QUALITY CONTROL
PHR
RDP
SM
NO ACTIVITY/PROCESS DESCRIPTION QUALITY CONTROL ACTIVITY ACCEPTANCE CRITERIA
PROCEDURE REFERENCE
1.1 Review all technical specification, drawing, procedures & work instruction Review Service Request AFC Drawing , Client Spec, Contract Document R R R/A
1.2 All tech. spec, procedures, work instruction shall be clarified, understood & implemented Review Scope of Work R R R/A
1.3 Finalise deviation, generate new procedure and work instruction if required Review Drawing , Tech. Spec R R R/A
2.1 Verification instrument and inspection Review/Calibration certificate Best Practice Valid Calibration Instrument R R R/A
2.2 Survey and stake out location elevation and coordinate Review/Survey report Best Practice IFC Drawing W SW/R R/A
2.3 Stake out survey MudPit Survey Report Best Practice Meet to AFC Drawing SW/R SW/R A
3.1 Verification instrument and inspection Review/Calibration certificate Best Practice Valid Calibration Instrument R R R/A
3.2 Survey and stake out location elevation and coordinate Review/Survey report Best Practice IFC Drawing W SW/R R/A
4.0 EARTHWORK
4.1 Clearing & grubbing Inspection Report Best Practice Base on stake out survey SW SW/R SW
4.2 Quality of Soil filling Laboratory Test Report Laboratory Test Acceptable/approved material ( Soil Properties ) W SW/R SW
4.3 Soil filling and compaction per layer Visual inspection Base on steak out survey elevation, Filling & compaction per SW W SW
Best Practice
layer thk;30 cm, Compaction test:
-Bettom Layer to Top Layer that >1 meter, Testing per 1
meter
-Bettom Layer -1 meter to Top Layer , Testing per 30 cm
4.4 Density Test ( if any ) Testing Report ASTM D 1556 Min Compaction 90 % of MDD for Pad Area W SW/R SW
Min Compaction 92 % of MDD for Tx-Pad
4.5 DCP Test Testing Report Meet To approved drawing Meet to AFC Drawing (CBR > 6 %) W W SW
SIGN
SIGN
QUALITY CONTROL
PHR
RDP
SM
NO ACTIVITY/PROCESS DESCRIPTION QUALITY CONTROL ACTIVITY ACCEPTANCE CRITERIA
PROCEDURE REFERENCE
9.1 Dismantling Cellar Box Inspection Report SOP Lifting Plan Clear from Cellar Box SW/IR SW/R SW/A
9.2 Dismantling Rig Structure Inspection Report SOP Lifting Plan Clear from Rig structure SW/IR SW/R SW/A
9.3 Dress up After Rig Release Inspection Report Base Practice Meet to AFC Drawing SW/IR SW/R SW/A
11 Final Inspection
11.1 Punch list and close out Inspection & Report Base Practice All punchlist clear W/P W/R R/A
11.2 Mechanical Completion Review hand over document Base Practice Approved by PHR P R R/A
PT.RIFANSI DWI PUTRA QA/QC PT.SM QA/QC PT. PERTAMINA HULU ROKAN
SIGN
SIGN
WO NO = RDP 25
INSPECTION & TEST PLAN DISCIPLINE = EARTHWORK
Road and Location Minas Infill P01(4C-45), Minas DOCUMENT NO = WUR E-QAC-ITP-EW-019
Infill P02 (2D-83, Minas Infill P03 (8E-53)
LEGEND:
"H" = HOLD POINT " W " = WITNESS INSPECTION " SW " = SPOT WITNESS "P" = PREPARE
"A" = APPROVAL DOCUMENT " R " = REVIEW AND COMMENT " D " = VERIFICATION BY REPORT " IR " = ISSUED REPORT
SIGN
SIGN
SIGN
QUALITY CONTROL QUALITY CONTROL
PHR
RDP
SM
NO ACTIVITY/PROCESS DESCRIPTION ACCEPTANCE CRITERIA
ACTIVITY PROCEDURE REFERENCE
1.1 Review all technical specification, drawing, procedures & work instruction Review Service Request AFC Drawing , Client Spec, Contract Document R R R/A
1.2 All tech. spec, procedures, work instruction shall be clarified, understood & implemented Review Scope of Work R R R/A
1.3 Finalise deviation, generate new procedure and work instruction if required Review Drawing , Tech. Spec R R R/A
2.0 MATERIAL
2.1 Soil Properties ( if any )
- Aterberg Limit Laboratory Test Report ASTM D 4318 LL max = 40 & PI max = 25 W/IR W/R R/A
- Sieve Analys Laboratory Test Report ASTM D 422 6-inch square passing 100 % W/IR W/R R/A
3/4-inch square passing minimum 70%
- Spesivic Gravity Laboratory Test Report ASTM D 854 -58 W/IR W/R R/A
- Proctor and Mousture Content Laboratory Test Report ASTM D 1557 - 70 W/IR W/R R/A
3.1 Verification instrument and inspection Review/Calibration certificate Base Practice Valid Calibration Instrument R R R/A
3.2 Survey and stake out location elevation and coordinate Review/Survey report Base Practice IFC Drawing W SW/R R/A
4.0 EARTHWORK
4.1 Clearing & grubbing Inspection Report Base Practice Base on stake out survey SW SW/R SW
4.2 Quality of Soil filling Laboratory Test Report Laboratory Test Acceptable/approved material ( Soil Properties ) W SW/R SW
4.3 Soil filling and compaction per layer Visual inspection Base on steak out survey elevation, Filling & compaction per SW W SW
Base Practice layer thk;30 cm, Compaction test:
-Bettom Layer to Top Layer that >1 meter, Testing per 1
meter
-Bettom Layer -1 meter to Top Layer , Testing per 30 cm
4.4 Density Test ( if any ) Testing Report ASTM D 1556 Min Compaction 90 % of MDD for Pad Area W SW/R SW
Min Compaction 92 % of MDD for Tx-Pad
4.5 DCP Test Testing Report Meet To approved drawing Meet to AFC Drawing (CBR > 6 %) W W SW
SIGN
SIGN
SIGN
QUALITY CONTROL QUALITY CONTROL
PHR
RDP
SM
NO ACTIVITY/PROCESS DESCRIPTION ACCEPTANCE CRITERIA
ACTIVITY PROCEDURE REFERENCE
WO NO = RDP 25
INSPECTION & TEST PLAN DISCIPLINE = EARTHWORK
Road and Location Minas Infill P01(4C-45), Minas DOCUMENT NO = WUR E-QAC-ITP-EW-019
Infill P02 (2D-83, Minas Infill P03 (8E-53)
LEGEND:
"H" = HOLD POINT " W " = WITNESS INSPECTION " SW " = SPOT WITNESS "P" = PREPARE
"A" = APPROVAL DOCUMENT " R " = REVIEW AND COMMENT " D " = VERIFICATION BY REPORT " IR " = ISSUED REPORT
SIGN
SIGN
SIGN
QUALITY CONTROL QUALITY CONTROL
PHR
RDP
SM
NO ACTIVITY/PROCESS DESCRIPTION ACCEPTANCE CRITERIA
ACTIVITY PROCEDURE REFERENCE
9.1 Dismantling Cellar Box Inspection Report SOP Lifting Plan Clear from Cellar Box SW/IR SW/R SW/A
9.2 Dismantling Rig Structure Inspection Report SOP Lifting Plan Clear from Rig structure SW/IR SW/R SW/A
9.3 Dress up After Rig Release Inspection Report Base Practice Meet to AFC Drawing SW/IR SW/R SW/A
11 Final Inspection
11.1 Punch list and close out Inspection & Report Base Practice All punchlist clear W/P W/R R/A
11.2 Mechanical Completion Review hand over document Base Practice Approved by PHR P R R/A
PT.RIFANSI DWI PUTRA QA/QC PT.SM QA/QC PT. PERTAMINA HULU ROKAN
Document No :
Date:
OWNER
PT. PERTAMINA HULU ROKAN
PROJECT TITLE
Construction Services
WO NO : RDP 25
WUR-QAC-WP-EW-019
WORK PROCEDURE
Date:
OWNER
PT. PERTAMINA HULU ROKAN
PROJECT TITLE
Construction Services
WO NO : RDP 25