1.0 PURPOSE
The purpose of this procedure is to establish the activities, the responsibilities and the general
requirements for conducting Management Review of established management system
2.0 SCOPE
This procedure covers the review meetings conducted by Top Management related to the Integrated
Management System performance. The regular agenda for Management Review are prescribed in
section below.
3.1 Definitions
Management Review: A formal review meeting conducted at least once a year by Top
Management to check that the established management system is effective in meeting customer
and business requirements.
Minutes of Management Review: a quality record containing the documented details of the output
of the Management Review and distributed to all concerned process heads for proper actions as
applicable.
3.2 Abbreviations
4.0 GENERAL
The schedule of review of the above minimum agenda may be staggered within a calendar year.
Management Review Team Composition: the regular participants to the conduct of Management Review
are the following officials:
1. General Manager
2. Project Manager
3. Operations Manager
4. Administrative Head
5. Equipment Supervisor
6. Quality Control Head
7. Purchasing Officer
8. Personnel Officer
Doc. Code : PM-RNI-04
Rev. No. : 0
PROCEDURES MANUAL Eff. Date :
Page : 4 of 6
TITLE:
MANAGEMENT REVIEW
5.0 PROCEDURE
Procedure Outline
Procedure Details
QMR 1. Assign somebody who will take the minutes of Attendance Sheet
meeting. Get the Attendance of the meeting
2. Declare the review meeting open and call the meeting
General Manager to order
3. Discuss the prepared inputs in accordance to sequence All Participants
of presentation
QMR/ Presenters 4. Suggest improvements as necessary
5. Declare the meting close after all agenda items have
been discussed.
All Participants 6. Ensure the improvement and corrective actions are
determined, agreed upon and documented.
General Manager
Note: Copy of minutes of review meeting shall be distributed
to all participants.
QMR
Note: The Management Review minutes is a quality record
and shall be controlled in accordance to Records Control Document Controller
procedures (PM-RNI-02)
QMR 1. Follow-up the required actions from responsible persons Concerned Process
until satisfactory closeout. Heads
Note: Special meetings may be conducted to ensure the
status of each improvement actions
1. Attendance Sheet