,22.5 MVA Trf. -2 0
5.11 132/11KV,22.5 MVA Trf. -3 0
5.12 66 k V Hetauda-1 1 1 0:02:00
5.13 66 k V Hetauda-2 0
Sub-total 19 0:40:00
6 Amlekhgunj Substation
6.1 66 kV Incomer 0.00
6.2 66/11KV,7.5MVA Trf 0 0.00
Sub-total 0 0.00
7 132KV Pathalaiya Substation
7.1 132 kv Hetauda-1 0 0.00
7.2 132 kv Hetauda-2 0 0.00
7.3 132 kv Parwanipur-1 0 0.00
7.4 132 kv Parwanipur-2 0 0.00
7.5 132 kv Chapur-1 0 0.00
7.6 132 kv Chapur-2 0 0.00
7.7 132/11 kV18/ 22.5 MVA 0 0.00
Sub-total 0 0.00
8 132KV Kamane Substation
8.1 132 kv Hetauda 0
33Kv/11Kv Trf 0
8.2 132 kv Pathailiya 3 3 0:15:00
8.3 132/33 kv 30 MVA Tr 0
Sub-total 3 0:15:00
9 132KV Hardi Substation
9.1 132 kv Hetauda 0
9.2 132 kv Bharatpur 0
9.3 132/33 kv 30 MVA Tr-1 0
9.4 132/33 kv 30 MVA Tr-2 0
Sub-total 0 0.00
Grand Total 1:12:00
* Only 132/66 kV, feeders (including transformer bays) shall be considered.
Schedule : 1 B
Year: 2078 PA Period:
No. of days in PAP: d S/S Outage
Factor (OS)
Total No. of
Total Outage Duration in the Month (min) duration Feeders
Substation shrawan (min)
1 Hetauda Substation 0:15:00 0.01 13
2 Bharatpur Substation 0:02:00 0.00 9
3 Birgunj Substation 0:00:00 0.00 8
4 Simara Substation 0:00:00 0.00 2
5 Parwanipur Substation 0:40:00 0.03 12
6 Amlekhgunj Substation 0:00:00 0.00 1
7 Pathalaiya Substation 0:00:00 0.01 7
8 kamane Substation 0:15:00 0.00 3
9 Hardi Substation 0:00:00 0.00 4
Total 0:57:00 1:12:00 59
Availability A = (1-OF) X 100 100.00 OF 0.00
Outage Factor for S/S OS = TD/60/d/24/m
Outage Factor OF = T / n
n - No. of substations
m - No. of Feeders in the given S/S
Schedule : 1 A shall be prepared for each month.
Schedule : 1 B shall be Prepared for each Performance Audit Period.

You might also like