You are on page 1of 10

MIDNIGHT REPORT

REPORT NO : 14 CLIENT : SORIK MARAPI GEOTHERMAL POWER


DATE : Tuesday, August 23, 2022 WELL TYPE : DEVELOPMENT
WELL : SMP T-11 WO PROFILE : DEVELOPMENT
SPUD DATE : August 10, 2022 (10:30 WIB) RIG NAME : KAISHAN-01
DEPTH 00:00 : mMD COMPANY MAN : GATOT SUBROTO / ANWAR SAHETAPY
: mTVD IPM : -
GEOLOGIST : WISNU / TIO
PREVIOUS DEPTH 00:00 : Meter MLU ARRIVED : -
PROGRESS 24 HRS : Meter ENGINEER : EDY.S / RANDI . M
CASING 13-3/8" : 1299 mMD LOGGER : BAGUS M / WAJELA

ACTIVITY 00:00 : RIH 12" Flat Bottom Magnet + 9-5/8" Junk sub
ROTATING HRS
PRESENT BIT BHA#17 (Fishing Magnet)
24 HRS Cummulative
BIT NO : 12" Fishing Magnet 0.59 m 0.0
BIT SIZE : 9-5/8"Junk Sub 1.03 m 0.0
TFA : Bit Sub w/float valve 0.91 m 0.0
TYPE : 12-1/* stab 1.93 m 0.0
S/N : 1 Stand 8"DC 28.13 m 0.0
IADC : X/O 1.28 m 0.0
BIT 24 HRS : Hrs 1 Stand 6-1/2" DC 28.11 m 0.0
PUMP 24 HRS : Hrs 6-1/2"double pin 4-1/2" IF Box 0.27 m 0.0
BIT DATA

T. BIT HRS : Hrs 6-1/2" drilling jar 7.0 m 0.0


T. PUMP HRS : Hrs 1 Stand 6-1/2" DC 28.11 m 0.0
DEPTH IN : Meter 21 jts 5" HWDP 197.36 m 0.0
DEPTH OUT : Meter 0.0
METERAGE : Meter 0.0
0.0
0.0
0.0
0.0
BIT SIZE : 5" HWDP12.25
- M/U stinger with Inch TOTAL BHA 73 294.75 m
ROP MAX (m/hr) : m/hr SPM I :
ROP MIN (m/hr) : m/hr SPM II :
AVERAGE 24 HRS : m/hr SPM III :
AVERAGE ROP : m/hr SPM IV :
WOB : Klbs T. SPM : 0
SPP : Psi FLOW RATE : 0 GPM
D. PARAMETER

RPM/RPMM : K REV OB :
TORQUE : KlbS.ft K REV REAM :
K REV CIRC :
TOTAL KREV : 0.0
MW (PPG) ECD VIS PV YP CL- WL pH TEMP In/Out (C)
MUD

8.70 8.61 49 8 21 36,000 8 9.5 55 / 55


CSG ID OD CSG An VEL DP AN VEL DC CRIT DC P. BIT HPb/Area JET Vel BIT % L. TIME
A.VEL

28 30 - - - - - - - 3.7
Inch Inch m / min m/min m / min psi hp/inch2 m / sec Lbs Minutes

DEPTH (m) ROP


LITHOLOGY
TOP BASE MIN MAX

PT. PARAMA DATA UNIT page 1


Tuesday, August 23, 2022

FROM TO HRS ACTIVITY


RIH 12" Fishing Magnet from surface to 406.6 mMD, Tagged 3 klbs.
BHA#15 : Bit Sub (with float valve) + X/O 6 5/8" RP X 4 1/2" IF Box
- Install RRH at 262 mMD
00:00 03:00 3:00 - F/U string every 5 stands running
- Pump backside to annulus 50 gpm (Mud pump) : Well static.

Circulate hole clean with FR 600 gpm, SPP 260 psi


- Attempt to lower down with FR 600 gpm, SPP 260 psi experiencing tag 3 klbs at same depth 406.6 m
03:00 04:00 1:00 - Pull up to 404 m, Continue circulate hole.
- Stop pump, Attempt to lower down experiencing tag 3 klbs at same depth 406.6 m (Tried 3x)

POOH 12" Flat Bottom Fishing Magnet from 406.6 to surface


- Uninstall RRH at 354 mMD
04:00 05:00 1:00 - B/O & L/D 12" Flat Bottom Fishing Magnet
- Pump backside to annulus 60 gpm (Mud pump) : Well static.

Prepare & M/U 12-1/4 Bladed Junk Mill


05:00 06:00 1:00

06:00 07:00 1:00 Continue M/U bladed junk mill pull out and lay down same

P/U 5" difusser + 1 stand 5"DP, screw on TDS, perform flushing in side BOP, master valve with 300 gpm while work
07:00 08:00 1:00 pipe

P/U, M/U and RIH 12-1/4” Bladed Junk Mill from surface to 405 mMD.
- BHA #16: 9-5/8” Junk Sub + Bit Sub (with float valve) + 12-1/8” UG Stab + 3 x 8”DC + X/O 6 5/8" RP X 4 1/2" IF
Box + 3 x 6.5” DC + XO 6-1/2 IF Pin x 4-1/2 IF Pin + 6-1/2” Drilling Jar + 3 x 6.5” DC + 21 x 5” HWDP
- Found 1 jts 8"DC and 6-5/8" reg box (Jts no # 3) damaged on thread & X/O 6-5/8"pin
B/O and C/O lay down same
08:00 13:00 5:00 - Install RRH at 322 mMD
- Check Parameter : @ 380 mMD : P/U 92 Klbs, S/O : 90 Klbs

Pull of bottom to 404 mMD, wash down with FR 600 gpm / SPP 450 Psi from 404 mMD to 406.14 mMD ( Tag 8
klbs),
13:00 13:30 0:30 Reaming from 404 mMD to 409 mMD with FR 600 gpm/SPP 441 Psi/ 60 rpm/ TQ 3 - 4.4 Klbs.ft
13:00 - 13:30 Work pipe 406 - 409 mMD ( 3x)

Continue wash reaming from 409 mMD to 437 mMD with FR 600 gpm/SPP 441 Psi/ 60 rpm/ TQ 3 - 4.4 Klbs.ft
13:30 14:30 1:00

Continue RIH without pumping (normal) from 437 mMD to 753 mMD (Tag 8 Klbs)
14:30 16:00 1:30 - During RIH no Obstruction

Pull off bottom to 752.7 mMD, fill up string, continue circulate w/ FR 607 gpm/ SPP 538 Psi
- Check Parameter @ 753 mMD, P/U 120 Klbs, S/O 95 Klbs
- Attemp @ 752.7 mMD, Rotate 10 rpm, TQ 1.8 - 2.1 Klbs.ft
16:00 17:30 1:30 - Swept Hivis tandem 40 Hivis + 30 Low vis+ 40 Hivis
- Temperatur In : 50 degree C, Temperatur Out 55 degree C
- Spot 50 bbls and displace with mud 499 stroke

POOH 12-1/4” Bladed Junk Mill from 753 mMD to surface


- Pump backside to annulus 100 gpm (Mud pump) : Well static.
- Uninstall Rubber Rotating Head at 297 m.
- B/O & L/D 12-1/4" Bladed Junk Mill. (Ingauge. 10 % Worn Out around bottom mill)
17:30 21:00 3:30 - B/O 9-5/8" Junk sub & Check : Found piece of centralizer blade with length 5 cm, one nail & small amount metals in
Junk Sub.
- Sample Cutting from ditch magnet : mix cement and metal. CUMM Metal on ditch magnet : 2.551 gr.

P/U, M/U and RIH 12" Fishing Magnet + 9-5/8" Junk sub from surface to 209 mMD.
BHA #17: Bit Sub (with float valve) + 12-1/8” UG Stab + 3 x 8”DC + X/O 6 5/8" RP X 4 1/2" IF Box + 3 x 6.5” DC +
21:00 24:00 3:00 6-1/2” Drilling Jar + 3 x 6.5” DC + 21 x 5” HWDP

Total Hours 0:00

PT. PARAMA DATA UNIT page 1


Hydraulic Analysis
Annular Velocity Prss. @bit Sys HHP HHPb HHPb/area Pres. bit Jet Vel JIP JIP/area Critical DC
(ft/Min) psi hp hp hp/in2 % ft/sec lb psi (ft/Min)
Sput Date DP DC 3
8/9/2022 0 0 #DIV/0! 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 72.5

LAST DEPTH Jet Nozzle PL (psi) Component OD ID


285 28 DP 4.5 3.826
BIT HRS 8.9 185.7 DC 6.75 3.25
PUMP HRS 11.3 05:00

Note : Isi yang hitam 00:00

Biru sudah kalkulasi 17:00

LAST ECD #DIV/0!


LAST CUMM DRILL #DIV/0!
0.0 0.0 Pump Hr
0.0 0.0 Pump Hr EVERYTIME CHANGE BIT
0.0 0.0 <---BIT Input NOZZLE for TFA,Jet Vel & JIF calculation
0.0 0.0 <---BIT

0.0 0.0 <---BIT

0.0 0.0 <---BIT NO. LINER LENGTH EFF BBL/STK


0.0 0.0 <---BIT I 6 10.00 0.95 0.0831
0.0 0.0 <---BIT II 6 10.00 0.95 0.0831
0.0 0.0 <---BIT III 6 10.00 0.95 0.0831
0.0 0.0 <---BIT IV 6 10.00 0.95 0.0831
0.0 0.0 <---BIT TOTAL 0.00024 0.0831
0.0 0.0 <---BIT

0.0 0.0 <---BIT

0.0 0.0 <---BIT

#DIV/0! ECD
#DIV/0!
GANTI INPUT DATA JIKA GANTI BHA RVG
DC
DESC DP HWDP DC DC 9.5
OD 5 5 6.5 8 3
` ID 4.276 3 2.81 3 94.54
LENGTH 358.57 0 0
PPF 19.5 50 92.8 147 152

DP RPG Mud Motor


0.00 0.13

0.000 1.10

BF -0.108

PT. PARAMA DATA UNIT page 1


EVERYTIME CHANGE BIT
put NOZZLE for TFA,Jet Vel & JIF calculation

PT. PARAMA DATA UNIT page 1


BIT NAME : BIT #
WELL NAME : SMP AAE-08 METERAGE HRS AVE. ROP %
SLIDE 0.0 0.0 #DIV/0! 0.0
ROTATE 22.0 3.2 6.9 100.0

SHEET FOR SLIDE / ROTATE


Start time 0.00 Last Bit Hours 0.00
DEPTH DEPTH SLIDE BIT DEPTH BIT HRS
START FINISH ROTATE TIME DIFF DIFF

33 55 R 3.2 22 3.2
55 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 R
0 S
0 R
0 R 0
0 S
0 R
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S
0 R
0 S

TOTAL DEPTH SLIDE 0.0 m


AVE ROP SLIDE #DIV/0! m/hr
TOTAL BIT HRS SLIDE 0.0 hrs

TOTAL DEPTH ROTATE 22.0 m


AVE ROP ROTATE 6.88 m/hr
TOTAL BIT HRS ROTATE 3.2 hrs

Slide: 0.0 %
Total Drilled: 22.0 METER
Rotate: 100.0 %
<<<PASTE TO REPORT

DEPTH DEPTH BIT HRS BIT HRS


Ave Rev Total
DIFF DIFF DIFF DIFF Time
SLIDE ROTATE SLIDE ROTATE RPM Surf Surf Rev Surf

22 3.2 0 1320 0 0
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 #VALUE! #VALUE! #VALUE!
40 #VALUE! #VALUE! #VALUE!
0 22 0 3.2 #REF!
LOST CIRCULATION SMPT.11 .WO

TANGGAL TIME STRING ANNULUS DESILTER DESANDER PUMPING GPM LOSS


8/10/2022 7:12 AM 90 540 630.00 0
8/10/2022 23:59 90 540 630.00 12150
8/11/2022 04:30 90 540 630.00 4050
6:30 94 540 634.00 1811.43
10:00 94 540 634.00 1811.43
14:30 98 540 638.00 4101.43
15:30 98 540 638.00 911.429
18:30 94 540 634.00 10415.7
21:30 110 540 650.00 10678.6
23:59 100 540 640.00 10514.3
8/12/2022 01:00 100 540 640.00 914.286
02:00 90 540 630.00 900
08:00 100 540 640.00 5485.71
09:00 600 300 900.00 1285.71
09:30 600 300 900.00 642.857
10:30 100 540 640.00 914.286
13:00 600 300 900.00 3214.29
17:30 115 540 655.00 3275
24:00 540 540.00 5014.29
8/13/2022 07:00 540 270 810.00 8100
12:30 110 540 650.00 5107.14
13:00 113 540 653.00 466.429
15:00 120 540 660.00 1885.71
16:00 800 800.00 1142.86
23:00 260 540 800.00 8000
24:00 160 540 700.00 1000
8/14/2022 00:30 160 540 700.00 500
04:00 160 540 700.00 3500
05:00 160 540 700.00 1000
07:00 160 540 700.00 2000
12:30 115 540 655.00 5146.43
14:00 0
16:00 0
18:00 0
20:30 0
23:00 0
24:00 0
8/15/2022 04:30 0
05:30 0
09:00 0
14:00 0
16:00 0
18:00 87 87.00 248.571
21:00 87 87.00 683.571
22:30 87 87.00 62.1429
23:30 130 130.00 185.714
24:00 0
16/8/2022 05:00 0
05:30 120 120.00 171.429
06:00 100 100.00 142.857
07:30 120 120.00 171.429
08:30 112 112.00 160
10:30 0
12:00 66 66.00 94.2857
16:00 66 66.00 94.2857
24:09
24:10
24:11
T.LOSS (BBL) REMARK
0 PUMPING
12150 PUMPING
16200 PUMPING
18011.4 PUMPING
19822.9 PUMPING
23924.3 PUMPING
24835.7 PUMPING
35251.4 PUMPING
45930.0 PUMPING
56444.3 PUMPING
57358.6 PUMPING
58258.6 PUMPING
63744.3 PUMPING
65030.0 PUMPING
65672.9 PUMPING
66587.1 PUMPING
69801.4 PUMPING
73076.4 PUMPING
78090.7 PUMPING
86190.7 PUMPING
91297.9 PUMPING
91764.3 PUMPING
93650.0 PUMPING
94792.9 PUMPING
102792.9 PUMPING
103792.9 PUMPING
104292.9 PUMPING
107792.9 PUMPING
108792.9 PUMPING
110792.9 PUMPING
115939.3 PUMPING
115939.3
115939.3
115939.3
115939.3
115939.3
115939.3
115939.3
115939.3
115939.3
115939.3
115939.3
116187.9 PUMPING
116871.4 PUMPING
116933.6 PUMPING
117119.3 PUMPING
117119.3
117119.3
117290.7 PUMPING
117433.6 PUMPING
117605.0 PUMPING
117765.0 PUMPING
117765.0
117859.3 LOGGING JOB
117953.6 LOGGING JOB