seminar
No. of Man-days / Participants-hours x workshop
✓
x
Half-day x field trip / field work
x
ATTENDANCE: x
x
- MMDA x
- JD PANLAQUI
- MAC BUILDERS x
x
x
UPDATES: x
Rehabilitation and Landscaping of Line Drainage x Canal
x
The project will cover the whole stretch from Faura Outfall to Abad Outfall wherein vigan tiles will be
x
lay out, concrete covers (2.5m x 1m) and steel grating (1m x 1m) will be fabricated and install.
x
MAC Builders HDPE pipe laying for FauraxOutfall, specifically the movement of heavy equipment on
Sta. 300-500, caused damages on the secondary
x drainage canals constructed by JD Panlaqui
Construction. x
MAC Builders has agreed to repair the areaxfor the damages because of their operation.
JD Panlaqui informed the group that the works
x of MAC Builder may have caused delay to the
completion of line drainage canal. x
MMDA and MBCO agreed that MBCO willx coordinate with DPWH with regards to the damages and
operations on the area. x
JD Panlaqui will continue the works from Faura
x to Remedios Outfall.
x
Plugging of Illegal Pipes x
MMDA required MBCO for the exact number x of illegal pipes/outfalls that needs to be plugged.
x
x
Vertical Garden on the three (3) outfalls along Baywalk
MMDA wants clarification for Abad Outfallx if vertical garden will be constructed on the area.
x
STP on Baywalk x
x
x
x
x
x
x
x
x
x
x
x
x
Fecal Coliform of MYC STP increased to 35,000
x ppm last 2 February 2021 based on EMB results
wherein block of solid (half coconut husk) was
x found at the suction pipeline.
Polymer line was also affected by the clogging of solid thus modifying the coagulation process,
Water supply, coming from Maynilad, has already been available since February 2021.
Booster pump will be installed for the water tank.
Discharge pipe of the cistern going to Manila Bay has leak.
Tertiary Treatment is on trial process awaiting the results from EMB.
No strainer was installed before the suction pump or along suction pipeline.
Conveyor belt with filter press for sludge has not been used since operations started.
Brown scum was visible nearby the discharge point.
Clearing, Grubbing, Desilting and Disposal of Submerged Garbaged of Parañaque River System
MMDA and MBCO inspected the Parañaque River but MBCO wants priority esteros/creeks along
Parañaque River.
MBCO will provide list for esteros and creeks along the river.
AGREEMENTS:
MAC Builders will repair the area for damages that their works has caused.
MMDA wants a copy for contract agreement between JD Panlaqui and Triple 8 Construction and
Supply, Inc. and the billing for the water line.
MBCO suggested to plug almost thirty (30) illegal pipes/outfalls along Baywalk.
Y-Strainer should be installed along the suction pipeline, and pressure gauges should also be installed
to monitor and protect the pump. If the cost of Y-strainers will not fit within the budget, at least a
pump strainer should be installed.
Additional treatment must be installed to prevent any unforeseen problem/s in the main treatment
process ensuring the water quality discharging into the Manila Bay is within the standards of DAO
2016-08.