Instruction: Using the completed BE Form 01: Physical Facilities Needs Assessment as basis, summarize the resources (materials and manpower) needed and list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks columns should be updated
regularly to determine progress in acquiring resources needed.

Key
Strategies/Plan of
Materials Needed Quantity Persons/Organization to Person Responsible Status Remarks
Action
be Tapped

Apo Cement 120 bags PTA/ SGC School Head/ SGC President Constructed Construction of GAD comfort room is 90%

Steel Bars 12 mm 50 pcs PTA/ SGC School Head/ SGC President Constructed percent completed
Repair of SHS building is on going.
Steel Bars 10 mm 60 pcs PTA/ SGC School Head/ SGC President Constructed

Marine Plywood 12 pcs PTA/ SGC School Head/ SGC President Constructed

# 6 wire 20 meters PTA/ SGC School Head/ SGC President Constructed

PVC # 4 1 pc PTA/ SGC School Head/ SGC President Constructed

PVC # 3/4 5 pcs PTA/ SGC School Head/ SGC President Constructed

2x2x12 50 pcs PTA/ SGC School Head/ SGC President Constructed

# 4 common nails 4 kilos PTA/ SGC School Head/ SGC President Constructed

# 3 common nails 3 kilos PTA/ SGC School Head/ SGC President Constructed

Tie wire 4kilos PTA/ SGC School Head/ SGC President

GI Sheets 10 pcs PTA/ SGC School Head/ SGC President

Window glass 38 pcs PTA/ School Treasurer School Head/ School BE Coor

Portable Hand washing 2 pcs PTA/ School Treasurer School Head/ School BE Coor Installed

Rope 20 meters PTA/ School Treasurer School Head/ School BE Coor Implemented

PE Hose 50 meters PTA/ School Treasurer School Head/ School BE Coor Installed

Faucet 5 pcs PTA/ School Treasurer School Head/ School BE Coor Installed
Tee 6 pcs PTA/ School Treasurer School Head/ School BE Coor Installed

PVC Solvent 1 can PTA/ School Treasurer School Head/ School BE Coor Installed

Panel Board (4 gang) 1 PTA/ School Treasurer School Head/ School BE Coor Installed

Key
Labor Skills/Volunteers Strategies/Plan of
Quantity Persons/Organization to Person Responsible Status Remarks
Needed Action
be Tapped

Mason 5 PTA/ SGC/ School Head Ryan O. Placa / Diosdado B. Balingcos On going

Carpenter 10 Ryan O. Placa / Diosdado B. Balingcos On going

Welder 1 Ryan O. Placa / Diosdado B. Balingcos On going

Plumber 2 Ryan O. Placa / Diosdado B. Balingcos On going

Painter 10 Ryan O. Placa / Diosdado B. Balingcos On going

Prepared by: Noted:


________JULIET A. ABOYME_________________ _________RYAN O. PLACA___________
Resource Mobilization Committee Chairperson School Head