Executive Summary - Nokan 3 PLN
Executive Summary - Nokan 3 PLN
SUMMARY
PT Wilwatikta Pusaka Energi is a company founded in Jakarta with the intention to develop renewable
energy potency in Indonesia.
The project highlight of PT Wilwatikta Pusaka Energi is the Nokan 3 MHPP, located in Kemumu
Village, Arma Jaya Sub-District, North Bengkulu Regency, Bengkulu Province, with planned capacity
of 5 MW and estimated plant factor of 66.41%.
PT. Bangkahulu Kapindho Energi has undertook the Pre-Feasibility Study (Pre-FS) to ensure the site is
potentially feasible to be developed as an MHPP in an Independent Power Producer (IPP) project, and
currently in-depth Feasibility Study is being developed by Indokoei International.
As of date, “Izin Prinsip” by the Regent of Bengkulu Utara, “Rekomendasi Teknis Kepala Dinas
Kehutanan Survey Pemetaan Dinas Kehutanan” by local Forestry Service, and “Rekomendasi Gubernur
untuk Pembangunan PLTMH” has been issued to PT Bangkahulu Kapindho Energi. Currentlly
AMDAL is ongoing.
Page 1 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Page 2 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Page 3 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
LOCATION
The potential location of Nokan 3 Mini Hydro Power Plant (MHPP) was identified in Kemumu Village,
Arma Jaya Sub-District, North Bengkulu Regency, Bengkulu Province harnessing hydro-potential of
Nokan River. It is about 60 km from Bengkuku City which can be reached approximately 2-3 hours by
car.
02 der 16 min 52.97 det E; 3 der 23 min 16.91 det S
Downstream 102 der 16 min 29.21 det E; 3 der 23 min 58.38 det S
Page 4 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Page 5 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
SITE CONDITION
Page 6 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
HYDROLOGY
The methods applied to estimate long-term daily discharge is the catchment area and rainfall ratio based
on the discharge data of Air Ketahun River at Air Ketahun Tunggang AWLR Station. The data is
available for a period of 7 years, which is between 1994 and 2012. Then, it was checked and compared
with the discharge estimated by using NRECA (National Rural Electric Cooperative Association) and
FJ Mock Method based on rainfall data of Kurotidur, Argamakmur and Baturoto Station. The discharge
data from the AWLR station was transferred to the weir of Nokan 3 MHPP by applying catchment ratio
of 0.103 (100 km2/968.8 km2) and annual rainfall ratio of 1 since they are located in the similar rainfall
contour (4,000 mm).
The Flow Duration Curve (FDC) of the Nokan 3 MHPP site is established and used for power
generation planning and production energy simulation together with optimization of development
scheme. The figure below shows FDC of daily discharge of Nokan 3 MHPP based on the low flow
analysis.
Page 7 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Discharge
FDC of Nokan-3 MHPP Probability 3
40
(m /sec)
10% 13.06
35
20% 9.17
30
3/sec)
30% 7.37
25
39% 6.69
Discharge (m
20 40% 6.58
15 50% 5.90
10 Annual Average = 6.69 m3/sec
60% 5.02
5 70% 4.07
0
80% 3.17
0 10 20 30 40 50 60 70 80 90 100 90% 2.22
Probability (%) 100% 0.44
Page 8 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Flood discharge has been analyzed by Unit Nakayasu Hydrograph and checked by Creagrer’s Curve.
Estimated flood discharge for 10, 50, and 100 years return period is 349 m3/sec, 459 m3/sec, and 509
m3/sec.
Page 9 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
POWER GENERATION
The MHPP is designed with 2 x 2.50 MW or 5.00 MW in total, based on the maximum design discharge
of 6.69 m3/sec at 39 % probable discharge by applying Francis type Turbine. This plan is harnessing
effective head of 100 m. After considering additional discharge for ecological flow at 0.67 m3/sec, the
average gross annual energy production of Nokan 3 MHPP is approximately 29.41 GWh with plant
factor (PF) at 66.41%.
NOKAN-3 MHPP
Installe d Capacity 5.000 MW Required Discharge (39%) = 6.69 m3/sec Min. operation discharge (40% Qd) = 1.34 (m3/s)
(2 x 2.50 ) MW Qd (turbine 1 & 2) = 3.35 m3/sec Eco discharge (m3/s) = 0.67 (m3/s)
Head = 85 m
Page 10 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
DESIGN SUMMARY
No Item Unit Alternative-1
1 Hydrological Conditions
Catchment area Sq.km 100
Annual mean rainfall Mm 4,456
Annual mean discharge Cu.m/ 6.96
sec
50-year peak flood Cu.m/ 459
sec
100-year peak flood Cu.m/ 509
sec
2 Hydropower Planning
Max. plant/design discharge Cu.m/ 6.69
sec
Min. plant/design discharge Cu.m/
sec
Normal water level at weir M 456.5
Normal water level at head M 454.1
tank/ pond
Axis Turbine M 470
Gross head M 87.54
Net head M 85.00
Page 11 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Installed capacity MW 5
Number of unit 2
Unit capacity MW 2 x 2.5
Plant factor % 66.41
Gross Annual Energy GWh 29.41
3 Main Structures
A. WEIR
Coordinate 3023’16.91”S and 102016’52.97”E
Type Concrete
Dimension M B = 30 and h = 4
Crest Elevation m 560
Crest Type Ogee Type
Stilling Basin Type USBR Type II
B. INTAKE GATE
Type Steel Slide
Dimension (Gate) M 2 x (1 m x 2.4 m)
C. SETTLING
BASIN/SAND TRAP
Dimension M Length = 41 m and width = 5.5 m
D. WATERWAY
Type Concrete canal
Length M 2,000
Dimension M 3 x 1.7
Page 12 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Page 13 of 14
PT. WILWATIKTA PUSAKA ENERGI
NOKAN 3 MHPP Project
Head Tank
Weir Intake Channel De-silting Basin Waterway Channel B=7m Penstock Powerhouse Tailrace
B = 30 m B = 5.5 m L = 2000 m L = 26 m L = 400 m
B=2x2m L = 41 m i = 0.8/1,000 H= 3 m
H = 1.6 m H=4m
Weir Crest Tras hracks
EL.560 Side Spillway Anchor Blocks @ 100 m approx.
EL. 557.54
Designed FSWL is 557.54 m at Head Tank
Typical W aterway
Turbine Center
River Bed EL. 470 m
H = 1.71
EL. 556 +
Sand Flush Gate
Leveling
1 m x 2.4 m B=3m
Steel Penstock f 1 .7 m
Concrete 1.00 m
f 1 .7 m TWL. 468 m
2 branches
from f 1.2 m
Hydrological Features Initial Assumption of the Salient Features
3
(1) Catchment Area 85.00 km2 (1) Max. Design Discharge 6.69 m /s
(2) Annual Rainfall 3,952 mm (2) Riverbed Level at Intake Weir 452.50 m
(3) Mean Discharge 6.69 m3/s (3) Hight of Intake Weir 4.00 m
(4) Crest of Intake Weir 560.00 m
(4) 10-year Flood Discharge 349.00 m3/s (5) Full Supply Water Level at Head Tank 557.54 m
(5) 50-year Flood Discharge 459.00 m3/s (6) Turbine Center EL. 470.00 m
(6) 100-year Flood Discharge 509.00 m3/s (7) Tail Water Level 468.00 m
(8) Gross & Net Head 87.54 85.00 m
(9) Numbers of Turbine Unit 2
(10) Power output per unit 2.50 kW
(11) Power output in total 5.00 kW
35 350
300
Discharge (m3/sec)
Page 14 of 14