3.

10 Installation manpower (설치 인력)

NO. Description Checking by Client

The skilled technicians and assistants should be ready as below.


10 Yes □ No □
(변압기 설치 경험이 있는 숙련공 및 보조인원이 현장에 투입되어야 한다.)

Detail Manpower
<NOTE>
※ Skilled technicians means that he
Initial Inspection Skilled technician 2
Assistant 2
has experiences of transformer
Installation minimum 5 years.
숙련공은 최소 5년 이상의 변압기
Skilled technician 4 설치 경력이 있는 작업자를 의미한다.
Parts Assembly Assistant 4
Electrician 2

<Client comment>
BCT & Bushing Test Skilled technician 2
prior to vacuum Assistant 3

Internal Lead Skilled technician 2


Connection &
Assemble gas pipes Assistant 2

Vacuum & Oil Filling &


Operator 3
Oil Circulation Assistant 3
*24 hour/day operation
(24시간 운용)

Testing
2
Site testing technician
2
Assistant

Global Top Energy Solution Provider 16


Attachment (첨부)
Required tool & equipment list for Installation
변압기 설치 시 필요 공구 및 장비 리스트
The required tool and equipment - 1
(Initial Inspection & Assembly stage)

Preparation
No Description & specification Quantity Reference picture
Check

Crane : 30 ton
1 1 Yes □ / No □
Capacity can be changed by Installation condition

Shackle 4 per
2 Yes □ / No □
Working Load : 1ton, 3ton, 5ton each size

Lifting belt (=Lashing sling)


2 per
3 Length : 1M, 2M, 3M, 6M, 12M Yes □ / No □
each size
(Width should be more than 25mm)

Chain block 1 per


4 Yes □ / No □
1ton, 3ton, 5 ton each size

Regulator (with hose & adapter)


5 1 Yes □ / No □
For dry air injection

Pressure gauge

6 To check pressure in transformer 1 Yes □ / No □


(0 ~ 1.0 kgf/㎠)

Spanner 4 per
7 Yes □ / No □
17", 19", 22", 24", 27", 30" each size

Ratchet wrench 4 per


8 Yes □ / No □
17 ~ 30mm each size

HYOSUNG DOCUMENT : Published on 1st.Feb.2015 by Transformer Field Service Team